Www.company.com AE 221 Bio-behavioral Health Building Group members: Alec Canter Matt Gillis Mike Hardesty Jason Ellis Kevin Kelly Ben Mank Kevin Barth.

Slides:



Advertisements
Similar presentations
Installation Law Briefing
Advertisements

Framing.
Aerospace Fastener Applications
Sectional Assembly and Installation
Exterior Window and Door Frames
Presentation Overview
Doors Wood Framed Doors.
FVCC Fire Rescue Forcible Entry.
Ceramic Tile Installation Step 5 – Install Tile TNC EDUCATION SERVICES, INC Instructional Design and Learning Management.
NGfL CYMRU GCaD FLOOR COVERINGS.
Interior Wall and Ceiling Finish
Fasteners Any device used to hold 2 or more pieces of material together or in place Shank – long stem part of a nail/screw.
Location: No 4 sharafadeen shoyege Magodo Estate Lagos Nigeria
Grounding Electrodes.
Unit 45 Metal Framing Industry and Code Regulations • Light-gauge Steel Framing Members • Fasteners • Framing Tools • Metal Framing Safety • Light-gauge.
Floor-Plan Dimensions and Notes
KCDC Knox County Development Corporation Virtual Building 50,000 SF Manufacturing- 4,300 SF office building.
WOOD LIGHT FRAME CONSTRUCTION
“A World Leader In Plastics Technology”
CON 4003 Construction Estimating Prof R. V. Locurcio.
Heavy Concrete Construction Formwork
Breaking and Breaching. Tools Used Sledge hammers –Long and short handled Chisels Pinch point pry bar –“Crow bar” Hacksaw Handsaw Bolt cutter Flat head.
Kysor Panel Systems Product/ Tools Training
Commercial Framing C D Prints Unit 13.
Design C a s t i n g E r e c t i o n F i n a l S t r u c t u r e D e s i g n C o n s t r u c t i o n P r o c e s s P r e–c a s t C o n c r e t e 3D M o.
PERMITS & INSPECTIONS DEPARTMENT 2003 INTERNATIONAL RESIDENTIAL CODE IRC.
Masonry. Terms –F > 15-5 –Go thru all figures –Joints between brick = ¼ inch.
PowerPoint Presentation
CTC 422 Design of Steel Structures
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 1 Slide 1 Unit 1 CADD Part III.
Chapter 7 Metals.
Objectives : ANALYZE home maintenance techniques.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Floor Systems and Foundation Support
Concrete Construction
CONSTRUCTING A FIVE CABIN LATRINE
Metals. Introduction u Metal is used in various places in the construction process including: –rebar = reinforcing steel in round shapes –flashing = thin.
1Furmanite Confidential - 1/9/04 Motor and Pump Base Foundational Repair.
The ground must push up as hard as the building pushes down
Appendices Subpart R Steel Erection
BUILDING CONSTRUCTION V ARCHITECTURAL FINISHING SYSTEMS
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
CONSTRUCTING HOMES & OTHER BLDGS. Preparing the Construction Site –Clearing the Site: the site must be cleared of anything that would get in the way of.
Balloon Frame North-American invention, 1833
Wall and Ceiling Construction
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
Finishing the Building
INTD 54 other components. moldings cover, enhance and decorate a plain surface standing trim: fixed length—doors & windows.
Chapter 32 Floor Systems and Foundation Support. 2 Links for Chapter 32 Slab Construction Reinforcing Concrete Crawl Spaces.
Residential Construction Mr. Todzia
Wall Framing Grimsby Secondary School Technology Dept.
EDT Cabin Design Project - Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300 Kenneth Fitzpatrick, P.E.
Chapter 43 Common Commercial Construction Materials.
Sign Structures Updates: Helpful Tips for Inspectors
Acoustical Metal Pan Ceilings [ ] Tena Pettit.
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
Drafting 2 (Arch) Quiz Review #6 Quiz Review. 1.To anchor a stud wall to the subfloor, carpenters nail through the: Sole plate Header Jamb Joists Quiz.
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Queen Anne Academic Center Prince George’s Community College 301 Largo Road Largo, Maryland By: Austin Heidelbaugh.
Leads Institute of Technology & Engineering
Foundation – jay Desai.
Foundations of Technology Construction
Objectives : ANALYZE home maintenance techniques
Multistory Office Building
BUILDING CONSTRUCTION 1
Wood structures Topic 3 Floor Framing
Wood Structures Topic 8 Quality Workmanship
Building Construction I Sofia Sebastian 1
Common Components of a Traditional Wood Framed Building
Foundations of Technology Construction
Presentation transcript:

