Long Island Rail Road Capital Program New York Building Congress Transportation & Infrastructure November 13, 2014.

Slides:



Advertisements
Similar presentations
Replacement of the Queens Approach Bronx-Whitestone Bridge
Advertisements

February 12, 2010 Government Center Station Reconstruction Project Green Line / Blue Line Public Meeting December, 2012.
Maryland Transportation Builders and Materials Association November 20, 2013.
Fill in Agency Name on Master
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Tuesday, February 8, 2011 GOAA CONSTRUCTION Upcoming Projects Mike Patterson, P.E. GOAA CONSTRUCTION Upcoming Projects Mike Patterson, P.E.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
Rescue Muni’s 3-Phased Plan For Geary Corridor Rapid Transit Presented by Dan Krause, Andrew Sullivan & David Vasquez.
HUDSON-BERGEN LIGHT RAIL TRANSIT SYSTEM HUDSON-BERGEN LIGHT RAIL TRANSIT SYSTEM Facts and Highlights Facts and Highlights.
APRIL 2014 CPOC LIRR SANDY RESTORATION PROJECTS. Active LIRR Sandy Projects PROJECT EAC Traction Power Substations64.1M Long Beach Branch Systems 56.4M.
Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.
INTERCITY PASSENGER RAIL NORTHEAST UPDATE AASHTO – FEBRUARY 29,
Storm Hardening Initiatives Robert Schimmenti VP Engineering and Planning Consolidated Edison Company of New York, Inc. June 12, 2013.
SCHEMATIC DESIGN PRESENTATION
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
New York Building Congress November 13, 2014 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM.
UPCOMING MTA CAPITAL CONSTRUCTION SOLICITATIONS
Long Island Rail Road Capital Program New York Building Congress Transportation & Infrastructure November 13, 2014.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
State of 2009 State of Good Repair Roundtable New York City Transit July 2009.
Maryland Transportation Authority (MDTA)
WORKING IN THE DARK: Citizens Budget Commission October 20, 2009 IMPLEMENTATION OF THE METROPOLITAN TRANSPORTATION AUTHORITY’S CAPITAL PLAN.
Nick Johnson, PE Senior Project Manager October 1, 2012.
Transportation Center Rolling Forward Into Phase 2 October, 2008.
1 THE FREIGHT RAIL INFRASTRUCTURE CHALLENGE 2009 AASHTO SCORT Conference – Oklahoma City, OK September 20 – 23, 2009.
Organization Date Alaskan Way Viaduct & Seawall Replacement Program 4 th Quarter 2009 Progress Report Meeting December 9, 2009.
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
Green Line Extension Environmental Impact Report Public Scoping Session Somerville High School October 19, 2006.
Progress Photos March Construction Progress Park Station Portal Shaft Excavation 16 March 2007 View towards South 16 March 2007 General views of.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
US 36 Commuting Solutions Northwest Rail Westminster Segment/Eagle P3 Oct. 14, 2014.
PROJECT OVERVIEW. 2 Green Line Extension Project 3 College Ave Ball Sq Lowell St Gilman Sq Lechmere Union Sq Washington St.
New York MTA Opportunities for
CTA CAPITAL IMPROVEMENT PROGRAM. FY FY 2019 CIP Preliminary Marks.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347 (DB Phase 3) Terry Rd. to Gibbs Pond Rd. Design-Build Project PIN , Contract No. D
1 Department of Public Works 08/09 Capital Improvement Program City of Newport Beach.
2014 Annual Program Evaluation (APE) Status Update April 1, 2014.
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
2017 Public Works Budget September 6, 2016 Donald J. Theisen, P.E. Director.
PUD Mike Awe for Sanctuary Mission. SUBJECT PROPERTY S S S S S S S M M M M C C C C C C C.
2015 Annual Program Evaluation (APE) Status Update July 14, 2015.
Reconstruction of Beach Drive Reconstruction of Beach Drive National Park Service U.S. Department of the Interior Rock Creek Park National Park Service.
White Pigeon Community Schools
High Bridge Re-Deck Project
Potomac Yard Metrorail Station
The Central Avenue Connector Trail
“NYC Build” Presentation
District 3 Complete Streets Projects
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
Adoption of the FY Capital Improvement Program Budget & Amendments to FY 17 CIP May 8, 2017.
Condominiums Association
New York Building Congress
Board of Commissioners Meeting
Florida Transportation Commission FY 2009
Safety Tip FQ18086 RHODE ISLAND AVENUE METRO STATION TRACK DECK AND PRE-CAST PANEL REHABILITATION Please use full fall Protection gear when using 6’ or.
Construction Management & Inspection
Maricopa County Transportation Improvement Program
SE 12th Street Roadway Improvements February 8, 2005.
Adoption of the FY Capital Improvement Program Budget
Contract 60X10 Informational Meeting Weber I-55
M14A/D Select Bus Service
Walker Street Reconstruction Project 25% Design Public Hearing
2014 Annual Program Evaluation (APE) Status Update
Master Facilities Committee Evaluation and Identification
Existing Fire District Buildings
Presentation to City of Palo Alto Rail Committee on Quiet Zones
Monterey County Project Report for Measure X Expenditures
Los Angeles County Metropolitan Transportation Authority
National Organization of Minority Engineers Leadership Summit
Life Cycle Costing.
Presentation transcript:

