1 UW Medicine Lake Union Phase 2
New Site Plan Phase 1 lab building Phase 2 includes a new laboratory building and new office building Lab building connections between Phase 1 & Phase 2 at basement and floors 1-4 Ground floor connections, interior courtyard at same elevation Parking – all car & bike parking in underground parking garage, access off Republican Street Shuttle stop located on Republican Street Loading dock located in underground parking garage, access off 9th Avenue Phase 2 lab building Phase 2 Office building Phase 2 lab building

2 UW Medicine Lake Union Phase 2
View from Mercer & 8th Ave Phase 2 laboratory building is five stories with a basement level Facade is glass and metal panels designed to bring as much daylight into the labs as possible Perkins+Will Architecture

3 UW Medicine Lake Union Phase 2
View from Republican & 9th Ave Office building is five stories Façade is glass and metal panel Office building is located in the southeast corner of the site Perkins+Will Architecture

4 UW Medicine Lake Union Phase 2
Interior Courtyard Outdoor seating for lunch or casual meetings Sunny areas and shady areas Lush planting to contrast with the glassy facades Materials selected for aesthetics, durability and to discourage skateboarders

5 UW Medicine Lake Union Phase 2
Schedule June 2005 Start Design February 2006 Start Utility relocation (parking on the north side of the 815 Mercer building removed) May 2006 Start excavation (all parking moved to off site parking & access into the building protected by construction fencing) December 2006 Excavation activities complete March 2008 Building substantially complete April 2008 Park in new underground garage June 2008 Phase 2 end users move-in

6 UW Medicine Lake Union Phase 2
Construction Logistics – Off Site Parking Plan Parking plan developed by UWSOM: Lot at Mercer & Terry (behind Rosen Bldg) Monthly UW permits Lot at Republican & 9th Daily UW permits, UW Shuttle Bus Bike lockers Lot at Mercer & 8th Handicap parking