Welcome.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

Fullerton College Bond Fund Projects Update Fullerton College Athletics Project Scope Overview Schedule Parking.
Emmet County Headlands Public Meeting on the Future use of the Headlands Property and Structures.
FACILITY PLANNING October 1, :00 PM – Raymond School Tour 6:30 PM – Interactive Workshop Raymond Community Workshop.
January 6. January 7 January 8 January 9 January 10.
FORT PIERRE & PIERRE COMMUNITY MOPTF (MAYOR’S OUTDOOR POOL TASK FORCE) APRIL 21, 2008.
PUBLIC BORDER OPERATORS ASSOCIATION BORDER INFRASTRUCTURE PROJECT UPDATES Canada – United States Transportation Border Working Group Meeting Vancouver,
Alliant Energy Field Renovation. September 2005 Work area blocked off Pitching mound is flattened.
UBC Athletics and Recreation – Facilities overview / Master planning.
WJJ Middle School Facility Study Tri Board Meeting February 5, 2015.
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 01/04/13.
Accredited with “Distinction in Performance” St. Clair R-XIII School District.
Logo. PRELIMINARY SITE PLAN PROGRAM GOALS Embrace & live out our Mission Grow in commitment to Christian living through: Education, Worship, Stewardship,
LUCIA MAR UNIFIED SCHOOL DISTRICT Facilities Update Facilities Master Plan & Sustainability Projects Information.
ET-493 Senior Design By: Brian Toomer Advisor: Mr. Rode’
Alpha Borough Community Recreation Project Preliminary Design Presented by Group 3 February 28, 2002 From left to right: Pamela Vislocky, Erin O’Brien,
Larrison Pavilion Deming Park Terre Haute, Indiana.
Fullerton College Physical Education Project Community Meeting March 11, 2009.
ACQUATICS FACILITY STUDY City of Vincennes Department of Parks & Recreation.
S.M.A.R.T. Project Proposal December 9, 2014 Referendum.
THE DESIGN PROCESS. General Design Process Need –Determine functional requirements… Specification –Identify essential problems […] –Search for … solution.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Thomas F. Joos, P.E. Civil/Structural Engineer BNL Plant Engineering Division May 8, 2007 NSLS-II Conventional.
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
 Part 2: Community Design: Respect and Care for the Natural Environment Joe Duggan 1.
FAMILY LIFE CENTER Building Committee Update November 23, 2014.
Construction Report January 19, Projects Track replacement and turf In Progress Walking tracks: Recommendation Water wells March 2010 Bleachers.
Colstrip Public Schools: Phase II – Facility Planning Daniel A. McGee | Tyler Bush | October 30, 2014.
WRAC Issues Workshop EAA/STA-2 Expansion Cell 4 April 11, 2005 Acceler8 Overview.
ULCH Stormwater Fees An Equivalent Stormwater Unit (ESU) is calculated so 1 ESU covers the average impermeable surface in one normal city lot Given all.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District January 23, 2012 EDUCATE  ENGAGE  EMPOWER 1.
AQUATICS FACILITY Conceptual Proposal March 1, 2007 Hilton Head Aquatics with Island Recreation Center.
Return site to its rightful glory with cleaner water and more enjoyable experience Propose appropriate additions and renovations to pool, buildings and.
Brazoria County RESTORE Act Projects
TOMMY OLIVER STADIUM John Bozarth February 23, 2016.
Item 6b. Project Vicinity Park Ave Bridge Existing Park Avenue Bridge.
Facility Committee June 17, Othello Community Pool Features: Leisure amenities: including a 2,800-square-foot leisure pool, lazy river and spray.
Miller Driscoll Building Committee Update Tuesday, January 7, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions & Alterations Miller-Driscoll.
Merritt College Proposed New Science Complex PCCD Board of Trustee Meeting May 20, 2008 Presented By Dr. Sadiq B. Ikharo, Vice Chancellor Department of.
ET 493 – Senior Design Design of a Multi-Office Building BY: WOODROW WILSON INSTRUCTOR: DR. C. KOUTSOUGERAS ADVISOR: MR. R. EDWARD RODE.
Bancroft Elementary School School Building Committee Meeting February 24, 2010.
Miller Driscoll Building Committee Construction Update Thursday April 7, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions & Alterations.
Miller Driscoll Building Committee Construction Update Thursday February 4, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions &
MASTER PLAN UPDATE February 15, 2017.
San Mateo – Foster City School District
BLAKELY  Welcome.
High School Capacity Committee
De Pere Aquatic Presentation
Foundations of Technology Construction
Addition of Fire Alarm system. None existing.
Hazel Avenue Widening Project Presentation To CGSA April 25, 2017
CFAC Review NSLS-II Conventional Facilities Update
Design of a Commercial Shopping Center
Multistory Office Building
Design of a Commercial Shopping Center
Multistory Office Building
Construction Report March 25, 2010.
Commercial Office Building
HARWICH FIRE STATION 2 Board of Selectman Presentation 11/06/2017.
14 High Leys Drive, Ravenshead, NG15 9HQ
Henderson Park Family Outdoor Aquatic Centre Renovation
Potential Milestones A timeline to finish in one year
Athletic Alternate Opportunity
District 4 Community Park Meeting Nov
Foundations of Technology Construction
Xoserve IX Refresh Customer Update 03/01/2019.
Competency: Create site plan drawings
Proposed Facility Capital Project List
Bond Program Update November 2018 – January 2019
Multi-Family Fourplex Apartment
Facilities Update Garden Grove Unified School District
Presentation transcript:

welcome

Myers Pool Rehabilitation Winooski VT

Update on Project Current Phase – Preliminary Engineering Subsurface Investigation Hazardous Testing Schematic Design Goal of this phase is to determine the Construction Cost of a new facility.

Timeline December – January: February – March: Geotechnical Testing and Hazardous Sampling. Selection of Features and Amenities. February – March: Finalizing Preliminary Drawings Construction Pricing Remaining Project Milestones: Approximately 6 Months for Final Engineering Approximately 1 Year for Construction

Description of Proposed Design Complete removal of existing pool, filter building and partial demolition of the existing building. Two new pools – Competition Pool and Family Pool. Renovated Bathhouse with new addition. New Pool Deck. ADA access and accessible facilities.

Proposed Pools Competition Pool Family Pool Six lane competition pool. Depths 4 FT to 8 FT. Family Pool Beach Entry Depths 0 FT to 4 FT Interactive spray features Amusement Park style Water Slide

Proposed Building Utilize existing foundation and rough timber roof Structure. New Mens & Womens Locker Rooms plus Family Changing Rooms. Accessible Bathroom for Landry Park Patrons Community Room and Concessions New Reception and Entry Area Filter Room Facility

Site Layout

Questions??

thank you westonandsampson.com