Long Island Rail Road Capital Program New York Building Congress Transportation & Infrastructure November 13, 2014

Current 2010-2014 Capital Program $2.319 Billion Asset Category 5 Year Total Rolling Stock $391.9 Passenger Stations $116.0 Track $845.7 Line Structures $143.9 Communications & Signals $393.7 Shops & Yards $118.1 Power $129.6 Miscellaneous $180.4 Total $2,319.6 MTA Long Island Rail Road

MTA Long Island Rail Road Status to Date 2010-2014 Capital Program $2.31 Billion Approx. 30 % Still Uncommitted MTA Long Island Rail Road

2009-2014 Capital Major Projects Parking Facility Development Mets /Willets Point Station Renovation Hicksville North Siding Mid-Suffolk Storage Yard Hicksville Station Reconstruction Colonial Rd Bridge Ellison Avenue Bridge Port Wash Track Extension Elevator Replacement Woodside Main Line Double Track Phase 1 Massapequa Station Improvements Wantagh Station Improvements Nostrand Ave. Station Design Key Active Projects Upcoming Projects Atlantic Tunnel Half Tie Replacement Johnson Ave. Yard Reconfiguration Elevator Replacement Merrick Jamaica Station Platform “F” Escalator Replacements Babylon Branch

ANTICIPATED SOLICITATION Station Renovations ANTICIPATED SOLICITATION Full Design Const. METS / WILLETS POINT STATION RENOVATION Extend the north platform and canopy structure to accommodate 12 car trains. Improvements will include a new ADA compliant elevator, tactile warning strips, lighting and communications, and new station signage In-Progress 2Q 2015 WANTAGH STATION RENOVATION Replacement of the station platform at Wantagh, which dates back to 1968. Replacement of existing escalator, platform waiting rooms, signage, platform canopies, and other station elements. Construction of a new elevator. MTA Long Island Rail Road

Jamaica Capacity Improvements-Platform F ANTICIPATED SOLICITATION Full Design Const. JAMAICA STATION PLATFORM "F“ Construction of a new 8-car platform in Jamaica Station – Platform F. Mezzanine and overpass bridge connector to existing station platforms . Elevator, escalator, waiting room, and typical platform electrical, mechanical and communication systems. In-progress 1Q 2015 MTA Long Island Rail Road

