Central DQM Shift Tutorial Online/Offline

Slides:



Advertisements
Similar presentations
Data Quality Monitoring of the CMS Tracker
Advertisements

System for Administration, Training, and Educational Resources for NASA SATERN Overview for Learners May 2006.
Central DQM Shift Tutorial Online/Offline. Overview of the CMS DAQ and useful terminology 2 Detector signals are collected through individual data acquisition.
Central DQM Shift Tutorial Online/Offline. Overview of the CMS DAQ and useful terminology 2 Detector signals are collected through individual data acquisition.
Central DQM Shift Tutorial Online/Offline. Overview of the CMS DAQ and useful terminology 2 Detector signals are collected through individual data acquisition.
5. Data Manager 1. Introduction 2. Data Manager Duties 3. Quality Checking 4. Problem Reporting 5. Data Monitoring 6. Histogram Presenter 7. Trend Presenter.
Offline Tracker DQM Shift Tutorial. 29/19/20152 Tracker Shifts Overview Online Shifts at P5 (3/day for 24 hours coverage) – One Pixel shifter and one.
Lead Management Tool Partner User Guide March 15, 2013
Welcome to the Manage Scoping module of the “MIP Release 3 Study Workflow Training” course! This module guides you through the process of managing the.
Offline shifter training tutorial L. Betev February 19, 2009.
OFFLINE TRIGGER MONITORING TDAQ Training 5 th November 2010 Ricardo Gonçalo On behalf of the Trigger Offline Monitoring Experts team.
A.Golunov, “Remote operational center for CMS in JINR ”, XXIII International Symposium on Nuclear Electronics and Computing, BULGARIA, VARNA, September,
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
Online Consumers produce histograms (from a limited sample of events) which provide information about the status of the different sub-detectors. The DQM.
ECAL Shift Duty: A Beginners Guide By Pourus Mehta.
Training Guide for Residents
Make-Up Testing/Undo Student Test Submissions
Central DQM Shift Tutorial Online/Offline
Web for Faculty Faculty and Advisor Banner Self-Service
Compatible with the latest browsers; Chrome, Safari, Firefox, Opera and Internet Explorer 9 and above.
Core LIMS Training: Project Management
Journal of Mountain Science (JMS)
Project Management: Messages
Central Online DQM Shift Tutorial March 2017, CMS DQM group
Room and Resource Reservations
Student SOLE Page – Living Page
Standard Operating Procedure
Not Tested and Void Test Score Codes
e-TES Employee Training Guide
Shift instructions August 16, 2017 Antoni Aduszkiewicz
Lawson System Foundation 9.0
USAJOBS – Application Manager
Offline shifter training tutorial
Basic User Site Access Training & Producing Reports
Incident Management: Recording New Incidents User Guide
Experience between AMORE/Offline and sub-systems
Offline shifter training tutorial
Data Quality Monitoring of the CMS Silicon Strip Tracker Detector
Test Administration & The TA Sites.
User Guide Portman Concur
Applying for a contractor’s license online
Critical Warnings and Alerts
Students Welcome to “Students” training module..
AoFA Training Manager Guideline
Briefing Session Guide
Active Orders Supplier Administrator Training Getting Started Activities This training presentation describes the Getting Started activities that will.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Audit Documentation and Administration
Investing in good health at work
Unit4 Customer Portal Submitting & Managing Cases.
Unit4 Partner Portal for Case Creator
Orders & Shipment Tracking
Online Tools Guide to Security Products International Website.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
AmeriCorps Member Tutorial – OnCorps Reports 2.0, Standard Reports
How to Create and Start a Test Session
Adding and Editing Users
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
E-permits Tutorial for first-time users
CMS Pixel Data Quality Monitoring
My Learning Plan End User training
Applying for a contractor’s license online
Lippincott’s Nursing Procedures and Skills
Request Form You gain access to the Request Form from your intranet set-up by your IT dept. Or the internet via either our desktop launcher icon. Or a.
Inside a PMI Online Course
Lesson Nine: Epic Appointment Scheduling Referrals Reports
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
CSC Shift Training and Operation + B904 Status
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Presentation transcript:

Central DQM Shift Tutorial Online/Offline

 SPOT PROBLEMS QUICKLY FOR OPTIMAL OPERATION EFFICIENCY Scope of Online DQM Shifts: Identify problems with detector performance or data integrity during the run  SPOT PROBLEMS QUICKLY FOR OPTIMAL OPERATION EFFICIENCY

Offline Data Processing and Offline DQM Prompt Reconstruction at T0 and CAF is performed from within one hour up to 48 hours after data is transferred from P5 to T0 and CAF (CERN) Online environment T0, CAF Subsequent iterations of re-reconstruction at the T1’s follow periodically the Prompt Reco with improved Alignment and Calibration constants, bug fixes. T1 Offline DQM is part of the Offline data processing that, in addition to detector data analyses, includes higher level reconstruction objects, aka Physics Objects (POG’s) Scope of Offline DQM Shifts: Produce the data certification for various reconstruction iterations  USED FOR CMS OFFICIAL GOOD RUN LISTS!!!

Central CMS Shifts https://twiki.cern.ch/twiki/bin/view/CMS/CentralShiftAllocation Shifts and on-call for P5: 2 Run Field Managers Shiftleader DAQ shifter and one on-call Trigger Shifter and one on-call HLT (on-call) DCS (or technical shifter) and one on-call Online DQM shift (and one on-call expert) BRM on-call Offline Run Manager (ORM) Offline DQM (at CERN, FNAL, or DESY): Offline DQM Shift Computing: Offline shifter and one on-call DQM Shifts: Work in close contact with shift leader (P5) and offline run manager (Offline)

In preparation of DQM shifts Safety requirements for P5: Online CMS level 4C safety class must be passed Each shifter should have appropriate access rights, through EDH: Request access to « CMS CR » for P5 Request access to « CMS CEN » for CMS Center at Meyrin Mandatory for newcomers: Schedule your first shift in the daytime so assistance will be readily available if needed Attend the shift tutorial on Monday (possibly the latest one before your shift or the one before that) Attend a trainee shift between the tutorial and your first shift

In preparation of DQM shifts Read the DQM shift instructions before you go on shift, even if you have been on shift before: https://twiki.cern.ch/twiki/bin/view/CMS/DQMShiftInstructions Online: https://twiki.cern.ch/twiki/bin/view/CMS/OnlineDQMShifts https://twiki.cern.ch/twiki/bin/view/CMS/DQMOnlineShortTermInstr Offline: https://twiki.cern.ch/twiki/bin/view/CMS/OfflineDQMShifts https://twiki.cern.ch/twiki/bin/view/CMS/DQMOfflineShortTermInstr Check the DQM shift instructions while you are on shift Complain about ambiguities and inconsistencies (ELOG: Problem Report)

DQM Shift - Schedules Online Shifts at P5 (3/day for 24 hours coverage) 23:00-7:00 | 7:00-15:00 | 15:00-23:00 Offline Shifts run at Remote Control Rooms (4/day) 1:00 – 7:00 at Fermilab 7:00 – 13:00 at CERN-CMS Centre (Meyrin site) 13:00 – 19:00 at DESY 19:00 – 1:00 at Fermilab Regular shuttle service runs 7 days per week. https://twiki.cern.ch/twiki/bin/view/CMS/P5Shuttle For latest run plan updates (e.g. shift cancellations) subscribe to hn-cms-commissioning@cern.ch

DQM Shift Tools DQM GUI: Graphical User Interface, for histogram viewing Receives histograms from Live DQM applications (online), Files uploaded from T0 (offline express / prompt), T1 (ReReco) DQM Run Registry: Web interface to the Database that holds run information Register significant runs (Online shifts) and Bookkeeping of quality information Elog: for end of shifts and problem reports TWiki pages: for shift instructions

