Presentation is loading. Please wait.

Presentation is loading. Please wait.

COZYEON Residence Main facilities gallery. Corridor of each floor.

Similar presentations


Presentation on theme: "COZYEON Residence Main facilities gallery. Corridor of each floor."— Presentation transcript:

1 COZYEON Residence Main facilities gallery

2 Corridor of each floor

3 The elevator and fire extinguishing system in the corridor

4 Stairs entrance of building inside

5 Stairs of building

6 Postbox of each room at the 1/F front door

7 Transformer room Water tank, fire pump, water supply pump, septic tank manage room

8 Emergency light at the stairs of each floor

9 The veranda on 9/F

10

11

12 Automatic meter reading electricity for every room and each floor

13 Automatic meter reading water for every room and each floor

14 Automatic meter reading Gas for every room and each floor

15 Fire alarm system in each floor

16 Fire extinguisher set up in each floor’s corridor and inside every room

17 The standpipe system in each floor

18 The visitor interphone set up in every room

19 Digital door lock in every room

20 Direct phone call between 1/F and 13/F for emergency

21 Canopy style open area in top roof

22

23 2/F Community Room

24 1/F Toilet (for disable)

25 1/F Lobby

26 1/F MDF ROOM

27 1/F Elevator entrance

28 1/F Information desk (management office)

29 Fire, communications, broadcasting, smoke exhaustion control system

30 1/F The entrance

31 1/F Video phone for visitor and residence & entrance controls card key systems

32 1/F Auto-door at the entrance

33 1/F Car park entrance


Download ppt "COZYEON Residence Main facilities gallery. Corridor of each floor."

Similar presentations


Ads by Google