ATLAS Upgrade Module Bonding Trials Using Glass Asics

Slides:



Advertisements
Similar presentations
LHCb Velo Construction Authorisation steps Tony Smith.
Advertisements

October 2006 Mark Whitley Mid term Review 1 Mark Whitley LHCb VELO Backend Bonding at The University of Liverpool.
H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
ATLAS Module building at Glasgow
Design Ash finished electric hybrid tracing to connector fields –Changes to allow for HCC-less and HCC running on one hybrid awaiting final confirmation.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Status and outlook of the Medipix3 TSV project
J. Salonen, “Flip Chip Bumping Process at VTT" [presentation for GPG], 16-March-2007 Flip Chip/Bumping Process at VTT Last modified March 16, 2007 By Jaakko.
ATLAS Tracker Upgrade Stave Collaboration Workshop Oxford 6-9 February 2012 ABC 130 Hybrid.
Lab 04: AEV External Sensors Advanced Energy Vehicle (AEV)
CMS Week, CERN, December Dec 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
S Pyatt Dummy module with copper on glass sensor An adhesive tape has been identified that is suitable for dummy module building. This tape can be stuck.
DIC Differential Interference Contrast Kim Peifley 08/14/15.
The complete flow monitoring solution Measure – Display – Switch – Transmit.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
FE-I4a Single Chip Card issues V. Tyzhnevyi HEP group, University of Manchester.
G.Sirri – INFN Bologna 1/19 Lateral X-ray marks finding with ESS  Goal: implementation of the lateral mark finding in the ESS software  First Test: Plate-to-plate.
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
Andy Blue Glasgow Update. Andy Blue WP3 Meeting Summary ESD Protection –Part all arrived and installed Compressed Air Controls –New lines and panel being.
Zian Zhu The Tension/Pitch Machine Status and Anode Panel Measurements The Strip Capacitance Meter Status and Measurements Production Readiness Review.
Fred Doherty Module Work Fred Doherty. Stave Module Building Hybrid Bonding Bonding table for the BJ820 still in workshop Modified working height of the.
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
Stave Hybrid/Module Status. Modules Stave Module Building 2 Mechanical Chip Gluings Mechanical Wirebonding Electrical Chip Gluings Electrical Wirebondings.
Monday, Feb. 23 rd p. 182, 183. Monday, Feb. 23 rd 182 2/23/15 Mon. L.T.: I can collaboratively plan and find the avg. speed of the RC car traveling dif.
Report from Florence Bonding of Modules L12p Mirko Brianzi 20 April 2004.
Haul Frames and Corners to the Jobsite Evaluate the Condition of the Jobsite HAZARDS TO WATCH FOR : Overhead Electrical / Power Lines, Weather Conditions,
Strasbourg status Ring 7 pilot run François Didierjean.
Gluing, measuring and shearing Heated plate curing Is the process feasible? Tests with 130nm hybrids Measure resulting glue thickness Determine the shear.
ABC130 Hybrid/module and HCC Bond Detail ABC130 Left & Right Handed Hybrid and Module Topology Original proposal – same flavour hybrids Hybrid-module.
D. Henry / CEA-Leti-Minatec Contibuting authors : A. Berthelot (LETI) / R. Cuchet (LETI) / J. Alozy (CERN) / M. Campbell (CERN) AIDA Meeting / 08 & 09th.
Simon Eckert, University of Freiburg 8th RD50 Workshop in Prague June 25th – 28th 2006 Rebondable Fan Ins S. Eckert¹, T.Ehrich¹, A.Fauler², K.Jakobs¹,
ASIC Building Blocks for Tracker Upgrade A. Marchioro / CERN-PH-ESE October, 2009.
Pull testing procedure. F ff ѲѲ 2f sin Ѳ = F If sin Ѳ = 30° then f = F If the angle of the 1 st and 2 nd bonds is 30° then the force we measure equals.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
Module Assembly Jig Status Cambridge and DESY came to Liverpool Nov. 15 th -16 th for training on module assembly – A complete jig set was sent back with.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
Andy Blue WP3 - Glasgow Update Andy Blue. WP3 Meeting Update Module Building –2 nd Module (FZ1) wire bonded last week –Tested on Mon –Re-works yesterday/today.
The medipix3 TSV project
Epument Girder simulation and Module Showroom upgrade For CLIC meeting 2015 Petri Tikka, Helsinki Institute of Physics focusing on exploring the possibilities.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
Electrical Tests of Modules and Ladders Markus Friedl (HEPHY Vienna) 2 October 2014.
Thoughts about PS module assembly Ulrich Heintz, Meenakshi Narain, Bill Patterson, Eric Spencer, Juan Trenado Brown University, Providence 4/16/2015Heintz,
Infrastructure & issues and solutions for ATLAS Upgrade Hybrid/Module strip bonding Fred Doherty, Joe Ashby, Fiona McEwan & Calum Gray ATLAS Upgrade Module.
BM&N STS ladders assembly in VLHEP
ATLAS pixel module assembly flow
Check the focal distance of the lens
T. Bowcock University of Liverpool
Bonding study of wrapping part of PA1/2
→ need to guide UV light into gap; also beware temp effects
Glue curing studies (contd)
Ladder Assembly All tools and jigs produced Glue dispensing works
Sector 002 Assembly status report
July 2, 2007 ID CERN S. Terada KEK Module and Service Structure Designs -Super module conceptual design- - FEA thermal analyses- -Test of angled.
Electron-beam lithography with the Raith EBPG
Thermosonic Bonding Ball bonding process A2 Group Members :
Ladder Assembly All tools and jigs produced Glue dispensing works
Status Caltech meeting – discussions of assembly centers, US responsibilities We will try to organize a PS module assembly workshop at Brown April 30 –
Module 9 Taking Textbook Notes Hholdorf.wordpress.com.
Micro-cooling devices for LHCb Velo CERN
SILVACO simulations & clean room measurements
TK Upgrade report.
Equipment for Assembly – UK Experiences
HIC Assembly - Liverpool
Success is when preparation meets opportunity
Work packages status in Torino and perspectives
Design and fabrication of Endcap prototype sensors (petalet)
CL4NX +Dispenser (KITTING MANUAL)
Electron-beam lithography with the Raith EBPG
Presentation transcript:

ATLAS Upgrade Module Bonding Trials Using Glass Asics Fred Doherty, Joe Ashby, Fiona McEwan & Calum Gray Infrastructure & issues and solutions for ATLAS Upgrade Hybrid/Module strip bonding ATLAS Upgrade Module Bonding Trials Using Glass Asics 1 1

130 nm ATLAS Upgrade Module BJ820 Bonding Setup 19th January 2016 GU Meeting 2 2 2

130 nm ATLAS Upgrade Module ATLAS Upgrade Module with Glass Readout Asics 19th January 2016 GU Meeting 3 3 3

130 nm ATLAS Upgrade Module Glass Readout Asics with 4 rows of metal bond pads 19th January 2016 GU Meeting 4 4 4

1st 130nm glass asic module bonding The Front End Bonding (FEB) software program was loaded and the XY positional re-referencing, pattern recognition and Z height adjustment for all 10 glass asics on the hybrid and silicon strip sensor were performed. All bond pads checked for correct alignment, metallisation, dirt, debris (bond position moved if possible from problem areas). All 10 asics checked with (64) 256 bond wires requiring (128) 512 bonds per asic (Source - asic & Destination – sensor) and giving a total of (640) 2560 bond wires requiring (128) 5120 bonds in total for LH hybrid. All glass asic bond pad welding parameters had to be modified from the original program settings. The existing parameters would not take to the glass asic pads in trials - deformation error (too small) - so changed (increased weld parameter settings). Prepare wire for immediate bonding using trial bonds if problem stop during 1280 bonds have to understand and fix error, sort and prepare wire to continue bonding. All 10 glass asics bonded well with new parameters and after successful completion of the LH hybrid to sensor bonds the module sensor was rotated to continue RH hybrid to sensor bonds. Checks on all bonding info including BJ820 individual wire bond graphs & detailed visual inspections confirmed successful completion. This procedure is only 1/8 of the FE Bonding for 1 module. 19th January 2016 GU Meeting 5 5 5

1st 130nm glass asic module bonding Wire bond positions on ‘destination pads’ of silicon strip sensor 19th January 2016 GU Meeting 6 6 6

1st 130nm glass asic module bonding The many parameters for wire bonds (source / destination) at any (Asic / sensor) referenced position 19th January 2016 GU Meeting 7 7 7

1st 130nm glass asic module bonding There are 3 options for a bonding program procedure: Load 1st bond wire layer program then bond both sensor hybrids (markings on sensor when rotating with suction tool 4 times for 4 wire layers). Fully bond the one sensor hybrid loading 4 layer programs and then 1 rotation and load 4 programs to complete other side. Create 4 program for 4 bond layer to complete both sides. Hybrid/Sensor Positional accuracy and repeatability may cause problems and added time setting up. Referencing and Pattern Recognition also for 20 rather than 10 in current smaller logical program. Ideally we do not want to be rotating / moving the sensor at any stage in the bonding process so the 4 programs covering each layer for both sides will I’m sure be implemented. 19th January 2016 GU Meeting 8 8 8

1st 130nm glass asic module bonding First LH Hybrid wire layer 1 fully bonded 19th January 2016 GU Meeting 9 9 9

1st 130nm glass asic module bonding 19th January 2016 GU Meeting 10 10 10

1st 130nm glass asic module bonding 19th January 2016 GU Meeting 11 11 11

1st 130nm glass asic module bonding 19th January 2016 GU Meeting 12 12 12

1st 130nm glass asic module bonding This is a recorded video of the actual wire bonding after preparatory stage. 19th January 2016 GU Meeting 13 13 13

1st 130nm glass asic module bonding Preliminary conclusions Good learning curve and experience gained for 130nm Module bond phase. A few issues identified but no show stoppers. CNM glass asics and silicon sensor bond very well at set welding parameters. Timing of all procedures cannot be tied down. Program expansion to 2 hybrids likely. Loop heights for wire layers look ok but electrical module required to confirm. Bond pull test not required till proper asics available for trials. Will look for a camera / microscope lense screw adaptor for videoing setup. Will feedback to UK bonders group on experience so far. 19th January 2016 GU Meeting 14 14 14