Presentation is loading. Please wait.

Presentation is loading. Please wait.

Prototype sector Ian Wilmut Dec 2012. What we didn’t include in the proposal... A fully functioning electrical prototype of staves via services to DAQ.

Similar presentations


Presentation on theme: "Prototype sector Ian Wilmut Dec 2012. What we didn’t include in the proposal... A fully functioning electrical prototype of staves via services to DAQ."— Presentation transcript:

1 Prototype sector Ian Wilmut Dec 2012

2 What we didn’t include in the proposal... A fully functioning electrical prototype of staves via services to DAQ and plant, in a partial structure. But we do have 90% or the parts for such a prototype in the programme (even when it is descoped). Tim has asked me to talk aout what this object might be, and what WP4 would need to provide.

3 Schematically...... Outer Cylinder/Thermal enclosure AKA a big foam box DAQ (Opto and DCS) POWER SUPPLIES Recirculating CO2 Plant 1 service module n staves (n~7) Stave insertion frame

4 But we would need to make compromises......... Outer Cylinder/Thermal enclosure AKA a big foam box DAQ (Opto and DCS) POWER SUPPLIES Blow off CO2 plant 1 service module n staves (n~3) Stave insertion frame

5 What I would like to be able to do Operate a number of fully serviced staves in the correct positions – with there correct spacing to their neighbours. Staves to be inserted using correct process Staves to be serviced by service module “outer cylinder box ” is representative of the environment. Cooling is manifold CO2 – so we can test manifolding and pressure drops/ballencing

6 What WP4 needs to do Ahead of time – Understand what we would like to get out of process – Understand what baseline choices we would make – Have a sketch design of how we could do this WP4 items that are not explicitly in programme – “outer cylinder” – Compressed service module Efforts we would need to provide – Build test setup – Install staves – Connect to service module – Willingness to move staves – Provide and drive cooling – Build staves –.


Download ppt "Prototype sector Ian Wilmut Dec 2012. What we didn’t include in the proposal... A fully functioning electrical prototype of staves via services to DAQ."

Similar presentations


Ads by Google