STREETS & STORMWATER DEPARTMENT

Slides:



Advertisements
Similar presentations
City of Hubbard Transportation System Plan Update April 25, 2012.
Advertisements

Titusville to Edgewater Bike Loop PD&E Study
Silver Star Rd. (SR 438) Public Meeting Public Information Meeting Intersection Safety Improvements Silver Star Road (SR 438) at Ocoee Hills Road From.
FDOT District 5 MAINTENANCE RESURFACING SR 100 Moody Boulevard from East of I-95 to SR A1A Ocean Shore Boulevard GENE VARANO PROJECT MANAGER 719 S. Woodland.
Building Innovative Facilities for a Multimodal Future 2014 BICYCLE MASTER PLAN UPDATE FINAL PUBLIC REVIEW Baltimore City Department of Transportation.
ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
PROPOSED HPD BIKE-PED MASTER PLAN HPD PRESENTATION.
1 City of Rapid City and Rapid City Community Planning RAPID CITY BICYCLE AND PEDESTRIAN MASTER PLAN in collaboration with: Kadrmas, Lee and Jackson RDG.
Pinehurst School Traffic Safety Pinehurst School Traffic Safety Meeting January 27-28, 2015.
University Bike Master Plan. University Policy  Bicycle committee recommends that the current policy for bicycles on sidewalks be changed to create a.
Bike Routes and Pedestrian Routes. Bike Route Goals Create a safe route through the city Connecting parks, schools, and subdivisions Raise awareness of.
Utah Collaborative Active Transportation Study.  Regional Collaboration.
1 UNION STREET Easthampton | Complete Street Conceptual Design { { Streetscape for Union Street Community Workshop October 28, 2013 Planning Department.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Bicycle and Pedestrian Planning May City of Ellsworth Bike-Ped Planning May 2009 Accomplishments: POLICY and ADMINISTRATION The City Council adopted.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Grand Canalscape Phase I: Phoenix Uptown and Gateway North Update Kerry Wilcoxon City of Phoenix Street Transportation Department Safety and Neighborhood.
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
N. Hancock Road Traffic Signals October 14 th, 2014 Presentation Prepared By Lake County Public Works Department.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
1 1 City Commission Workshop for the DRAFT Basis of Design Report December 14, 2015 CRAVEN THOMPSON & ASSOCIATES, INC.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Policy Change August 2009: The Planning Commission added the Walkability Amendment to the Comprehensive Plan. September 2009: Council adopted a Complete.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2013/14 – 2017/18 Presentation to Board of County.
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
Smyrna’s Major Thoroughfare, Bicycle, and Pedestrian Plan TOWN COUNCIL RETREAT APRIL 14, 2015.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
 Connect the Coastside Presentation Half Moon Bay City Council Briefing March 15,
RebuildIndy Indianapolis Department of Public Works March 2011.
Proposed amendments to LCMC “Prohibited activities while driving” and LCMC “Penalty assessment misdemeanor; definition; schedule.
Pedestrian Facility Improvement Program
Arizona Forward Update
Bicycle and Pedestrian Safety Action Plan
Pioneer Road Relocation and Reconstruction Project
Rapid City Community Walk Audit
Bicycling in Minneapolis Bicycle Master Plan/Protected Bikeway Update
Transportation Improvement Plan (TIP) Project Solicitation
CONTRACT AWARD TO ALTA PLANNING AND DESIGN FOR CONSULTANT SERVICES TO CONDUCT SAFETY OUTREACH AND UPDATE THE SUGGESTED ROUTES TO SCHOOL MAPS FOR THE SAFER.
Finance Committee & City Council October 10, 2016
Pedestrian and Bicycle Advisory Commission and Fort Worth Bike Sharing
The Central Avenue Connector Trail
City Council Meeting November 7, 2016
Center City Connector 101.
Cycling infrastructure spending 2017
WELCOME State Road 50 (Cheney Highway) Overview and Methodology
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Complete Streets Policy + Bicycle / Pedestrian Plan
SR 60/Kennedy Boulevard and Jackson Street Resurfacing Projects
River to Sea TPO Meeting US 92/International Speedway Boulevard
Kerr Tar Project Update – June 2016
Texas Department of Transportation
Grey County Transportation Master Plan
OR 99E Corridor Segment Plan
Meeting of the Hillsborough MPO Board December 5, 2017
Capital Improvement Program
Transportation Projects
Tram cycle safety improvements programme
Early Voting Starts Oct. 20 | Election Day Nov
Committee Update August 27, 2018.
West Campus Parking Deck & Roadway Update
Meadow Lake Boulevard Street Extension Project
Orange Grove Boulevard Complete Streets Project
MPO Board Presentation
DDOT Western Avenue, NW Project
Harbour Island Force Main Replacement
Ohio-Kentucky-Indiana Regional Council of Governments
Alex Henry FDOT District Seven Safety Office
Interlocal Cooperative Agreement FY 20
Black Mountain Parking & Circulation Study
Presentation transcript:

STREETS & STORMWATER DEPARTMENT Presented by: STREETS & STORMWATER DEPARTMENT Gregg Strakaluse, Director and George Archibald, Traffic Engineer May 14, 2012

PEDESTRIAN AND BICYCLE MASTER PLAN BACKGROUND: PLAN DEVELOPMENT: 2006-2007 ADOPTION: October 2007 pursuant to Res. 07-11791 & 07-11792 BASIS OF PROGRAMS: SIDEWALK IMPROVEMENTS: School access Missing links Collector roads BIKE IMPROVEMENTS: Signing and marking bike facilities Establishing routes and segments on Gulfshore Blvd. Construct routes on Crayton Rd. and Gulfshore Blvd. Education & Safety

COMPLETED and/or FUNDED SIDEWALKS To leverage State funding opportunities and more quickly complete sidewalk gaps, the City has successfully worked through the Metropolitan Planning Organization.

COMPLETED PROJECTS 5th Ave South and 2nd St. S. 5th Ave South and Gulf Shore Blvd.S.

COMPLETED PROJECTS Harbour Drive Sidewalks and Bike Lanes

COMPLETED PROJECTS Gulf Shore Blvd. Sidewalks

Park Shore Drive Sidewalks COMPLETED PROJECTS Park Shore Drive Sidewalks

PROJECTS STILL TO BE COMPLETED (Public Involvement/Design/Const) 1) St. Ann Middle School Sidewalks (Various Locations) 2a) 2nd St. S. Sidewalk (Central Ave. – 5th Ave. S.) 2b) 2nd St. S. Sidewalk (6th Ave. S. – 11th Ave. S.) 3) 3rd Street North Sidewalk (Central Ave. – 7th Ave. N.) 4) Harbour Drive Sidewalk (Crayton – Binnacle) 5) Gordon Drive South Sidewalk (Kingstown Dr. – Cutlass Ln) 6) GSBN Sidewalk (Seagate – Horizon) $ 358,502* $ 45,765* $ 143,762* $ 294,930* $ 181,966* $ 383,238* $ 435,915* * Estimate based on $13.50 / SF

St. Ann School

Sidewalks for beach access

WALKABILITY SCORE City of Naples 88 Collier County 46 City of Fort Myers 72 Lee County 43 City of Bonita Springs City of Marco Island 40 http://www.walkscore.com/

PLAN AMENDMENTS TO CONSIDER Sidewalks for beach access Greenway and Park-to-Park connectivity Establishment of new bike routes Walkability program for downtown Public awareness-safety program Way finding signs

PUBLIC INVOLVEMENT/SCHEDULING Public Meetings Presidents Council Presentation Social Media Flyers Mailings Scheduling: Jun. 2012-Dec. 2012

SUMMARY OF RECOMMENDATIONS Allocate Department staff time and $15,000 from the Streets & Traffic Operating Budget towards transportation consulting fees (approx. 100 man-hours over 7-months). Develop Specific and General Plan Amendments To Consider – late spring Coordinate the Public Participation Processes – summer and early fall Compile Proposed Amendments - late fall City Council Workshop - end of 2012