Improvements At Hicksville ANTICIPATED SOLICITATION Full Design Const. HICKSVILLE STATION RENOVATION Hicksville Station is supported on a viaduct structure and consists of two 14-car elevated center platforms, with a ticket office at street level. Removal and replacement of the elevated platforms, replacement of the concrete stairways, replace two hydraulic passenger elevators and escalators, replace the platform waiting rooms and canopies, signage and canopy drainage. In-Progress 1Q 2015 HICKSVILLE NORTH SIDING The new north track siding shall be constructed west of the Hicksville Station between station track #1 and the existing north track siding. Approximately 3,300 feet of new track will be installed including associated signals, switches and third rail power to connect the existing north track siding in Hicksville with station track #1.T Major work elements will include new electrified track, new retaining walls, 3 track turnouts, utility relocations, and improved drainage. MTA Long Island Rail Road

ANTICIPATED SOLICITATION Yard Improvements ANTICIPATED SOLICITATION Preliminary Design Design/Build Const. NEW MID SUFFOLK YARD Provisions for a new lead track and up to 11 tracks for the storage and servicing of 12-car MU trains. New AC and DC Power Substations to support Yard operations. Employee Facilities to accommodate Transportation, Maintenance of Equipment and Supervisory Personnel. New service roadways, walkways, lighting, storage, drainage and utilities. In Progress 3Q 2015 PORT WASHINGTON YARD Add and extend tracks in the existing yard for increased train capacity. 2015 3Q 2017 MTA Long Island Rail Road

Sandy Restoration Projects Initiative Description Anticipated Solicitation Design Const 1 Traction Power Substations Long Beach Substation: Review of Preliminary Design is underway, commence Design/Build contract package, utility relocation and site preparation. Preliminary Design In-Progress D/B 1Q 2015 2 Restoration of the Long Beach Branch Systems Replace existing Signal System, raise new huts, cases and equipment above the flood zone. New Supervisory Train Control System at Lead and Valley Towers Full Design 3 Wreck Lead Bridge Systems Restoration Replace damaged bridge electrical, signal, and communications systems. Progress preliminary design for Submarine Cable 2Q 2015 4 Long Island City Yard Restoration Raise tracks in southwest yard area, replace third rail system to tracks 9-12, new drainage system, replace underground systems and provide flood walls in low lying areas 3Q 2015

MTA Long Island Rail Road 2015-2019 Capital Program Asset Category 5 Year Total Approx. Percentage Rolling Stock 15% Passenger Stations 12% Track 32% Line Structures 6% Communications & Signals 14% Shops & Yards Power 10% Miscellaneous 5% MTA Long Island Rail Road

2015 – 2019 Capital Program (Some Proposed Projects) STATIONS Babylon Platforms Replacement, Nostrand Ave Station Rehabilitation, etc. TRACK Annual Track Programs, Jamaica Capacity Improvements-Phase 2, Double Track – Phase 2 LINE STRUCTURES Bridge Rehabilitation and Replacement Program, Bridge Painting/Waterproofing COMMUNICATIONS & SIGNALS Security Improvements, Station CCTV Cameras, Radio System Improvements, Babylon to Patchogue Signalization, Positive and Centralized Train Control SHOPS & YARDS Morris Park Loco Shop, Rehab Employee Facilities, Fire Protection Improvements POWER Replacement of Substations; Power Component Replacements, Atlantic Tunnel Lighting MTA Long Island Rail Road

DESIGN-BUILD PROJECTS 2015-2019 (Proposed) Description Anticipated Solicitation Preliminary Design Design Build Const MAIN LINE DOUBLE TRACK Phase 2 Farmingdale to Central Islip The entire Main Line Double Track project will consist of constructing 13 miles of second track between Farmingdale and Ronkonkoma. The Design-Build portion will be the initial civil-structural work. Construction of a second track between Farmingdale and Central Islip includes: a new station at Pinelawn, new south platform at Wyandanch, retaining walls, earthwork, underground utilities, fencing and track bed preparation. Preliminary Design In-Progress 4Q 2015 MORRIS PARK LOCO SHOP New Shop Facility in Morris Park Complete design (currently 60%) and construct new shop fit-out with employee facility and enclosed shop storage. Lay-up and repair positions for 4-Locomotives, one inspection pit, two overhead cranes, drop table and storage area. 60% Design Complete 3Q 2016 JAMAICA INTERLOCKING Jamaica Capacity Improvements – Phase 2 Design and Construction of the modifications for the E-Yard extension. Early Civil and Structural work 1Q 2016