AE 221 Bio-behavioral Health Building Group members: Alec Canter Matt Gillis Mike Hardesty Jason Ellis Kevin Kelly Ben Mank Kevin Barth

Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Usage Materials Building Sections Floor Plans Doors and Windows Animation

Introduction The Biobehavioral Health Building 94,000 square feet to replace bridge Massaro CM Services Primarily Biobehavioral Helath, but includes Gerontology Center, the Center for Diverse Families and Communities, the Prevention Research Center for the Promotion of Human Development, and Information Systems and Services New Plaza adjacent to Hub Lawn Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Introduction The Biobehavioral Health Building The Foundation was poured Feb – May 2011 Steel was raised May – July 2011 Exterior completed by Feb 2012 Interior will be completed May 2012 Move-in November 2012 Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Structural Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Structural Foundation Foundation Consists of Slab on Grade Cast in Place Columns w/ Pads Support Steal Column Lowest Column at -21 below grade Cast in place Concrete Walls w/ Strip Footers The Reinforcing Steel WWF included in slab on grade Deformed Bars and Welded Reinforcing Bars – Grade 60 Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Structural Foundation The Concrete Type – 28 days compressive strength Footings – 4000 psi Slabs and Beams – 4000 psi ¾ Chamfer of Exposed Corners Slab on Grade WWF Control Joints with max. of 900 S.F. Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Columns & Beams Columns attached to footing or base pads Pads sit on 2 grout held in place by anchor bolts Beams are connected with both sheer and moment connections Decking Stud Framing All floors are supported by metal decking Walls have metal studs Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Site Location Layout Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Materials Façade Limestone Brick Glass Curtain Wall Roof Slate Roof Green Roof East North Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Building Sections East view of building Shows flights of stairs Conference rooms and department head offices Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Building Section South view of building Project offices Faculty rooms Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Lecture Hall located in Northeast corner of building Mechanical Room and High Density Storage Rooms Technicians and Managers Offices Ground Floor Plan Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Follows basic layout of ground floor plan Includes two classrooms in the middle of plan Project and Faculty offices 4 staircases Graduate Student Area 1 st Floor Plan Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

2 nd Floor Plan Receptionist and Visitor Area Faculty Offices with research space Interview rooms Lobby area Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

3 rd Floor Plan Directors Administrative Office Large Project Area rooms 3 stairwells Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

4 th Floor Plan Smaller in size Research offices Large Conference room Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

5 th Floor Plan Last floor Mechanical/Electrical room Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Rooms Types of rooms: Classroom Lecture Hall Laboratory Offices Conference Rooms Mechanical Rooms Corridors Storage Bathrooms Lecture Hall Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Materials Walls: Drywall Limestone Concrete Metal Paneling Ceiling: Acoustical ceiling tile Dry wall Floors: Carpet tile Linoleum Tile Concrete Brick Stainless steel paneling Wood paneling Metal paneling Granite Stone Tile Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Doors Styles All Glass Louvered Flush Full Glass [Solid Core] Full Glass [Rated System] Full Glass [Narrow Style] Full Glass [Historic Glass Panel] Materials Wood Aluminum Steel Glass Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Windows Types 11 different styles Materials Aluminum Windows Subsills Trim Manufacturers Custom Window Company EFCO Corporation Kawneer North America Wausau Window and Wall Systems Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Fire Resistive Joint Systems Device that provides a continuous transition in openings between fire resistive structures Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Fire Resistive Joint Systems Expansion joints/Control Joints- between floor structures Floor-to-wall joints- where a floor structure intersects a wall structure Head-of-wall joints- where a wall or partition intersects a roof or floor-ceiling assembly Control joints -within or between wall structures Types and Locations Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation 2 nd floor wall

