1 VIDAS Blue Presentation - JD - 22 juin 2005

2 VIDAS BLUE PRESENTATION
VIDAS Blue Presentation - JD - 22 juin 2005

3 VIDAS BLUE VIDAS BLUE: New Vidas and mini Vidas look
VIDAS Blue Presentation - JD - 22 juin 2005

4 The main changes VIDAS BLUE
VIDAS Blue Presentation - JD - 22 juin 2005

5 VIDAS BLUE VIDAS Blue Presentation - JD - 22 juin 2005

6 VIDAS BLUE Blue tray covers Strip preparation tray

7 strip preparation tray
VIDAS BLUE Removing strip preparation tray

8 Mini VIDAS BLUE

9 Mini VIDAS BLUE New screen / keyboard Holder New printer paper holder

10 VIDAS BLUE Internal changes

11 VIDAS BLUE On mini VIDAS: Addition of a long screw to fix the right trim

12 VIDAS BLUE On mini VIDAS: Screen/keyboard holder 3 fixing points:

13 VIDAS BLUE New Power Supply Assembly: Only 4 external points of fixation (4 screw) Central chimney (V30) No railing(bar)

14 VIDAS BLUE New Power Supply Assembly: - Only 1 Power Supply Board (V12/V30) - 1 air fan - Self switching Power Supply (110/220V)

15 New Power Supply Board:
VIDAS BLUE New Power Supply Board: Dedicated mini Vidas and Vidas connectors. VIDAS Mini VIDAS Be carefull Respect the correct connector!

16 Fixed by 4 plastic retainers
Spare part If Air Fan out of service: Software T° error will be generated Automatic Power Supply cut off VIDAS BLUE New Power Supply Board: Air Fan

17 New tray ball bearings:
VIDAS BLUE New tray ball bearings: Excentric ball bearing replaced by a normal one fixed on a spring mechanism. No more lateral play to adjust

18 VIDAS BLUE Tray motor assembly: Addition of a pretensionning spring
CAUTION! Lock the motor Assy when it is in the good position Addition of a pretensionning spring

19 VIDAS BLUE Tower screw: To reduce the tower misalignments
Addition of a spacer To reduce the tower misalignments

20 VIDAS BLUE Incubator door: - New door plunger ball nut
- Addition of a safety latch

21 VIDAS BLUE New electronic boards: Incubator Boards Scanner Board

22 VIDAS BLUE New Scanner Board: New Power Supply 3.3V LED
Flash ROM U5 ( V2.51) (replace the EEPROM) Sensors LEDs DIP Switch SW3 (replace JP7/JP8/JP9) Scanner cable breakdown detection LEDs Power Supply LEDs (+5V/+10V/+12V/-12V) Communication LEDs Mini Vidas Blue Backlight Power Supply connector J15: Scanner Cable new Connector for failure detection (replace coax. cables )

23 VIDAS BLUE New Scanner Board: 100 % compatible with the old boards
One Flash ROM V 2.51 instead of 3 EPROM V2.41 100 % compatible with the old boards SW3 replaces Jumpers JP7 to JP9 New power supply 3,3V New connector (J18) dedicated to the mini Vidas screen backlight power supply. New connector (J15) for scanner failure detection ( replaces coax cables) REF. SCANNER BOARDS : VD8201-1

24 VIDAS BLUE

25 VIDAS BLUE

26 VIDAS BLUE New Incubator Board: Double support Flash ROM U5
or EPROM V 3.10 Power Supply LEDs Heaters LEDs DIP switch SW2 (replace adress/ reset jumpers) Serial communication with scanner board LEDs Sensor LEDs

27 VIDAS BLUE New Incubator Board: 100% compatible with the old boards
Available with EPROM 3.10 or Flash ROM (same version) VIDAS BLUE New Incubator Board: 100% compatible with the old boards Dip Switch SW2 replace all Adress and Reset jumpers ( silkscreen directly on the board). LEDS for Power Supply, communication, sensors and heaters. Fuses (SMD) F1 to F4 REF. INCUB.Board : VD8202-2

28 VIDAS BLUE

29 VIDAS BLUE

30 VIDAS BLUE SCANNER: new parts New mini VIDAS/ VIDAS scanner cables
New scanner cables with failure detection (replace coaxial cables) The blue flat cable is still the same

31 VIDAS BLUE SCANNER: new parts New Scanner PRE-AMP board
J1 connector unchanged, use with both old scanner câble kits and new Scanner cables. New J2 connector, is only used with new scanner cables and new scanner Board. (Allows scanner cable failure detection)

32 VIDAS BLUE : reminder The scanner cable failure detection system is available only with a new Scanner Cable, new Scanner Board, and new Scanner Head. The LEDs (DS9 to DS12 from the new scanner board) are on When a cable is broken. ( off = cables OK) If a scanner cable failure is detected, a blocking error 161 will be generated. The new Scanner head is compatible with the old Scanner head But  don’t forget to replace the new scanner cable by an old scanner cable kit in order to be compatible with the old scanner board

33 VIDAS BLUE Changes impact
Decontamination:  a new procedure has been defined to take Into account the « Strip preparation tray ». Error 161:  If err. 161, check the integrity of the scanner cables. ( LEDs off on scanner board = good) PM : Scanner cable replacement every 2 years  Non Applicable PM :  tray lateral play not necessary to set PM : Power Supply  not necessary to open it during a PM (If dead, replace the complete block.)

34 VIDAS BLUE Compatibility table
(*) Scanner Head Blue : put an old scanner cable kit (**) Scanner Cable Blue: only used with a new Scanner Head and new Scanner Board. VIDAS Blue Presentation - JD - 22 juin 2005

35 VIDAS BLUE You will receive a specific Mandatory Action Required (MAR)
from GCS soon. More details will be added in this MAR . Feel free to contact us for many information :