1 Colstrip Public Schools: Phase II – Facility Planning Daniel A. McGee | Tyler Bush | October 30, 2014

2 Challenges Facing Every School District Your Budget Your Facilities Your People Big Issues

3 BUILDING OPERATION LIFECYCLE OPTIMIZATION IS AN ONGOING CYCLE Demographics / Planning Financing Options DesignConstructCommissionOperateSustain Pages from COLSTRIP Final report 12 16 2013.pdf..\Colstrip report 2013.pdf

4 Implementation of Phase II Define Facility Improvement Measures High School Lower Level Renovation High School Auxiliary Expansion November 2014 – Concept Directed Engineer Study Proposal – December 8 th – Action Item December 2014 – Proposal – Schematic Design PhaseJanuary 2015 – Development – Design Development Phase Guaranteed Maximum Pricing proposal – February 9 th – Action Item February 2015 – Design BuildFebruary 2015 –Construction DocumentsFebruary 2015 thru September 2016 –Construction

5 2014 IBES / FBMS Budget Breakdown Frank Brattin Middle School – Utility Only Budgets Heating (Propane) $70,000 Electrical $91,000 Water / Sewer$56,000 Telephone / Minor equip / Supplies$3,700 Total Middle School Utility Costs$220,700 Isabel Bills Elementary School – Utility Only Budgets Heating (Propane) $0 Electrical $11,925 Water / Sewer$2,000 Telephone / Minor equip / Supplies$1,500 Total Middle School Utility Costs$15,425 Total budget available with closure of IBES and FBMS = $236,125..\12-9-13 Presentation\Colstrip Expenditure Report 2014.pdf..\COLSTRIP Final report 12 16 2013.pdf

6 2014 IBES / FBMS – Defferred Maintenance Total budget available with closure of IBES and FBMS = $236,125 Multiply over 15 years with escalation at 3% = $4,391,669 Additional maintenance budget and property insurance | Determine what percentage to be divided by percent of square footage of elementary district. Total budget $213,087 Total budget with percentage of other maintenance dollars = $378,894 Multiply over 15 years with escalation at 3% = $7,047,017 *Mothballing a facility will require a portion of these budgets to remain in place. Estimate 25% of heating costs - $20,481 annually. Cost avoidance of other maintenance budget $147,995 or $2,527,140 over 15 years. Forecasted Future Differed maintenance expenditures Frank Brattin Middle School – Library and east side 88 edition windowPrivacy partitions for bathrooms Science lab faucetsConcrete Settling Isabell Bills Elementary School - Hot water heaterCooling Tower Boiler Both Schools – Doors - Closers both buildings Door nobs both building Panic bars both buildings Pics

7 Estimated Demolition Cost – Cost avoidance Frank Brattin Middle School – Demolition Cost – Building $492,680 Demolition Cost - Footings $21,490 Dump Fees - $420,000 Other related cost – GRT, Contingency, Bond, ETC. $337,790 Total Estimated Demolition Cost$1,271,960 Isabel Bills Elementary School – Demolition Cost – Building $177,600 Demolition Cost - Footings $13,673 Dump Fees - $217,000 Other related cost – GRT, Contingency, Bond, ETC. $147,628 Total Estimated Demolition Cost$555,901 *The budget numbers listed are budget numbers based on 2014 RS Means, district could capture this as cost avoidance for future project financing. CPS Bldg demo.xlsx

8 QUESTIONS? CONTACT Daniel A. McGee Account Executive (406) 544.2815 danmc@mckinstry.com Tyler Bush Senior Program Manager (406) 426.0079 tylerb@mckinstry.com