Activities Status and Plan for the week

Slides:



Advertisements
Similar presentations
Endcap assembly update C Buttar UK-SCT-MB RAL 2 nd Sept 04.
Advertisements

Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04.
Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 25 May 2011 Overall.
AMS-02 tracker mechanics status of construction, assembly, integration Production: - Ladder integration - Installation on planes Inner tracker assembly:
ER Bundle “final” design D. Giugni / INFN Milano D. Giugni nSQP's meeting 1.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
1 Sasha Milov DC meeting Jan 11, 2006 HBD upgrade status. Sasha Milov Jan 11, 2006.
NSQP MEETING Valery AKHNAZAROV January 20th 2011 ISP PP0 Board Bonding Procedure Type 1 Type 3 Type 4peek Type 4 Assembly Name: ISP ASM Parts.
Activities Status and Plan for the week D. Giugni / INFN Milano D. Giugni Monday Meeting
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
Update on UT cooling specifications and status of activities LHCb CO2 cooling meeting 31/8/2015 Simone Coelli For the Milano UT group INFN Milano 1 Istituto.
Congratulations on a Great 2007 Summer Here is an update on work at the MIT Campus and an outline of urgent needs.
SCT Week -CERN- September 23, Defective ASIC’s A. Ciocio - LBNL.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
r1Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling YB+2 and YB+1, extension to minus wheels and YB0, cables between UXC55 and USC55.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
NSQP X-1 ASSEMBLY Lessons learned Sébastien MICHAL January 30 rd 2012.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
ATLAS Pixel Detector September 2003 Services E. Anderssen LBNL Service Connectivity from Module to PP1b Eric Anderssen LBNL Pixel Services Meeting, CERN.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Status of NA62 straw electronics Webs Covers Services Readout.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
Activities Status and Plan for the week D. Giugni Monday Meeting
From Bare Chambers to Installable Chambers Muon Barrel Week Bologna April 11 th 2003 Alberto Benvenuti INFN Bologna.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
Oct/07/2010Pixel PP0 opto replacement issues1 1 1 PP0 Opto Replacement Issues Philippe Grenier, Martin Kocian, Dave Nelson, Marco Oriunno, Su Dong, Charlie.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
CERN, CT Workshop, ID Week, July 2 nd, 2007 Connectivity Workshop Conclusions: Lessons learned C12 Test Next future Claudia Gemme, CERN - INFN Genova Connectivity.
NSQP MEETING Valery AKHNAZAROV January 20th 2011 Laminate the NTC-HV and PS harnesses Assembly Name: PP1 Penetration Tape Parts requires:
1. Take HV harnesses with label (IHV2) and transfer on the Stacking table. 1.1 Inspect HV harnesses visually. 2.1 Insulate HV Flex with 3M™ VHB™ Tape.
Mu2e NA62 TEL62 & TDCB repairs Radiation effects in TEL62 Franco Spinella 16/12/2015.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
WP7&8 Progress Report ITS Plenary meeting, 10 June 2014 LG, PK, VM, JR.
NSQP MEETING Valery AKHNAZAROV January 20th 2011 Corrugated Panel Bonding Procedure Assembly Name: ISP Corrugated Panel ASM Parts.
ACS news RF cabling campaign: DONE Final tests cavity tuning motor (ctrl): in progress recabling software upgrade Water cooling: ADT static pressure test:
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
NSQP’s + design implications D. Giugni / INFN Milano D. Giugni nSQP's meeting 1.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
Electronics and DAQ status Frontend - covers – Preparation of the final cover version and production Design finished Mounting of RJ45 verified using selective.
DBM status and path to the prototype D. Giugni / INFN Milano D. Giugni nSQP meeting
Chiho Wang ATLAS TRT Duke University Dubna, May Barrel integration status May 24, 2005.
GLAST LAT ProjectMonthly Review, Sept 27, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Mauro Citterio - Mi meeting
STATUS OF KLOE F. Bossi KLOE GM, ROMA Nov. 13/14.
University of Wisconsin
TOTEM Electronics Status
LKr status R. Fantechi.
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Introduction Status before the 2009 run Results from the 2009 run
ERMC/RMM activities May 2017
Activities Status and Plan for the week
Beam Pipe and Service Support Structure Production Progress
Nearly the end of a long story...
Far Detector Activities Late 2017 – Early 2018
FEE Electronics progress
Gigabit Ethernet Design ECE 4006C – Spring 2003
Subsystem Mgrs F2F Meeting Calorimeter Subsystem
UK CMS Oversight Committee Mtg
PLANNED WORK for week #10 (week of Oct. 28 – Nov. 3) PROGRESS
Outer Endcap External Bus tape
CAN branch PSU – Update meeting
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
RPC Electronics Overall system diagram Current status At detector
Presentation transcript:

Activities Status and Plan for the week D. Giugni / INFN Milano Monday Meeting 2011-03-05 D. Giugni

Harnesses Stacking Status Set 1 C34 (X0) Done Set 2 No change since last week General Keep using set as Harnesses “replacement” Status All usable Harnesses “Prepared” and tested Open Issues Need several repairs. Not started yet Set 3, 4, 5, 6, 7, 8 All done except OSP LV stack Set 9 General : Set assigned to A78 ISP HV-NTC and OSP HV-NTC stacked. Need to stack the rest Need to terminate with LEMO connectors IPS-3 and OPS-5. D. Giugni Monday Meeting 2011-03-05

Mechanics and parts for soldering Stiffened and bonded PP0 boards ISP C-side: All done ISP A-Side: A34 done A12 almost done (needs to bond alu blocks) OSP: None Open issue: problem with the bonding tool. All resistors on T1 broken during . Modification of the tool is in progress. Corrugated panels: ISP: 8 out of 16 delivered OSP: None out of 16 Open issue: SLA Parts delivered on Friday!!! D. Giugni Monday Meeting 2011-03-05

To do list for the week Stacking (week goal is to finish all Sets except Set 2 and Set 9) Full speed on finishing stacking: OPS LV 3, 4, 5, 6, 7, 8 [Valery, Olga, Jan] Start repairing the Set 2 harnesses. Mount LEMO connector on ISP LV and OSP LV Set 9 (Needed by Friday) Corrugated panel bonding: URGENT!: Verify the modification on the bonding tool [Valery] URGENT!: 4 panels needed by Friday (EndOfBuisness) for A34 and A12 [Valery, Mito] Trim and prepare the SLA parts and keep bonding all the other ISP’s PP0 boards stiffening and Alu Block bonding URGENT!: Repair the T1 resistors on A3, A4, A1, A2 [Olga] URGENT!: Bond the mounting block on A2 (needed by Fri EOB) [Valery, Mito] Continue to bond (at lower priority ) the rest of the ISP A side boards. BackBone  Start C34 Backbone bonding (low priority)

To do list for the week (cont’ed) Soldering Start Soldering A34 (need to load ISP HV-NTC Set 6 on the table [Valery on Mo/Tue]) Start soldering A12 (need to load ISP HV-NTC Set 7 on the table [Valery on Mo/Tue]) Finish up ISP C56 Post Soldering Assembly Final Assembly Trial (X-1) Waiting for: info about which rows to load with the e-boards Waiting for e-boards Start designing the ER_Bundle take up at PP1 [Hans] Piping (Bg 16) URGENT!: ship the first production welding batch (25 HeX) [Michal] Qualify the new delivered fittings [Eric] Keep preparing parts for the next welding batch