Gluing jigs for Demonstrator

Slides:



Advertisements
Similar presentations
Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
Advertisements

ATLAS Module building at Glasgow
Prepared by: Barry Sparrow and Sal Ienco Civil/Construction Sault College.
Hybrid assembly at Glasgow. Placing ASICs Arrange 20 ASICs in ASIC tray with strip bond pads facing outwards – ASICs to be used in ‘Cat A’ sample boxes.
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 Stave.
Status Update on Mechanical Prototype in Rome November 6,
ATLAS IBL Tool for gluing flex on omega C.Bault/FX Nuiry - IBL Stave Meeting - UniGe August 31st Process description This tool has been designed.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
MM mechanical prototype Work progress at CERN MicroMegas General Meeting, CERN, 5-6 November
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
CERN PH/DT 12/05/13 Jordan Degrange / Francisco Perez Gomez CERN PH/DT.
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
Hybrid Integrated Circuit
Receive processed un-thinned wafers from E2V. Processed for bump bonding (dice, bump and attach read out chip)
NSQP MEETING Valery AKHNAZAROV January 20th 2011 ISP PP0 Board Bonding Procedure Type 1 Type 3 Type 4peek Type 4 Assembly Name: ISP ASM Parts.
Slide 1Susanne KyreTracker week, October 2005 TEC/TOB bias bonds Susanne Kyre University of California, Santa Barbara.
LHCf Arm2 – status of hardware upgrade in Firenze Lorenzo Bonechi 20 December 2013.
16-Oct-15S.Movchan Straw manufacturing and QC1 Straw machine status polished anvil new welding configuration software for on-line seam quality control.
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
Silicon /pcb assembly R Thompson, J Freestone LAL 3 June 08.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
GLAST LAT ProjectSLAC, May 14, 2003 A.Brez 1 Honeycomb grounding of the GLAST trays Tray electrical conductivity: Carbon Carbon, carbon fiber and Al core.
Status of GEM T2 assembly Outline Status of the GEM components Summary Tests TOTEM Collaboration meeting CERN / Risto Orava for Kari Kurvinen.
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 StaveMarco Kraan Paul Kuijer.
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
Hybrid Mechanical/Thermal Design Ray Thompson / Manchester FP420 meeting Torino 11/12 July 06.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
Hybrid panel heated plate study Currently the curing of the ASIC glue for the hybrid panels are done at room temperature. This is a study to determine.
David Bailey Gluing. Silicon /pcb assembly Previously Using Sony Robot and precision dispenser Have established acceptable glue dot parameters Dot electrical.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
Gluing, measuring and shearing Heated plate curing Is the process feasible? Tests with 130nm hybrids Measure resulting glue thickness Determine the shear.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
TRIO-CINEMA 1 UCB, 2/08/2010 CINEMA Solar Array Design Review Yashraj Khaitan David Glaser Kevin Jenkins Chris Pasma Space Sciences Laboratory University.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
1. Take HV harnesses with label (IHV2) and transfer on the Stacking table. 1.1 Inspect HV harnesses visually. 2.1 Insulate HV Flex with 3M™ VHB™ Tape.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
WP7&8 Progress Report ITS Plenary meeting, 10 June 2014 LG, PK, VM, JR.
Conductive glue tests. J.Wickens 12/7/04 Used small pieces of HV kapton cut from redundant (old) stock, glued to silicon test structures from Karlsruhe.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
NSQP MEETING Valery AKHNAZAROV January 20th 2011 Corrugated Panel Bonding Procedure Assembly Name: ISP Corrugated Panel ASM Parts.
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
Module mounting possibilities (FDR and module task force proposals) & Module mounting status at Dortmund Daniel Dobos, University of Dortmund
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Ladder Assembly - Conceptual design of jigs -
A Different Soldering Class “Surface Mount Soldering”
Berkeley status Aug 10th, 2012.
Procedure for MCM rework on tray MID 070
ATLAS pixel module assembly flow
Update on Pavia MM mechanical prototype
Ladder Assembly All tools and jigs produced Glue dispensing works
Sector 002 Assembly status report
Hybrid Issues.
Ladder Assembly All tools and jigs produced Glue dispensing works
Status of straw production straw module assembling
Mechanics: (Tim).
Soldering process 1 Add the soldering material on the soldering pad of speaker in order to solder the wire on the speaker.
Pixel Demonstrator Programme
HIC Assembly - Liverpool
Module/Ladder Assembly
Pixel module assembly tooling
After service guide for changing PCB
Updates on the Silicon Tracker 2S Module
Presentation transcript:

Gluing jigs for Demonstrator Kari Lovise Ness, Diego Alvarez Feito, Susanne Kuehn, Maurice Marcel, Jordan Degrange CERN EP-DT-EO Demonstrator Heater Discussion CERN, 20.09.17

Positioning of silicon and flex 3 main items Positioning of silicon Positioning of flex Vacuum pickup tool 3D-printing and machining Vacuum pickup tool Silicon positioning Flex positioning

Positioning of silicon Positioning with three pins Positioning of silicon with vacuum pen Vacuum on Pick up with vacuum tool

Positioning of flex Positioning with two pins Positioning of flex with two pins In place by vacuum holes

Gluing Dots of glue Tape in areas with wire-bonding 8 hours curing UHU Endfest Tape in areas with wire-bonding PPI Tape 8 hours curing

Wire-bonding Remove frame Wire-bond jigs

Wire-bonding Pitch 80mm

Potting, transport and bending Proposal to do potting with Dymax 9001.v3.1 and bending of flex at CERN 100 transport frames in production in Bonn With space for connecting the readout board for testing

Next Test with heater and flex and flex dummies Assembled one real to validate tooling Check with company for production of 4(?) sets of tooling to distribute Distribute: tooling and dummy components

Procedure The steps for the heater assembly are: Clean jigs with isopropanol, prepare glue UHU Endfest 300 www.uhu- profishop.de/downloads/dl/file/id/190/technisches_merkblatt_uhu_plus_endfest_300.pdf, prepare tape Tape PPI 577RF (http://www.ppitapes.com/data_sheets/RD-577.pdf) Weight parts Position flex on jig (wire-bond pads touch surface of jig), vacuum on. Place tape on flex. Position bare heater on jig, vacuum on. Pick-up heater with pick-up tool. Can be place in mount. Put glue dots on flex. Remove 2nd foil from tape (min. 5 min waiting after placement) . Place heater on flex. Put weight on pick-up tool during curing. Curing (~8h), vacuum off for heater, for flex vacuum still on until curing done. Cutting of flex frame if needed for wire-bonding, alternatively keep frame. Wire-bonding. Transport. Potting Bending after cell assembly.