SERVICING INFORMATION

Slides:



Advertisements
Similar presentations
VIDAS Blue Presentation - JD - 22 juin 2005
Advertisements

Engineer Training XL1200 Ink System. Engineer Training XL1200 Ink System Confidential 2 Ink System The XL1200 Ink System consists of the following elements:
Training Course on the WJ-HD300A Series DVR Hard Drive Replacement Procedure WJ-HD300A Series DVR.
Introducing. designed specifically to meet basic receipt printing needs with high reliability for the harshest of environments. NEW Budget, High Performance,
Build Your Own Computer Ed Evans Information in this presentation Copyright 2005 PC Media, Inc. All rights reserved. Reprinted with permission from
HTS5120 Rework Instruction for service centre Nov 18, 2010.
Print Head Removal, Replacement and Alignment. Page 2 CONFIDENTIAL Print Head Assembly Removal  Turn off printer A.C. power  Unplug the printer from.
L2000 Technical Training 6. Assemble/Disassemble.
Universal Holding Cabinet Two screws hold each side; four screws secure the top.
ESD Constant Monitor System Packaging Bench set-up.
Oki Printing Solutions Service Training for the B400 Series Printers B410 / B420 / B430 / B411 / B431.
2035 Series. Common Components The design of the 2035 Series valve includes many proven components for assured reliability. These items include: –Same.
How to Build A Computer By John A. Saiz. Materials Required Tools Screw driver Screw driver Tweezers Tweezers Flashlight FlashlightHardware PC Case PC.
Building a Computer Kate Chapin Capstone Project.
Machine tools Page 1-1 Machine tools Dr. M.A.E. SALEH Mech. Eng. Dept. Assiut University.
TSP800II Series Thermal Printers. Receipt & Specialty Printer Extra-Wide Format fits many applications. Label Printing Provides for Dual-Purpose Printing.
MC11000 Kit Replacement 1 1. Open the face plate and remove the 2 screws. Remove and discard the original face plate. 3. Remove the 2 white caps on the.
Die Cast – Nickel Die Cast – Black Metalized Plastic Black Plastic Grey Plastic Plastic - Assorted Colors –Available only on 972 Series.
Oki Printing Solutions Desktop Color Printers Service Training for the C710 / C830 Printers.
DA-250F/DA-250FH TOA Corporation. Features DA Series Multi-channel Digital Amplifiers.
Stephen Wolf Kirk Iler Brian Bentz Fuhe Xu. Current Schematics Micro, Motor, Keypad 2/2/2011Team 6: Defender2.
Procedure of Connecting Coil Unit In series with Capacitor 10 April 14 Product: Fully Automatic Washing Machine.
Setting up the Ricoh C305 Press F5 to start the Presentation
Control System and Electrical Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Fat Max VEX Organizing System These photographs show how a complete VEX kit can be stored in a Fat Max organizing system, containing three trays. Components.
Section 13.1,  Pg. 606 in your textbook SymbolNameSymbolName One cell SOURCE Ground CONTROL Three cells in series SOURCE Resistor LOAD Switch CONTROL.
Scratch Robots Merry-Go-Round Module. Supplies Premium Quality Junk 6-12V DC motor Large plastic plate 3x12” block of wood Sheet rock screws ??? Scratch.
Discovery Kits: Electricity. 1.5 V Battery Batteries in series Closed switch Open switch V Motor Components.
Installation of nephelometer Remove 4 screws from top round plate of instrument (will need a Phillips head screw driver) turn “neph” upside down (careful.
Computer Disassembly and Reassembly Presentation by: James Hinton, Derrick Sartain, and Steve Evans.
SP500 Series Dot Matrix Printer. Features & Benefits Tear Bar & Auto Cutter Versions – Flexible features to fit more applications. Select the version.