Fire Resistive Joint Systems Size, Color, Quantity Color- True white, limestone, sandstone Size- Joints are typically in the range of ½ to 6 inches wide depending on size of wall Used in all fire-rated walls, ceilings, and floors Sandstone Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Fire Resistive Joint System Install forming materials and other accessories Install fill materials Seal all joint openings Installation Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Fire Resistive Joint System Owner shall engage a qualified independent inspection agency to inspect the system Keep areas of work accessible during inspection by authorities having jurisdiction Repair all deficiencies when found Inspection Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Materials Cast-in-place fire stop devices Latex Sealants Intumescent Composite Sheets Intumescent Putties Wrap Strips Mortars Pillows/ Bags Silicone Foams Fire Resistive Joint Systems Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Fire Resistive Joint System Manufacturer and Cost Cost(per joint): Construction joint floor slab at exterior wall Material Labor Total 2 wide joint $6.45 $2.66 $ wide joint $12.90 $4.43 $17.33 Manufacturer: Specified Technologies Inc. Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

HVAC Insulation Types and Locations Size Color Quantity Installation Cost of Material/ Labor Warranty Manufacturers Inspection Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Types and Locations Size Color Quantity Installation Cost of Material/ Labor Warranty Manufacturers Inspection 800 series spin glass (ideal for commercial buildings) Ducts located between floor and ceiling of each floor HVAC equipment located on basement and 5 th floor HVAC Insulation Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Types and Locations Size Color Quantity Installation Cost of Material/ Labor Warranty Manufacturers Inspection Size, Color, Quantity 2 thick Foil finish Covers all ducts except; Exhaust ducts Factory insulated flex ducts plenums and casings and access panels and doors Flexible connectors Vibration control devices Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Installation HVAC Insulation Types and Locations Size Color Quantity Installation Cost of Material/ Labor Warranty Manufacturers Inspection Installed after complete HVAC is tested Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Cost of Material/ Labor HVAC Insulation Types and Locations Size Color Quantity Installation Cost of Material/ Labor Warranty Manufacturers Inspection 800 series spin-glass duct insulation Material Labor Total 2 thickness 1.5 lb./cu. density$0.33/S.F. $0.71/S.F. $1.26/S.F. Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Warranty, Manufacturers, Inspection HVAC Insulation Types and Locations Size Color Quantity Installation Cost of Material/ Labor Warranty Manufacturers Inspection Johns Manville(Insulation, Roofing Systems, and Engineered Products) 1 year warranty Ductwork randomly inspected Limited to 1 location/duct system Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Linoleum Tile Linoleum can be put in pretty much any room, except bathrooms Among one of the greenest floors (linseed oil, recycled wood flour) Very durable, scratch resistant, stain resistant Linoleum Tile is located in 21 rooms of the Bio-behavioral Health Building These include Corridors, Research Offices, Storage Rooms Why appropriate Location Size Color Samples Manufacturers Quantity Cost of Material/ Labor Tools Storage Installation Warranty Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Why appropriate Location Size Color Samples Manufacturers Quantity Cost of Material/ Labor Tools Storage Installation Warranty Linoleum Tile The flooring sheets come in rolls 12 long The color of the Tiles must be constant though the whole tile the same batch of dye must be used Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Why appropriate Location Size Color Samples Manufacturers Quantity Cost of Material/ Labor Tools Storage Installation Warranty Linoleum Tile Samples of Marmoleum Tile by Forbo Industry Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Why appropriate Location Size Color Samples Manufacturers Quantity Cost of Material/ Labor Tools Storage Installation Warranty Linoleum Tile Linoleum From Armstrong, Forbo Industries or Equal This Project will require around 4000 sqft The cost of linoleum is $4.28/sqft ($17120) The cost of labor is $0.91/sqft ($3630) The labor for this project has to have had a minimum of 5 installations in the last five years Each Room should take a couple hours to finish installing, but it will take 24 hours to dry Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Why appropriate Location Size Color Samples Manufacturers Quantity Cost of Material/ Labor Tools Storage Installation Warranty Linoleum Tile Square, chalk line, pen adhesive, tape, measuring tape, notched trowel, snips, utility knife, primer and adhesives The linoleum tiles will be delivered in marked packages and stored in rooms that are not less than 70 Degrees Fahrenheit. Dry Flat Surfaces Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Why appropriate Location Size Color Samples Manufacturers Quantity Cost of Material/ Labor Tools Storage Installation Warranty Linoleum Tile The floor must be dry, level, and clean Doors must be off and molding base bored Place Moisture Barrier Measure room and cut linoleum to fit with 3 extra Place floor in and trim excess Lift half the floor and place in adhesive with notched trowel Place adhesive on other half of floor Roll floor to smooth out adhesive Stay off for 24 hours Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Why appropriate Location Size Color Samples Manufacturers Quantity Cost of Material/ Labor Tools Storage Installation Warranty Linoleum Tile The Manufacturer and the Laborer will provide a 15 year warranty to cover the material and installation Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Why appropriate Location Size Color Samples Manufacturers Quantity Cost of Material/ Labor Tools Storage Installation Warranty Linoleum Tile 226 Research/ Budget Storage Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Metal stairs are appropriate for many type of buildings Durable Can carry normal loads of 100 lbs per sq. ft. Capable of carrying concentrated loads of 300 lbs on an area of 4 sq. in. Metal Stairs Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Location: By main entrance By the south end of the building By the east end of the building Size: Tread: typical 11 in. wide, 3/16 in. thick Riser: typical 7 in. tall, 1/8 in. thick Width and length vary depending on location, use, and load capability Metal Stairs Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Stairs: 23 flights of stairs throughout the building Color: Gray, silver, and metallic Due to the use of different types of metal Ferrous Metals: Steel, Cast Iron Non Ferrous Metals: Aluminum Metal Stairs Main Stairwell Manufacturer: Lapeyre Stair Inc. Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Zinc plated fasteners Bolts and nuts Anchor bolts Machine screws Plain washers Lock washers Welding rods Accessories for Installation Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation Steel-Cutting Saw Welding Tools

