Services Layout – Update

Slides:



Advertisements
Similar presentations
WP7 ATLAS ID Barrel End Services T.J.FRASER UCL Aim: Using experience gained from work on the current ATLAS SCT Barrel, attempt an improved design and.
Advertisements

ATLAS UPGRADE BARREL END SERVICES – Work on trying to reduce mass of cooling in R/PHI TJ Fraser UCL Assuming cooling pipes have to be directed.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
News from B180: DC-DC Stavelet with HV MUX One hybrid shows ~20ENC extra noise, others much the same. Not yet understood - investigations continue Carlos.
Barrel services minimum space allocation in Z ‘Strawman’ layout and Spider… layout WARM and COLD GAP versions Services envelope in Z: In order to reserve.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
MICE: Hall Infrastructure Chris Nelson CEng CM16 8 th Oct 2006.
MICE Collaboration meeting at Berkeley 9 – 12 February 2005 Cooling Channel layout Presented by Stephanie Yang & Wing Lau.
Prototype sector Ian Wilmut Dec What we didn’t include in the proposal... A fully functioning electrical prototype of staves via services to DAQ.
Theodore Todorov Pixel mechanics november 8th Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
Comparison of cooling services at barrel end Description SCT Barrel Upgrade ID barrel one end one end Total number of staves/rows 176 Staves/rows serviced.
SLHC - WP7 Barrel UPDATE on LAYOUT OF SERVICES AT THE BARREL ENDS OPTO PCBS: Sketches describe options after discussion with Tony Weidberg ( ) Preference.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
ATLAS SLHC UPGRADE ENGINEERING – LIST OF DECISIONS which will affect the design of auxiliary systems layout and routing BASIC LAYOUT FOR BARREL and WHEELS.
Modularity in the Phase II Upgrade of the ATLAS Strip Tracker Ian Wilmut.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
SLHC Pixel Layout Studies S. Dardin, M. Garcia-Sciveres, M. Gilchriese, N. Hartman LBNL November 4, 2008.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
HEP GROUP MEETING work on the ATLAS UPGRADE T.J.Fraser.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
M.Oriunno, SLAC Stave cable and module options. M.Oriunno, SLAC Background - module The IBL electrical unit for data output is a single chip The use of.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
1 US Pixel Mechanics Role Global support structureIntermediate support structureLocal support structure Stave SectorDisk Barrel x (9-11) x5 x (22,40,56)
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
November 04 Jason Tarrant CCLRC1 SCT EC Interconnects l Progress of SCT EC Interconnects »Services (Required for Disc Insertion 2004 / Integration 2005)
S Temple CLRC1 End-cap Mechanics FDR Power Tapes and Optical Fibres Steve Temple, RAL 1 November 2001.
Update on Module Mounting on Staves and Stavelets 25/8/11 1.
1 Outer Barrel, Phase 2 Mech Review 26 Aug 2013, indico: Antti Onnela, CERN Tracker Phase 2 Mechanics Review, 26 August 2013 Status of the Outer.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
End-of-stave region. 2 Space Z-dimension is critical –Keep gap small (might help getting rid of stubs) Edge of last barrel silicon (at corner) is 1277.
Alpine pixel layout Integration progress Teddy Todorov For the ATLAS-LAPP group AUW Integration meeting 20/11/2012.
Stave - Electrical Break Richard French The University of Sheffield Material from the ATLAS SCT/IBL/PIXEL community.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
June 10, 2004Modular Coil Winding & Cooling WorkshopJ.H. Chrzanowski 1 Modular Coil Cooling Issues With Baseline & Status of Cooling R&D James H. Chrzanowski.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
Robert Pak VTX Meeting June 3, Robert Pak 1 VTX Meeting June 3, 2005 General Progress Started general integration meetings for detector upgrades.
High Voltage Cards & 2000 Electronic/Thermal Model. CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000A.B.Lodge - RAL -1 ECAL End Cap 1 EE End Cap Engineering.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
C.BAULT November 9 th  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14  SERVICES AND STRUCTURES INVENTORY  ENVELOPE SERVICES  BARREL SERVICES ROUTING.
August 04 Jason Tarrant CCLRC1 SCE EC Design & Manufacture l Progress of SCT EC »Support Structure (Required for Disc Assembly 2004) »Services (Required.
D. Greenfield CLRC1 End-cap Mechanics FDR Baseline Design Overview Debbie Greenfield, RAL 1 November 2001.
Comments on Engineering talk by A. Catinaccio at Inner Tracker Engineering Meeting CERN ) Fixed length barrel layout drawing by C. Bault (Strawman.
Pierre Delebecque Cooling – upgrade 2012 May 31 st 1 Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
ATLAS ID Services Mock Up - Proposal Presented by Ian Wilmut at DESY, update from John Hill 4th May, 20101ATLAS Upgrade - RAL.
USTileCal Planning UTA ITC Scintillator Project R. Miller May 13, E3 C10 B11 E1 D5 A14 - A15 B14 D6 A D4 A12 A13 B12 - B
EC: 7 DISK concept Preliminary considerations
Straw man layout for ATLAS ID for SLHC
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
ATLAS Internal ID Service Integration
P. Sutcliffe Liverpool University
Update of MVD services and requests
Cylinder design Ian Wilmut 10/11/11.
End-cap Mechanics FDR Overview of the Project
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Services – First Considerations Sigi Wenig / Nicolas Massol ATLAS Tracker Upgrade Workshop Valencia December 2007 Existing services (in cryostat.
Micro Vertex Detector of PANDA Strip Detector
? ENDCAP: Mechanics IFIC-Valencia.
Mechanics: (Tim).
WP9 ITS Mechanics and Cooling
WP4 – Plans for next 6 months
UT Integration meeting UT CO2 COOLING DISTRIBUTION SYSTEM
Chamber Design and Integration RE3/1 and RE4/1
ATLAS ITk CO₂ Cooling pipe routing CO₂ Meeting, 28 June 2016
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
ATL-IC-ES new version available - approval starts
Advantages and Challenges of this design Today status of the design
Presentation transcript:

