JMP EDA Transport Study South Marston Samantha Howell Principal Transport Planner Strategic Growth and Regeneration Team.

Slides:



Advertisements
Similar presentations
Housing Growth in Leicestershire 1 February 2008.
Advertisements

A34 Corridor Strategy Strategic Route Improvements 25 th November 2004 working together with.
Limerick City Green Routes Corridor Selection Study Presentation to Limerick City Council 14 th February 2008.
Sustainability, accessibility and transport strategy management
Claire Milne Windsor Neighbourhood Plan Co-chair
Paul Rubinstein Service Director - Regeneration Woodford BAE Systems Site Bramhall and Cheadle Hulme South Area Committee Thursday January 27th 2011.
Copyright 2009 Northumberland County Council Northumberland Local Plan Core Strategy Update Riding Mill Parish Council 28 April.
Totnes Bridge Presentation to Totnes Town Council 5 November 2012 John Fewings.
What are “Pinch Points” PPinch Points are areas identified on the Highways Agency network of roads that experience high levels of congestion TThe.
Study Area What is this consultation about? This consultation has been prepared to seek your views and provide you with information about proposed transport.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Humber Bridge Review Results from the HUMBER ESTUARY TRANSPORT MODEL.
Arlington Traffic Management Plan Presentation to Arlington Parish AGM 19 th April 2012.
Presentation to the Executive of the Carlisle Partnership 13 July 2009.
Hill Place Farm East Grinstead Presentation to East Grinstead Town Council Monday 4 th August 2014.
Mid Wales LTP Stakeholder Workshop 3 rd October Presentation by Ann Elias and Janice Hughes.
South Bedfordshire District Council Sustainable Development Services Away Day Transport Strategy performance update Manouchehr Nahvi Tuesday 8 th April.
TRANSPORT The Cambridge Futures response to the Draft Structure Plan Dr Tony Hargreaves, Cambridge Futures.
INTRODUCTION THIS IS AN EXHIBITION OF THE “CAMBORNE POOL REDRUTH TRANSPORT STRATEGY STAGE 1” PLANNING CONSENTS WERE GRANTED IN NOVEMBER 2008 AND JANUARY.
Infrastructure planning Sustainable Development Partnership 21 April 2009 Sustainable Development Partnership work programme discussion Designing the social,
Renaissance Southend Ltd Southend Borough Council Buses In-Depth Scrutiny 12 December 2007 Mike Lambert – Chief Executive.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Planning for the future of our district Core strategy options Presentation to C4B Associates February 2010.
Problem 1: Determination of Facility Types for Analysis.
Totnes Old Bridge Presentation to the Totnes Traffic and Transport Forum 10 October 2012 John Fewings.
21st October 2015 Stillorgan Village Area Movement Framework Plan PUBLIC CONSULTATION INFORMATION PERIOD DOCUMENT.
Collaton St Mary Masterplan: Additional Consultation on Access Arrange ments Introduction This consultation is about options for access into the Collaton.
Rookery South Resource Recovery Facility (RRF) Community Liaison Panel Transport Presentation – 14 th December 2009 John Hopkins, Peter Brett Associates.
SWIFT NETWORKING MEETING: NEW EASTERN VILLAGES (NEV) 24th September 2015 Samantha Howell Strategic Allocations Planning Manager and NEV Programme Lead.
Capital Insight Pty Limited ABN Berry Street North Sydney NSW 2060 t f RPA Masterplanning.
Submission Document went to cabinet … Planning for the Future Core Strategy and Urban Core Plan (the Plan) is a key planning document and sets out the.
SPEED TABLES FOR CORONADO ROAD BETWEEN 7 TH STREET AND 10 TH STREEET.
A64 (T) Hopgrove Roundabout Improvements. Background The roundabouts at Hopgrove are located to the north east of the City of York and form a junction.
STAMFORD CAPACITY AND LIMITS TO GROWTH STUDY SOUTH KESTEVEN DISTRICT COUNCIL FINAL REPORT PRESENTATION PRESENTERS: UNA McGAUGHRIN JESSE HONEY 14 TH DECEMBER.
By Stefanie Rachmann-Davies “A discussion upon the NPPF’s use of ‘Severe’ as a term of impact severity and how this is being interpreted within the industry.”
Planning Overview, Newbury Gary Lugg Head of Planning and Countryside.
March 2016 Helen Smith Freight in the City Greater Manchester Logistics & Environment.
Land west of Grace Crescent, Hardwick Presentation to Hardwick Parish Council 23/08/2016.
Existing MOVA Control Existing Layout Operational Issues Including: Controlling each junction approach ‘in turn’ can result in long ‘wait times’ for both.
TfN Freight AND RAIL UPDATE
Scenic Highway – Public Meeting
Three Southern Counties
Downtown Valdosta Truck Traffic Mitigation Study
Strategic Transport Forum Friday 15th September 2017
Vale of Aylesbury Local Plan
Western Orbital Local Liaison Forum 11TH September 2017.
Cambourne to Cambridge
MMETAG Conference - Marston Vale 2050
Arlington Traffic Management Plan
M40 J12-J14 – Data Analysis, Modelling and Scheme Development
Draft Transportation Element September 6, 2017
Grey County Transportation Master Plan
A future benefit for the South Cheshire infrastructure
SIZEWELL C: STAGE 2 CONSULTATION
The Regeneration of Swanley
KEYNOTE STAGE SPONSOR.
A future benefit for the South Cheshire infrastructure
City Connect 2 LEEDS CITY CENTRE IMPROVEMENT JOHN WHITE – PROJECT LEAD
New Southwark Plan: Area Visions and Site Allocations Consultation
Problem 5: Interstate 87 Interchange
Problem 5: Network Simulation
WPC S P D Concerns.
Stockton City Council December 6, 2007 Land Use Diagram Changes
KEYNOTE STAGE SPONSOR.
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
3 November 2017 Fraserburgh and Peterhead to Aberdeen Strategic Transport Study: STAG Part 1 Plus Bob Nicol: Project Director David Murtagh: Project Manager.
Timeline for developing RTS 2040
Cambourne to Cambridge Better Bus Journeys: On Road Option
Western Orbital: M11 J11 Park and Ride Provision
Histon Road LLF Resolutions and Programme
Presentation transcript:

JMP EDA Transport Study South Marston Samantha Howell Principal Transport Planner Strategic Growth and Regeneration Team

JMP EDA Transport Study JMP commissioned in partnership by SBC and Highways Agency to assess the transport implications of the Eastern Development Area (EDA) Initial assessment - 12,000 dwellings Further assessment of c7,000 dwellings to reflect lower quantum of development in Revised Proposed Submission Draft Core Strategy

Context WSP Swindon Transport Strategy South Marston Village Strategy LDA Framework and Draft EDA SPD NEW Masterplanning ‘Planning for Real’ Workshops

Scope of Study Transport modeling at strategic and local level SATURN – understands how traffic assigns across the wider network PARAMICS – microsimulation model looking at EDA area including South Marston Local model developed for all signalised junctions in the EDA area Scenario testing: ‘worst case’, mid-range & ‘stretch’ Appraisal of potential transport interventions/mitigation

South Marston Stage 1: assessment of existing issues Stage 2: future proofing potential solutions against impact of growth at the EDA

Stage 1 Vehicle counts and site observations Meetings with South Marston Parish Council, Traffic Sub-Group and NEW Masterplanning Key issues: Pedestrian and vehicular conflict at Pound Corner Perception of rat-running, high volumes of through traffic and speeding HGV’s getting lost or taking short cuts Noise disturbance of speed humps

Stage 2 Key questions: Can the masterplanning principles set out by SBC/NEW Masterplanning be achieved in transport terms? Are the ‘southern’ and ‘eastern’ link roads necessary? What are the transport implications of Rowborough?

Scenario Testing* 955 total dwellings (SBC) 613 total dwellings (NEW Masterplanning Option 1b) *includes potential brownfield development at Crown Timber and Thornhill Industrial Estate and assumes 35 dwellings per hectare

Options Tested ‘Baseline’ – extended village, no mitigation, and connection to Rowborough Southern Link Road (Thornhill Road/Old Vicarage Lane/Rowborough) Eastern Link Road (Highworth Road to Rowborough Combinations of the above Journey time – proxy for congestion and delay – and length of queueing

Baseline Assessment - Key findings Increase in traffic but from relatively low base Traffic not only related to expansion of village but increase in through traffic to EV destinations Rowborough traffic impacts mainly on Keypoint / Old Vicarage Lane/ A420 junctions Queuing at Keypoint roundabout, particularly in the morning peak (increase in journey time variability) PM peak traffic conditions are better than AM peak

Pound Corner Northern end of Old Vicarage Lane could be realigned New junction to the west of Pound Corner (as per NEW Masterplanning proposals) could be provided Junction to either be signalised or mini roundabout Signalised junction – improved crossing facilities for residents Mini roundabout – less urbanised and provides opportunity for new ‘gateway feature’ Old Vicarage Lane (Pound Corner to school) becomes local access only. Probably in northbound direction. Permits provision of new footway BUT NOT RECOMMENDED

Southern Link Road Direct/no connection to Rowborough Same evidence base Reduces risk of uncoordinated infrastructure provision Allows what if scenarios to be tested Determines what impact the EDA is going to have 12

Southern Link Road Indirect connection to Rowborough Same evidence base Reduces risk of uncoordinated infrastructure provision Allows what if scenarios to be tested Determines what impact the EDA is going to have 13

Southern Link Road – Key Findings Direct connection to Rowborough increases journey times and leads to more queuing at Gablecross Most of the traffic leaving/arriving from Rowborough is to / from the south (limited impact on South Marston) Indirect connection and no connection to Rowborough provides improvement in journey times at Gablecross Increased journey times are a consequence of heavy traffic on the A420.

Eastern Link Road – Key Findings (indicative link Supermarine Roundabout) Not a strong case in traffic terms Modelling indicates that this would not be heavily utilised (much of the traffic ‘rat running’ through village is from the north and to the EV District Centre and employment areas south of the A420) Morning peak conditions are worst overall across the network but most of the traffic leaving Rowborough is travelling south onto the A420, not north.

Other Considerations In all scenarios, existing chicanes will not be appropriate for village roads carrying higher traffic volumes Impact on journey times influenced by traffic on A420 Balance needs to be sought between priority for strategic and local traffic Improvements to the A419, White Hart Junction, Gablecross and A420 / Old Vicarage Lane junctions are important in mitigating full impact of EV

Recommendations 20mph zone in village (30mph from Keypoint and A420) Footway improvements Public rights of way and bridleways should be retained Psychological traffic calming, removal of chicanes and selective carriageway widening Signalised crossroads at Gablecross junction Further consideration new signalised junction east of the of A420 / Old Vicarage Lane junction and links toRowborough

Next Steps Finalising report Any comments must be received by 5pm on 22nd March 2011 South Marston Core Strategy Exhibition – here on 12th April between 5pm and 9pm Additional scenario testing and further consideration of options at Pound Corner and Old Vicarage Lane/A420 Junction

E-mail: showell@swindon.gov.uk Thank you. Any questions? Contact details E-mail: showell@swindon.gov.uk Tel: 01793 466500 www.swindon.gov.uk