DQM Shift Tasks Task 0: Make sure all DQM applications and webservers function properly Task 1: Inspect shift histograms using DQM GUI, following shift instructions Raise alerts / contact experts in case of problems Task 2: Run-by-run bookkeeping using Run Registry Task 3: Shift summary and problem reports in ELOG

Task 0: Applications DQM expert-on-call: 165579 Make sure DQM applications and GUI are running during data taking: Online: check update of histograms during runs Offline: check arrival of histograms from Tier-0/CAF processing Check correct updating of Run Registry In case of problems (persisting longer than 15 mins), call: DQM expert-on-call: 165579

Task 1: Histogram Inspection Follow online/offline shift instructions Run-by-run procedure: (1) Enter significant runs in the Run Registry Online Shifter: decide if a run is significant (confirm with shift leader!), register in RR Offline Shifter: analyze runs previously registered by the Online shifter (2) Shift histogram Inspection Look at the Summary, the Reports, and the Shift Workspace. Make an effort to look at all the plots one by one. If you spot a problem or have a question regarding a specific plot, please contact: Shift leader / offline run coordinator Make Elog entry (Type: "Problem Report") (3) Stay in close contact with the shift leader / offline run coordinator

GUI – Summary Workspace https://cmsweb.cern.ch/dqm/online 12

GUI – Summary Workspace https://cmsweb.cern.ch/dqm/online 13

GUI – Reports Workspace https://cmsweb.cern.ch/dqm/online

GUI – Shift Workspace

DQM Shift Instructions

Task 2: Run Registry Hover over the quality flag to see the comment

Run Registry There are three table views in the RunRegistry browsable via the buttons at the top of the page: 1) RunInfo 2) Runs 3) LumiSec 18

Run Registry (online): RunInfo View At the beginning of each run: Check if the run is significant, if yes create it (from the RunInfo Table View) Click run number itself->Create Global In the RunInfo Table View all runs are listed Register only runs that are significant, i.e. that are collisions runs or have more than ~10,000 events and/or have been running for more than 20 minutes. If in doubt, ask the shift leader. Proceed to Runs Table View and follow the shift instructions to inspect shift histograms

Run Registry (online): RunInfo View In the RunInfo Table View all runs should be listed, however, sometimes new runs may not appear in the run info table. In such a case, Click on “table”  “filter”  enter the run number in the run number column. The run might be visible. Then, if Events > 0, the run can be made “Global” and certified as usual. But if events = rate = 0, then that means that the info is wrong. In such a case, record all the relevant info about the run in an ELOG entry. Run information might appear ~20 minutes to 1 hr after the run has started, then the info can be included in the run registry as usual and there won’t be a need to fill a specific ELOG entry for that run.

Run Registry (online): Edit Runs During the run: Based on the shift histogram instructions, set the online subsystem flags (GOOD/BAD) and enter comments Click run number itself->View details->Edit If a subsystem is BAD, inform the shift leader and the subsystem expert, and enter comment After the run: Enter the ‘stop reason’ (in the stop reason field, NOT under comments) Confirm your results with the shift leader moving the run STATUS to « SIGNOFF » Click dataset name ->Move to SIGNOFF ->Edit Note: once the run is in SIGNOFF state, it cannot be modified by the Online shifter

Run Registry (online): Run "Group" Note that Runs are classified though the Group name in the RunRegistry: Assigning correct Group name is of vital importance as it will affect Offline determination of Runs to be used for different analyses 1. Select "Collisions10" if the run is taken for physics analysis purposes and contains at least one lumi section with two stable beams (colliding or non-colliding). 2. Select "PostCollisions10" for runs right after Collisions10 runs, when the tracker is off. 3. Select "Cosmics10" if the run is taken for analysis purposes and there is no beam activity throughout the run, i.e. stable "no beam" conditions. 4. Select "Commissioning10" for all other runs, i.e. those taken for tests or specific detector studies only, i.e. not meant for general offline physics analysis.  Ask the shift leader if in doubt ! Check latest set of rules at start of your shift in the Online DQM Shift Instructions !

