CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 1 Status of the UCSB Gantry Dean White University of California Santa Barbara October.
Status of the Tracker Outer Barrel J. Incandela University of California Santa Barbara for the TOB Group Tracker General Meeting December 7, 2005 Slides.
1 UCSB Module Assembly Week of 5/23-5/27. 2 FNAL & UCSB Inventory HybridsSensorsFrames FNALUCSBFNALUCSBFNALUCSB STHPKITSTHPKITSTHPKITSTHPKIT L12pu /
1 CMS week 15/03/05, Module Production Meeting, Dean White - UCSB Status of Sensor Bias Connection Dean White For the US CMS Group.
Anthony AffolderUS CMS Meeting 12/3/02Previous Burn-in Experience CDF Burn-in Experience Hybrid Burn-in à 4 days with extensive tests at start/end à ~9.
Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
Slide 1Susanne KyreDOE review, January 20, 2004 Wirebonding for TOB and TEC Susanne Kyre University of California, Santa Barbara.
CMS Tracker Week, CERN, July July 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting.
Slide 1Susanne KyreTracker week, October 2005 TEC/TOB bias bonds Susanne Kyre University of California, Santa Barbara.
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
CMS Week, CERN, September Sep 2003CMS Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 16 Sep.
Medipix sensors included in MP wafers 2 To achieve good spatial resolution through efficient charge collection: Produced by Micron Semiconductor on n-in-p.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
CMS Tracker Week, CERN, February Feb 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
February, 2007Vaclav Vrba, Prague FVTX Strip Sensor Design General features:  Strip pitch = 75 µm  # chip channels = 128;  chip width = 128 x 75 µm.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
Magnification showing pads and “bias ring” First Look at SiD Charge Division Sensors at SCIPP.
Available detectors in Liverpool
Design and fabrication of Endcap prototype sensors (petalet)
On behalf of the US TOB testing group
Hybrid & Module Testing Status
Update of US Testing Status
Review of CMN Problem/Studies
UCSB Short-term Testing Plan
UCSB Testing 3 Stereo Modules Tested 1 SS6 Module Tested
Results from module testing
Unexpected Failures of Modules on Rods
Module Failures on RODs
Module Failures on RODs
FNAL Module Testing Status
بسم الله الرحمن الرحيم الموضوع:الوضوء صفته وفرائضه وسننه
UCSB Short-term Testing Plan
HCAL HV splice box.
What we learned today Made test bonds on Al plate using bonding parameters of channel and bias bonds Inspected 10 bonds of each type None of them showed.
Damage under UCSB bias bonds
UCSB Module Assembly Week of 11/28 – 12/2/05 Week of 11/28 – 12/2/2005.
Noise in TOB modules and sensor quality
Hybrid Testing Status 10 new hybrids brought by Lenny all tested
UCSB Qualification Module Grading
Hybrid Status/Deliveries
Sensor probing (Summary)
First UCSB TEC Module (Pictures)
Hybrid & Module Testing Status
Passitivation Location
Noise in TOB modules and sensor quality
Production Status 39 modules produced
UCSB Module Assembly Week of 12/5 – 12/9/05 Week of 12/5 – 12/9/2005.
Status of 44 ARCS tested TOB modules, June 24, 2004
Operations/Failure Analysis
Is Increased Bias Current and CMN Correlated?
Hybrid & Module Testing Status
Wirebonding UCSB FNAL Machines
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Module Failures on Rods
Module Testing Status Week of 3/14-3/18.
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Equipment Status ARCS equipment status DAQ equipment status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Updates on the Silicon Tracker 2S Module
Practice Geometry Practice
FNAL Bonding Since our last report we have built and bonded an additional 10 TOB 4-chip modules 3 RMT pitch adapters 7 Planar pitch adapters By adjusting.
FNAL Hybrid Testing Status
Presentation transcript:

Discoloration of Passitivation Before wire bonding Discoloration of passitivation under wire bonds occur during wire bonding process. With old UCSB TOB bond shapes, it occurs under both channel and bias bonds With different bond geometries, discoloration smaller/bigger It is not clear what this discoloration is caused by, if it is potentially dangerous, or if it will get worse with time Dots and metal lines do not appear with bonding only; appears to be HV effect After wire bonding Bias Ring Guard Ring

Channel Bonds After wire bonding, the channel wires have divots that match to locations of passitivation edges on sensor Bonds looked at previously looked more pocked. Not clear if caused by powering module for ~8 hours

FNAL vs. UCSB FNAL UCSB FNAL bonds towards back of bond pad UCSB bonds towards front of bond pad Strength of discoloration appears to be correlated with nearness of bond feet and height of bond wire New bond shapes result in much less discoloration