Congratulations on a Great 2007 Summer Here is an update on work at the MIT Campus and an outline of urgent needs.

Similar presentations


Presentation on theme: "Congratulations on a Great 2007 Summer Here is an update on work at the MIT Campus and an outline of urgent needs."— Presentation transcript:

1 Congratulations on a Great 2007 Summer Here is an update on work at the MIT Campus and an outline of urgent needs

2 H building progress (Dorm)

3 H building progress Jeff Winston welding the metal beams on the H Building Pastor Joel and his crew assembled the main support beam and lifted the cross beams

4 H Building update The Block work on the North side of the building is nearly done Next we will put up the beams on the North side

5 Fall 2007 Security and Safety measures It is our goal to completely secure the property by the end of 2007! We will do this in four phases.

6 Phase 1 Metal Fence Construction along the North Wall Priorities: –Safe and Secure environment –Open and inviting place for ministry

7 Phase 1 Metal Fence Construction along the North Wall Each fence section costs $327.00 All 13 sections cost a total of $4,252 (including material and labor)

8 Phase 1 Metal Fence Construction along the North Wall The metal fencing will provide the necessary security! The metal fencing will allow for a transparent and inviting ministry environment

9 Phase 2 Metal Gate North Wall main entrance The main gate will be built to last! Two 15’ wide by 8’ high gates will span the 30’ opening 4” steel gate posts, Solid steel beams Built to take abuse even from a 15 passenger van!

10 Phase 2 Metal Gate North Wall main entrance $710 USD The price for Materials and Labor for this 30 foot wide double gate!

11 Phase 3 Finish the Rest of the Block Wall We are nearly finished!!!! The block parts of the wall are 94% finished! We only need 900 more blocks to be done with the block wall FOREVER!!!

12 Phase 3 Finish the Rest of the Block Wall $1066 USD For materials and labor This includes filling in the block with cement for structural strength and replacing blocks that have fallen out

13 Phase 4 South Wall gate and metal work 13 fence sections ($327 ea) South Metal Gate ($710)

14 Totals Phase 1 –Metal fencing on North Wall = $4,252 Phase 2 –30 foot front gate (double hinged) = $710 Phase 3 –Finish ALL Block work on Wall = $1066 Phase 4 –Finish South Wall (gate / sections)= $4,962 Total = $10,992