Work load and responsibilit y npor. Ing. Miroslava Šimonová
Structure 1. Air traffic control at the Přerov airport 2. Work load 3. Responsibility
1. Air traffic control at the Přerov airport Aerodrome control tower aerodrome control approach control precision radar approach control Class D of the airspace
1. Air traffic control at the Přerov airport Aerodrome control – TWR -Aerodrome traffic -VFR flights in control zone -IFR (departure, arrival) + SVFR flights according to coordination with approach controller
2. Work load Takeover of ATC unit Familiarization with the condition, rules Inspect radio technical aids Adjust airport lights Evaluate the ornitological situation and the weather Complete activity reports
2. Work load Conduct pre-flight briefing Listen to the frequency Issue clearances and instructions Monitor and direct aircraft and vehicles Visual control
2. Work load Provide separation between arriving and departing aircraft Transfer/accept control of departing/arriving flights to adjacent ATC units Communication and coordination with the surrounding ATC units
2. Work load Contact pilots to provide/relay information Give recommendation/restrictions to flights in my area of responsiblity Alert airport emergency services
2. Work load -Knowledge of rules, regulations, directives -Use standard phraseology -Speak clearly and distinctly -Experiences
3. Responsibility -Safety -Fluency -Economy
Thank your for your attention