Run Registry (online): Run "Group" Shifter needs to make sure that the group name is correctly assigned. Sometimes the shifter is asked to mark a run as Cosmics10 but the choice may not be available. Selection of Cosmics10 group name is only possible with a cosmics HLT key. So, if the choice is not available this might mean that Trigger shifter chose an incorrect key  trigger shifter should be made aware A.S.A.P. It is a CASTOR run and not marked as Cosmics10 run  Double-check with shift leader. This was on purpose: cosmics run with CASTOR key.  Inform DQM experts through ELOG so that they can change the group name to Cosmics. Text

Run Registry (offline): Runs View Offline DQM Shifter: Select which runs to analyze: oldest run where the “Global/Online/ALL” dataset is in SIGNOFF status Add the Offline dataset to analyze (as per instructions) and proceed with subsystem evaluation based on shift histograms in the GUI Move the dataset entry to SIGNOFF when all subsystems are analyzed

Run Registry (offline): Datasets P5 Meyrin 25

Run Registry: HV conditions DQM GUI Check that the HV information on the DQM GUI summary ( "Info" histogram) and the Run Registry ("LumiSec" table) are consistent Sometimes "LS" in the Runs view table shows 0 If this happens: Make an ELOG entry "Problem report" indicating the run number Ensure that the DQM expert on-call is aware of the problem (165579) Put the information manually into the general comments section of the Run Registry in the following format: Example: LS 0 = CASTOR, Strips, Pixel, and DT with HV OFF. All others with HV ON. RR LumiSec

ELOG - http://cmsonline.cern.ch/portal/page/portal/CMS%20online%20system/Elog Log in with your AFS account Click on "Elog" and choose Subsystems  "Event Display and DQM" Problem Report ( 1 entry per problem ) For each problem arising during your shift make a "Problem Report" entry Please use “Elog” to report problems (including problems understanding shift instructions)! Shift Summary ( 1 entry per shift ) At the end of each shift, write a short "Shift Summary" N.B. (!!!): Use Types "Problem Report" or "Shift Summary" only, do NOT create new types Do not enter run-by-run information in the Elog that should be in the Run Registry Make sure all run-by-run information is in the Run Registry, not in the Elog

Shift Hand-over Make sure to arrive 5-10 minutes early for shift hand-over Upon your arrival in the control room, the previous shifter will be there Get from her/him the information about the current status of the data taking and what happened during the previous shift The shift person will show you where the tools are running, which you will be using (DQM GUI, CMS Online page, Run Registry) If anything with your tasks is not clear to you, ask at that time At the end of your shift, wait for the next shift person to arrive and provide the same support

Links Shift instructions: https://twiki.cern.ch/twiki/bin/view/CMS/DQMShiftInstructions https://twiki.cern.ch/twiki/bin/view/CMS/OnlineDQMShifts https://twiki.cern.ch/twiki/bin/view/CMS/DQMOnlineShortTermInstr https://twiki.cern.ch/twiki/bin/view/CMS/OfflineDQMShifts https://twiki.cern.ch/twiki/bin/view/CMS/DQMOfflineShortTermInstr DQM GUI: https://cmsweb.cern.ch/dqm/online/ https://cmsweb.cern.ch/dqm/offline follow certificate instructions at https://twiki.cern.ch/twiki/bin/view/CMS/DQMGUIGridCertificate Run Registry page (need tunnel from outside CERN): http://pccmsdqm04.cern.ch/runregistry Elog: http://cmsonline.cern.ch/portal/page/portal/CMS%20online%20system

Thanks for doing shifts and - Summary Before the first regular shift: Pass/renew safety test Request/check access rights Organize transport to P5 (car or shuttle) Carefully read shift Instructions Do one training Shift Thanks for doing shifts and - Enjoy!