Presentation is loading. Please wait.

Presentation is loading. Please wait.

New Gorbals Health and Care Centre

Similar presentations


Presentation on theme: "New Gorbals Health and Care Centre"— Presentation transcript:

1 New Gorbals Health and Care Centre
Glasgow City HSCP New Gorbals Health and Care Centre Hamish Battye, Head of Planning and Strategy, Older People and South Locality Lisa Martin Community Engagement Officer December 2018

2 Current Position Building was handed over on Tuesday 6th November 2018
Planned opening date is Monday 21st January 2019 Handover period to deal with any ‘snagging issues’ Address: New Gorbals Health and Care Centre 2 Sandiefield Road Glasgow G5 9AB Telephone number for main Reception: ______________________________________________________________________________________________

3 Services All services in the current Gorbals Health Centre including:
GP practices, dental practices, treatment room services, physiotherapy, podiatry, district nursing, health visiting, speech and language therapy and other clinics such as dietetics, community mental health services and others All services in the current Two Max Building including: Children and Families tea, Homelessness Team, Alcohol and Drug Recovery Service and Criminal Justice Team All services in the current South Bank Centre including: Specialist Children’s Services, CAMHS and Community Paediatrics

4 Ground Floor Plan

5 First Floor Plan

6 External Elevation Left: Front Entrance Above: Sign

7 Above: Corner elevation above Alcohol and Drug Recovery Service
Above: Corner elevation above Alcohol and Drug Recovery Service Above: Controlled access at Sandiefield Road

8 Internal Images Left: Main stairwell Above: 2nd Floor corridor

9 Far left: Internal signage
Standard Clinical Room

10 Left: Main Atrium Above: Courtyard View

11 Transport, Parking and Access
Travel Plan sets out how we will support visitors and staff to consider active and alternative travel to the Centre On site secure bike parking for visitors and staff Electric bikes for staff Electric car charging space Local public transport options highlighted to all staff Parking Plan in place to manage the 75 available spaces Disabled spaces at the front of the building Discussions with Co-op re: access to spaces in car park on-going

12 Publicity and Communications
Open evening and site visits being planned in lead up to the opening on 21st January 2019 Newsletter being published in December 2018 with all the information patients, users and the wider public will need to access the new building Articles in HSCP newsletter, NGHA newsletter and local websites Social media – follow us on Ministerial opening to take place sometime in early Spring (date pending)

13 Your comments/feedback/questions.
Discussion Your comments/feedback/questions. Thank you.


Download ppt "New Gorbals Health and Care Centre"

Similar presentations


Ads by Google