Fabric System Architecture Design: two distinct board designs; replicate and connect –modularity allows us to build any configuration of size 2 n Board.
CPA Micarta Based Rahul Sharma / Bill Sands. The present design shown in this document is based on the use of Micarta as the base material this will likely.
Compressor Replacement – ODU
Smart Agent Installation Required Customer Connections 5 Core Power Cable To Laser Head 1.Power To Laser Head 2.Ethernet 10/100 Connector 3.Mains Input.
1 Polarimeter build up and details Robert Lee. 2 View 1 Material (Removable plate, leg supports and rail guide spacer): Aluminum Leg supports attached.
OUT OF GAME TESTING INFORMATION WHATS NEEDED INSTRUCTIONS EXAMPLES 750/850 THERMAL TICKET PRINTERS.
Tools you will need #8 Torx driver #10 Torx driver Standard Phillips screwdriver Small (jewelers)Phillips screwdriver Small standard screwdriver.
Move 2 racks G16-RR2-4 G16-RR2-3. G15-PP-01 CKT G15-PP-01 CKT G15-PP-01 CKT G15-PP-01 CKT 8 G15-PP-01 CKT Power Feed.
Remove 4 Phillips screws that hold tape drive cover (2 on each side) Phillips screws.
Changing Brushes on Standard Style Motors. The FIRST step is to... Unplug the motor!
Product Guide “Line Thermal Kiosk Unit” Product Guide “Line Thermal Kiosk Unit” August 2007 PMU 2300 “Horizontal solution” PMU 2301 “Vertical solution-1”
By Daniel Arthur. Checklist Cover Power Supply CD ROM Floppy Hard Drive Cables CPU Fan Mother Board RAM CMOS Battery CPU Video Board Audio Board Computer.
WeldingRod’s Exactly Constrained 3D Printer Plate Identification and Stuffing.
PostBase Automatic Feeder Component Removal Service Training
Activity 4.2.8a Satellite Flight Satellite Robot Construction Guide
Date of download: 10/4/2017 Copyright © ASME. All rights reserved.
UNIT-II TURNING MACHINES
Flexible Manufacturing
Computers are your Future
Deconstructing a Printer
Include everyone’s name Picture optional
Dial (844) | How to Fix HP Printer Error 0x61011be5 ?
HOW TO CLEAR THE ISSUE OF PAPER JAM IN LEXMARK PRINTER.
HP Printer Number Call Here :
Canon Printer Number Printer Support Call:
Canon Printer Support toll-free number
Canon Printer Support. Canon Printer Support 24/7.
Canon Printer Support.
T400 Motor Replacement.
Welcome to Canon Printer Support (Canon Printer Helpline Number)
CL4NX +Dispenser (KITTING MANUAL)
6. Disassembly & Reassembly
CL4NX +Cutter (KITTING MANUAL)
not okay (no screw-on lid)
Restoring a Gunky Perkins Brailler To Health
Activity 4.2.8a Satellite Flight Satellite Robot Construction Guide
Removes these two screws that attach the Controller to the Hopper Box.
How many links? Linkage examples.
Reader Swap out Guide.
Presentation transcript:

SERVICING INFORMATION Series70 Printers SERVICING INFORMATION

REMOVE SCREWS Point out Carriage assy,print head,cable ribbon,etc. Test/feed sw Paper low REMOVE THESE 4 SCREWS REMOVE SCREWS

Top separated from base A better look at componets Serial brd oki brd IPI brd and connectors

Point out a/c sw Transformer Power connector

Point out serial brd (2 screws and connector Rom Shunt

This slide shows serial brd removed Rom Power supply section Screws and standoffs to remove board

Point out I/F connections Dip sw's Shunt

CUTTER SCREWS Point out 2 screws to remove cutter

Point out the cutter and presentor The canon motor and buehler motors

The cutter disassembled CANNON MOTOR ASSY 09-1485

BEUHLER MOTOR ASSY 09-7519

Where to lube Shear plate and gears LUBE HERE

Point out the major componets Test sw spacerack Paper feed mech HEAD GAP .013

SPACE RACK Carriage dissambled Go over the componets and how to dissamble CARRIAGE CABLE 98-7060 RIBBON FEEDGEARBOX 98-7061 SPACE MOTOR 98-7280