DESIGN-BUILD PROJECTS 2015-2019 (Proposed) Bridge Rehabilitation ANTICIPATED SOLICITATION Preliminary Design Design Build Const SPRINGFIELD BLVD BRIDGE Rehabilitation of the Springfield Blvd Bridge on the Mainline in Queens Village, to bring the bridge to a state of good repair. Elements of construction will include repairs to the girders, diaphragms and stiffeners, Also included on repairs to the deck and underdeck. In-Progress 1Q 2016 UNION TURNPIKE BRIDGE Replacement of bearings on the Union Turnpike Bridge on the Montauk Branch, Queens County. Except for the bearings the bridge was upgraded to a state of good repair in 2009. This work will complete the effort. Elements of construction will include replacement of bearings, repair to backwalls to mitigate water infiltration, and repair damaged web girder stiffeners. Also included are deck waterproofing, drainage improvements as well as local overpainting. MTA Long Island Rail Road

DESIGN-BUILD PROJECTS 2015-2019 (Proposed) ANTICIPATED SOLICITATION Bridge Replacements ANTICIPATED SOLICITATION Preliminary Design Design Build Const POST AVENUE BRIDGE Construction of a new Post Avenue Bridge, located in Westbury, Nassau County. Elements of construction will include the replacement of the two bay structure with a three bay structure, installation of new catwalks with railings. In addition the abutments, wingwalls, and other structures necessary to support the new three bay bridge will be rehabilitated. In-Progress 1Q 2016 BUCKRAM ROAD BRIDGE Construction of a new Buckram Road Bridge, located in Locust Valley, Nassau County on the Oyster Bay Branch. Elements of construction will include the replacement of the three span structure. Also being investigated and designed is a new roadway alignment which will address substandard features including: hazardous vehicle line of sight angles, vertical under clearance, lane width and pedestrian accessibility as well as track alignment on the new bridge structure. MTA Long Island Rail Road

DESIGN-BID-BUILD PROJECTS 2015-2019 (Proposed) Description Anticipated Solicitation Design Const JAY INTERLOCKING MODIFICATIONS Jamaica Capacity Improvements Phase 2 The Jay Interlocking including track work, switches, signals, infra structure modifications in order to increase parallel moves and train capacity through Jamaica Station. In-Progress 1Q 2017 MURRAY HILL STATION ELEVATORS Murray Hill Station - Elevators Furnish and install two elevators at the station to address ADA compliance as per recent FTA mandate. Modify existing retaining walls to receive elevator at platform level, provide machine rooms, electrical, mechanical and communication system as required. 3Q 2016

ANTICIPATED SOLICITATION Station Renovation ANTICIPATED SOLICITATION Full Design Const. BABYLON STATION RENOVATION Replacement of the two station platforms at Babylon, located in Suffolk County. Replacement of existing elevators, escalators, platform waiting rooms, platform canopies, signage, lighting and other station elements. 2Q 2016 4Q 2018 NOSTRAND AVENUE STATION RENOVATION Rehabilitation of Nostrand Ave Station on the Atlantic Branch in Brooklyn. ADA compliant elevators; new station platforms, railings, and canopy roofing system; stairs and handrails; upgrades to station lighting, electrical & communication systems, and signage. Complete 2Q 2015 MTA Long Island Rail Road

MTA Long Island Rail Road Team Up: Team Up for Design-Build Projects Team Up for MBE/WBE/DBE Compliance Team Up for Code Compliance Team Up with the Experts Team Up for Competition MTA Long Island Rail Road

MTA Long Island Rail Road THANK YOU MTA Long Island Rail Road