1)Install stair assembly in accordance with manufacturers instructions and approved shop drawings 2)Anchor components rigidly and securely to building structure 3)Make sure its plumb and level, accurately fitted, and free from distortions or defects 4)Clean bolted connections and touch up with shop primer 5)Repair galvanizing with galvanizing repair paint Metal Stair Installation Treads and risers 1)Perform cutting, drilling and fitting required 2)Set units accurately and aligned in location established by lines and levels 3)Treads and risers attached by welding steal angles 4)Field weld and smooth the surface to blend it with all other surfaces Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Cost for materials Cost for installation Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Warranty Lapeyre Stair warrants to the original purchaser that the products are free from defects in workmanship and materials for a period of one year from date of receipt by purchaser. Lapeyre Stair will repair or replace, at its sole option, any products of faulty material or defective workmanship under normal use or service. Purchaser shall not return any defective products without Lepeyre Stairs prior to written approval. Stairwell A Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Tolerances 1.Max variation from plumb: ¼ in. for full height of stairs 2.Max variation from level: 1/8 in. 3.Max angular variation of tread from true position: 3 degrees 4.Comply with NAAMM metal stairs manual Inspection 1.Verify that field measurements are acceptable to suit stair assembly tolerances 2.Verify supports and anchors are correctly and securely positioned 3.Verify installation conditions are acceptable for product installation in accordance with manufactures instructions Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Interior Flush Wood Veneer Doors These are basic interior, smooth wood panel doors made of fire rated material ranging from 20 to 90 minute fire ratings. They are used throughout the Biobehavioral Health Building for classrooms and office doors on each floor. Project Office Room #202 Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Location: Every floor Size: Focused on the 3 x 7 2 ½ Wood Flush Door with a thickness of 1 ¾ Color: Wood finish, but can be stained a variety of ways depending on the designers requests. Quantity: 162 Price: $95.50 for material, $43.00 for labor Total Cost with O&P is $ Interior Flush Wood Veneer Doors Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Interior Flush Wood Veneer Doors Manfacturer: VT Industries, Inc. Warranty: Warrant solid core, interior doors for life of installation against warpage, delamination, and defects in materials and workmanship. Defects noted during warranty period shall be corrected at no cost to Owner. Corrective work shall include labor and material for repair, replacement, refinishing, and rehanging as required. Inspection/approval/tolerance – Approval may come from Architect if needed Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Interior Flush Wood Veneer Doors Installation Process Ensure frames are plumb, level, square, and within tolerance. Allow doors to become acclimated to building temperature and relative humidity for a minimum of 24 hours before installation. Install doors in accordance with manufacturers instructions. Install doors at locations indicated on the [Door Schedule] [Drawings]. Install doors plumb, level, and square. Install door hardware as specified in Section ( ). Adjust doors to swing freely, without binding in frame. Adjust hardware to operate properly. Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Interior Flush Wood Veneer Doors Environmental requirements for storage and installation Do not subject doors to extreme conditions or changes in temperature or relative humidity in accordance with WDMA I.S.1-A Accessories Needed Frames Door Hardware Doorknobs Hinges Screws Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation Grouting Appropriateness Helps fill the voids Effectively transfers load Helps prevent rust staining of the column Location For use under steel column base plates, steel joists, and beam bearing plates

Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation Grouting Size 1 or 2 inches in height for Non-metallic, No Slip Grout Color Grey Tools

Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation Grouting Manufacturers Master Builders Masterflow 928 L&M Chemicals Crystex Euclid Chemical Company NS Grout U.S. Mix Products Co. MP Grout Or approved equal Quantity Grouting is used wherever steel columns, steel joists, and beams meet the structural concrete

Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation Grouting Cost of Material Basis of Measurement: By cubic yard (cubic meter) Dry packs come in 50lb. Bags 64 per pallet Cost of Labor Basis of Payment: This payment includes full compensation for all labor, materials, tools, equipment and other items as necessary to complete the work as described in the contract documents Bare Costs Non-Metallic Non-Shrink GroutingMaterialLaborTotal Total with O&P 1" deep " deep

Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation Grouting Warranty The companies warrant that the materials will be of good quality. Will conform with the published specifications in force on the date of acceptance of the order. Inspection Grout is place only after inspectors have verified proportions of site-prepared grout. Storage Materials must be delivered in original, unopened containers with the manufacturers labels including product name and batch numbers Do not apply material when temperature is below 45 o F or when temperature is expected to fall below 45 o F within 48 hours Protect from freezing and store above ground in a cool, dry place

Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation Grouting Installation First you want to remove all grease, oil, dirt laitance, and unsound concrete. Then saturate the area that will receive the grout with water. You want to make sure you remove any puddles of water before placing the grout. You also want to maintain a temperature between 45 o F and 90 o F prior to application and throughout the initial 24 hours. Finally mix, install, and cure the grout according to the manufactures specifications. Completely fill the grout under the beam and column bearings, erection blockouts, connections blockouts or pockets, and elsewhere are required.

Ornamental Railings Why appropriate Location Size Color Samples Materials Manufacturers Quantity Cost of Material/ Labor Materials Installation Warranty Ornamental railings accompany nearly every stair Guards, handrails, protect occupants at open-sided floor areas Guidance and support High quality, nonferrous metals such as stainless steel, brass, and aluminum are options. Located in the stairwells Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Ornamental Railings Why appropriate Location Size Color Samples Materials Manufacturers Quantity Cost of Material/ Labor Materials Installation Warranty Size and Colors The railings come in 1.9 and 2.5 inch diameters with the glass being at least.5 inches thick Stainless steel is used throughout the building Samples of ornamental railings from Couturier Iron Craft Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Ornamental Railings Why appropriate Location Size Color Samples Materials Manufacturers Quantity Cost of Material/ Labor Installation Warranty Materials Stainless Steel Performance requirement of 60 % of minimum strength Tubing, pipe, castings, plates, and flat bars Glass Tempered Glass Clear.5 inches thick Curtain glass side Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Ornamental Railings Why appropriate Location Size Color Samples Materials Manufacturers Quantity Cost of Material/ Labor Installation Warranty Ornamental Railings from Couturier Iron Craft This Project will require over 520 feet of railing Cost according to RS Means 2011 Edition for a composite steel and 36 high, 6 Off Center is MaterialLaborTotal Min Max Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Ornamental Railings Why appropriate Location Size Color Samples Materials Manufacturers Quantity Cost of Material/ Labor Installation Warranty Fit exposed connections together to form hairline joints. Install ornamental railings plumb and level. Locate railings as indicated on Drawings and at heights that are in accordance with applicable code. Set to right height Anchor to substrates in strict accordance with tested anchorage system, free from distortion or defects detrimental to appearance or performance. Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Ornamental Railings Why appropriate Location Size Color Samples Materials Manufacturers Quantity Cost of Material/ Labor Installation Warranty The Manufacturer and the Laborer will provide a 10 year warranty to cover the material and installation of railing Laminated Glass has a warranty period of five years from date of substantial completion Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Ornamental Railings Why appropriate Location Size Color Samples Materials Manufacturers Quantity Cost of Material/ Labor Installation Warranty 2 nd Floor Stairs Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation

Presentation Overview Introduction Structural Foundation Steel Exterior Site Facade Interior Building Sections Floor Plans Rooms Materials Doors and Windows Materials Animation