1 Fullerton College Physical Education Project Community Meeting March 11, 2009

2 Discussion Items  Community Concerns  Initial Study – CEQA Requirements  Status of Project Lighting Bleachers Sound System Traffic  Project Phases  Project Budget

3 N. BERKELEY AVE. N. LEMON ST. E. CHAPMAN AVE. Phase 1 Olympic Pool 50 Meter Pool Replaces Old 25 Meter Pool 1 Meter and 3 Meter Springboards Pool Pump House Building Fire Pump Building Serves as Additional Fire Protection to Campus Tennis Courts Refurbished New Fire Lane FIRE LANE Fullerton College Athletics Project

4 N. BERKELEY AVE. N. LEMON ST. E. CHAPMAN AVE. Phase 2A Artificial Turf Fields Football, Soccer and Track and Field per NCAA Standards 1,500 Seat Home Bleacher & Pressbox 500 Seat Visitors Bleacher Six 100 ft. Light Poles with Directional Reflectors  76.6 footcandles for games (30 footcandles for simple use)  0.6 footcandles at 100 ft east (1.5 footcandles on vertical)  0.16 footcandles at 150 ft east ( 0.5 footcandles on vertical) Fieldhouse 20,000 sf / 2 Stories Locker Rooms/Training Field Support Services 3 Classrooms 10 Offices 6 Workstations Roof Plaza Assembly Space (1,800 sf) 60 New Parking Stalls Fullerton College Athletics Project Level 2 Level 1 Light Pole Reflectors

5 Phase 2C Dance Studio New Lighting and A/C Refinished Floors and Paint Corridors New Lighting, Floors, and Paint Restrooms Storage Phase 2B South Gym New Lighting and A/C Refinished Floors, Paint Refurbished Basketball Equipment Women’s Locker Room New Lighting and Ventilation Refurbished and New Showers New Dedicated Team Rooms New Bathrooms Coaches Locker Rooms Officials Changing Rooms Equipment Storage Fullerton College Athletics Project

6 Phase 2D North Gym New Power Retractable Bleachers w/Assistive Listening Refinished Floors New Lighting and A/C Mezzanines Renovated for Multi-Purpose Use New Lights, A/C & Paint (16) Offices & (2) Meeting Spaces New Storage Men’s Locker Room New Lighting and Ventilation New Lockers Refurbished and New Showers New Dedicated Team Rooms New Bathrooms Phase 2E Outdoor Sports Court New Sand Volleyball Pit New Basketball Half-Court Refurbished Strength Lab Expanded Training Facilities New Circuit Lab Fullerton College Athletics Project

7 N. BERKELEY AVE. N. LEMON ST. E. CHAPMAN AVE. Additional Work Playing Field Bleachers/Pressbox Jump Events Signage Throwing Field Doors Security Access Hardware Value Engineering Dance Studio Floor Repair Ballet Bars South Gym Bleachers Fullerton College Athletics Project

8 Project Cost Construction Cost Pool $ 5,227,300 PE South Gym 4,651,200 Firelane 659,600 PE North Gym 4,033,100 Fieldhouse 9,079,600 Sub Total $ 23,650,800 Field Lighting $ 461,500 Bleachers799,000 Field Improvements2,900,400 Sub Total $ 4,160,900 Architect Fees & Other Consultant Fees $ 7,511,500 Total Project Cost $ 35,323,200