Penn Medicine Chester County Hospital

Slides:



Advertisements
Similar presentations
NOTICE SUBMISSIONS Requirements and Procedures 1.
Advertisements

PROJECT EMERALD SKYLINE
STEFFIAN BRADLEY ARCHITECTS – BRIERLEY HILL PLANNING PRESENTATION.
NGA Collaboration Forum 11 December 2013 VCC Parking Lot.
SSM St Anthony Hospital Shawnee West MacArthur Campus Expansion and Renovation Shawnee, Oklahoma Design Development February 7, 2013.
Front view of coach house (photographer facing west) Front view of coach house (facing north-west)Side view of coach house (facing south) Rear view of.
FP- Level 0FP- Level 1FP- Level 3FP- Level 4FP- Level 5FP- Level 6FP- Level 7 INTERIOR Dining 2 Dining 1 Admitting FLOORPLANS EXTERIOR Site Plan Overall.
Current Project Update October 25th 2012 Good Evening!!!
Construction Update September 2014 Madison Elementary School District.
Campus signage – Internal
September 21 Update. Future Main Entrance (looking south)
Sarasota Memorial Hospital Campus Improvement Plan Neighborhood Advisory Council October 12, 2010 Construction Update.
Emaar Residences (launching soon- Q4 2014). Plot IDLand-UseNLAGIFANSATCA No. of Units ResidentialRetail E5 Residential / Commercial Tower 10,17851,89144,10868,
Project Title Eli and Edythe Broad Art Museum Award Category Building.
The Johns Hopkins Hospital New Clinical Building Program Overview April 28, 2008.
Glenvar High School Renovations School Board Presentation
DESIGN PRESENTATION APRIL FAÇADE DEVELOPMENT.
Church Renovation/ Expansion Proposals Willowdale.
The Pavilion Pre-Submittal Conference April 1, 2010.
©2015 Harman Scott What is your ‘vision’ in this life? Mine is to create spaces where you can connect with your vision.....
London Transport Museum Exploring the story of London, its transport system and the people who have travelled and worked in the city over the last 200.
London Transport Museum Exploring the story of London, its transport system and the people who have travelled and worked in the city over the last 200.
Property: Block of Norzagaray-San Justo-San Sebastian Exact address: #251 Calle San Sebastian Viejo San Juan, PR.
Modernization Project Identify Priorities – Patient Safety Quality of Care Efficiency Discover Opportunities - Existing Hospital Garner Regulatory Support.
Winchester Medical Center Campus Expansion June 21, 2011.
Design Development Review
Phase III Design Development Finalization December 23, 2008 apcosigns.com.
  Provide a library link at an existing campus crossroads and a new face for the combined Deering Library/ University Library complex  Strengthen the.
BUILDING ANALYSIS Established in PG5 is a diverse building, consisting of the following:  Parking garage  Classrooms  food court (seats 300) 
Hotels April 18 th, context Elements Layout Rooms Amenities Motels.
North Augusta High School Design Development Presentation.
County Commission: Preliminary Design Aerial Photo GRACE Marketplace One Stop Homeless Assistance Center Phase-1.
Learning, Health, and Safety Capital Project Alternates and Change Order
Sarasota Memorial Hospital Campus Improvement Plan Neighborhood Advisory Council March 13, 2012.
SP+a © Sameep Padora and Associates BASERA-E-TABASUM BASERA-E-TABASUM, BEERWAH KASHMIR.
DON’T PANIC Mesa County Public Library District Evacuation Procedures These are general instructions and procedures. Every situation is different. Use.
COZYEON Residence Main facilities gallery. Corridor of each floor.
Out Patient Entrance Before Construction. Out Patient Entrance After Construction.
Board of Trustees Meeting February 25, Strategic Plan Alignment Strategic Priorities from the Strategic Plan 
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
Sauriol Bohde Wagner architects and associates, inc Garfield Road Macomb, Michigan ph fx.
1 Update on Off-Campus Development in South County: Update to FPP CAC – August 25, 2015 Siteman Cancer Center Expansion Phase II Development.
The Campus 2.06 Acres or 89,734 sq ft of Land 25,058 sq ft Church Building 4,239 sq ft Sanctuary 497 sq ft Balcony 20,322 sq ft Multipurpose.
The New Echuca Hospital October 2011 Update
Project Profile.
Coffee Chat: LA COSTA MEADOWS Elementary school Construction update
2006 Facilities Master Plan Update Cañada College
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
UW Medicine Lake Union Phase 2
Building Committee April 20th, 2016.
Medical Education Information
CUH Opened December 2014 Replaced St. Paul University Hospital.
Facilities Update November 17, 2017
Northwest Hospital Childbirth Center Planning
Wayfinding and Signage
New York City Master Plan Update
1 Semester Project Design A Multi Story Office Building
Troy School District Bond Program – Series 1 Construction Update
DOVER ELEMENTARY Existing MPB (2/14/12).
The Pavilion 261 Old York Rd, Jenkintown, PA 19046
CAVE SPRING HIGH SCHOOL SITE PLAN JOB NO NOVEMBER 27, 2017
New Gorbals Health and Care Centre
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
WES Renovation Update Photo Gallery
Continuing challenges regarding previous “findings” :
GBCORP TOWER Prime office space for lease. BAHRAIN FINANCIAL HARBOUR
North Augusta High School – Phase 2A and 2B
SERVICES OFFICES RESTAURANTS / BARS S1 Bell Desk S2 UPS Store
BUILDING LIGHTING PLAN PHASE II
Presentation transcript:

Penn Medicine Chester County Hospital Procedural Platform Update 15 April 2016

Masterplan Phasing – Existing Campus

Phase 0: 700-Car Parking Garage

Phase 1: Procedure Platform, Main Entry, Elevator Cores & Phase 1: Procedure Platform, Main Entry, Elevator Cores & Connections, ED Expansion Space

Phase 2: Emergency Department Renovation

Phase 3: Patient Tower & Helipad

Phase 3: Patient Tower & Helipad

Parking Garage Design Front View Rendering South and East Elevations

Site Plan Update – Procedure Platform

Overall Exterior View Update

Exterior View from Entry Court

MAIN ENTRY UPDATE

FLOOR PLAN – OVERALL GROUND FLOOR PAT/NON-INVASIVE DROP-OFF

FLOOR PLAN – GROUND FLOOR LOBBY & AMENITIES VISITOR ELEVATORS BATHROOMS SERVICE CORRIDOR PAT/NON-INVASIVE CHECK-IN PAT/NON-INVASIVE WAITING COURTYARD GARDEN CONFERENCE ROOMS FRONT ENTRY WHEELCHAIR STORAGE GENERAL WAITING GIFT SHOP GIFT SHOP STORAGE RETAIL PHARMACY STAIR TO E.D. CAFÉ SEATING BATHROOMS CAFÉ ELEVATOR TO E.D.

INTERIOR - LOBBY

INTERIOR COURTYARD COURTYARD GARDEN LOBBY

FLOOR PLAN – OVERALL FIRST FLOOR SURGICAL WAITING E.D. WAITING E.D. DROP-OFF

FLOOR PLAN – FIRST FLOOR LOBBIES VISITOR ELEVATORS SURGICAL WAITING COURTYARD GARDEN (UPPER LEVEL) CLINICAL CORRIDOR E.D. WAITING STAIR TO LOBBY ELEVATOR TO LOBBY.

LANDSCAPE

LANDSCAPE

INTERIOR COURTYARD

EXTERIOR SIGNAGE - CAMPUS ENTRANCE

EXTERIOR SIGNAGE

EXTERIOR SIGNAGE - MAIN ENTRANCE CONCEPT

EXTERIOR SIGNAGE - ED ENTRANCE CONCEPT

GARAGE UPDATE