Services Layout – Update Latest work and developments of Service Module concept John Hill - RAL 6th November 2012 ATLAS ID Upgrade FtF

Recent developments of Service Module Design work on Service Module principle has continued in the UK. A number of updates have been undertaken on our baseline 1/32nd sector design. Recent developments on the proposed Cartigny Layout has lead to further investigations. These are: Update to Cooling Pipe layout, electrical connector and intalink design on barrel staves. Extra Cooling Line added in Service module to cope with power demands of short strip staves Potential changes to ID envelope have led us to look into alternative ‘narrow but wider’ SM design Thermal enclosure end plate ideas further developed 6th November 2012 ATLAS ID Upgrade FtF

Updated Details on ID stave end of SM ID interlink SM Electrical Services Stave cooling pipe (in plane with stave, looped to deal with any movement during thermal contraction) Si detector Stave Stave Connector PP0 (mounted to interlink for strain relief) Extra Cooling line added PP1 Connector Services (proposal currently being prepared) SM sealing/grounding plate Fibre Optic Connectors CO2 input/output lines 6th November 2012 ATLAS ID Upgrade FtF

Service Module Design based on original ID Envelopes 6th November 2012 ATLAS ID Upgrade FtF

Potential scheme based on ID (Cartigny) Service routes Install Service Modules for ID Barrels Install End Cap Attach enclosure bulkhead ID Barrels assembled/inserted End View, SM and EC services at outer R 6th November 2012 ATLAS ID Upgrade FtF

Service arrangement Scheme for Barrel and End Cap End Cap at insertion stage End Cap installed Outer Seal plate. Fits over Barrel and EC services, fixture to thermal enclosure and structural bulkhead Barrel Services EC Services Inner duct seal 6th November 2012 ATLAS ID Upgrade FtF

Service Module Design based on ‘challenging’ ID Envelope 6th November 2012 ATLAS ID Upgrade FtF

View of narrow Service Module Design (sans duct) 6th November 2012 ATLAS ID Upgrade FtF

Connectors and cable harness Following on from the study work undertaken by LAPP, the UK has followed this up by discussing possible solutions for cable and connector harnesses (PP0-PP1). As space is at a premium within the Service Module it may be necessary to ‘form’ specific cable sections to allow fitting. Typical Tekdata arrangement Several options for connector and shielding schemes are being investigated. Talks with Axon and Techdata are ongoing, Oxford will progress developments over the next couple of months following recent visit to Axon Typical Axon Micro-D 6th November 2012 ATLAS ID Upgrade FtF

Cooling manifold design CMS Manifold (EB welded) Typical SM manifold arrangement for narrow duct arrangement. Plans to manufacture working prototypes on this design Alternatives for manifold design can be investigated (using EB welding technology) 6th November 2012 ATLAS ID Upgrade FtF

Summary of work in UK ‘Mechanical’ update to UK stave design, update arrangement of cooling pipes, interlinks and connector (Stave connector and flexi yet to be fully defined) - Service module updated to incorporate extra cooling lines, cooling lines optimised to new stave arrangement, re-routing of barrel electrical services, hermetic seal for duct updated, thermal enclosure seal updated (we have yet to come up with the definitive PP1 connector arrangement for SM) Cartigny proposals have not changed the basic principle of Service Module design or installation for barrels although this has led us to scheme the narrow SM (does this arrangement work with the End Cap design and envelope…?) -Engineering and working prototypes of ‘typical’ cooling manifold to be manufactured (using vacuum brazing) at RAL based on current SM layout design -Engineering and working cable harnesses to be manufactured, probably by both companies (Axon and Tekdata), Oxford to progress. 6th November 2012 ATLAS ID Upgrade FtF

Extras 6th November 2012 ATLAS ID Upgrade FtF

Extras 6th November 2012 ATLAS ID Upgrade FtF

Extras 6th November 2012 ATLAS ID Upgrade FtF

Extras 6th November 2012 ATLAS ID Upgrade FtF

6th November 2012 ATLAS ID Upgrade FtF

6th November 2012 ATLAS ID Upgrade FtF

6th November 2012 ATLAS ID Upgrade FtF