Multi-state Corridor Pooled Fund Program

Slides:



Advertisements
Similar presentations
Planning Collaborative Spaces in Libraries
Advertisements

UCSC History. UCSC: A brief history 60s University Placement Committee A lot of field trips/interaction with employers.
St. Croix River Crossing Project Public Information Meeting
Intelligent Transportation Systems GDOT ITS Concept of Operations Presentation to ITS GA June 28, 2007.
Web Portal Governance Roles and Responsibilities.
Peggi Knight.   An AASHTO program administered by FHWA  Allows interested agencies to partner on studies of mutual interest  Sponsored/led by either.
1 ITRC Mission ITRC is A state-led coalition working together with industry and stakeholders to achieve regulatory acceptance of environmental technologies.
Operations / ITS Provisions in SAFETEA-LU What’s in There and What’s Not Jeff Lindley Operations / ITS Discipline Meeting August 16, 2005.
School Technology Solutions, LLC Technology Audits What's in it for you? 4 th Annual SW/WC Technology Conference March 11, 2010 Presenter: Lee Whitcraft.
THE HR APPRENTICERICHMOND THE HR APPRENTICE RICHMOND Marvelous Membership Mavericks.
PROJECT DESCRIPTION BORDER WAIT TIME WORKING GROUP.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
C Coaching for Performance E.S. Tunis and Associates Inc. Welcome to ESTA’s learning design workshop. The ideas developed in this workshop will set the.
1 Community-Based Care Readiness Assessment and Peer Review Team Procedures Overview Guide Department of Children and Families And Florida Mental Health.
IntelliDrive SM Strategic Plan 2009 Ted Trepanier SSOM – SCOTE Manchester The IntelliDrive SM logo is a service mark of the U.S. Department of Transportation.
United We Ride: Where are we Going? December 11, 2013 Rik Opstelten United We Ride Program Analyst.
Getting Started Conservation Coaches Network New Coach Training.
Talking Technology & Transportation (T3) Webinar July 25, 2007.
Proposal to Establish the Transportation/Land Use Connection Program Ronald F. Kirby Director of Transportation Planning October 18, 2006 Item 14.
1 Operations Academy Senior Management Program Next Offering September 16-26, 2008.
Guidance and Support of ITS Programs Michael Freitas May 2000 US Department of Transportation Federal Highway Administration.
Working Smart for the Customer’s Benefit Pam Hutton AASHTO SHRP2 Implementation Manager June 11, 2013.
MATOC Trial Phase Dec 2008 to Jun 2009 Presentation to the Transportation Planning Board Richard W. Steeg, PE Chair MATOC Steering Committee VDOT Regional.
Projects of National and Regional Significance Program.
Implementation: Results from the Using Your Regional ITS Architecture Peer Exchange Network Workshop Mac Lister FHWA Resource Center ITS America Annual.
Systems Engineering “Understanding Where it Fits in Your Agency” a session in fhwa’s Systems Engineering t3 series aug. 02, 2007.
Regional Concept for Transportation Operations: An action plan to address transportation operations in Southeast Michigan Talking Technology & Transportation.
Regional Action Plan for Sustainable Transport of Dangerous Goods along the Mekong River Final Regional Workshop, October 2014 Bangkok, Thailand.
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
1 Perspectives on Collaboration Presentation to Travel Demand Modelling in the GTHA Organizational Structure and Regional Collaboration Systems Analysis.
Multistate Research Program Roles & Responsibilities Eric Young SAAESD Meeting Corpus Christi, TX April 3-6, 2005.
Border Technology Update BORDER INFORMATION FLOW ARCHITECTURE WORKING GROUP Presented to Transportation Border Working Group (TBWG) 29 April 03 Washington,
For Presentation at 28 th APEC Transportation Working Group Meeting Vancouver, Canada Walter Kulyk Director, Office of Mobility Innovation Federal Transit.
Washington Traffic Records Committee Creating & Coordinating a Shared Vision for Traffic Records 2006 Traffic Records Forum August 1, 2006.
1 Operations Academy Senior Management Program Next Offering October 18-28, 2016.
1 Briefing on the TPB Transportation Planning Process Certification Summary Report Sandra Jackson Federal Highway Administration Transportation Planning.
Managing Multiple Projects Steve Westerman California Department of Motor Vehicles Steve Young Mathtech, Inc.
Update to Nairobi Convention Partnerships Workshop on support from IOC to the WIOCC Mahé, Seychelles – 19 June 2015.
Preliminary Assessment Tribal Emergency Response Preparedness
Dutchess Community College Middle States Self-Study 2015
ITS Session TBWG, Boston, April 13-14, 2010
WECC MAC Committee Update
Project Overview – Phase 1
Task Force Activities We are working together on a new approach that identifies sources of PCBs and dioxins, directly applies a plan for reduction and.
University Career Services Committee
IT Governance at the SCO
Identify the Risk of Not Doing BA
SHRP 2 Organizing for Reliability: Regional Perspective
Item #8 Metropolitan Area Transportation Operations Coordination (MATOC) Program TPB Planning and Implementation Briefing May 21, 2008 Richard W Steeg,
Vehicle to Infrastructure Deployment Coalition (V2I DC) & SPaT Challenge Overview January 8, 2017.
DOE Nuclear Safety Research and Development Program
Using State Pooled Funds to Support TRB Conferences
2 Selecting a Healthcare Information System.
Implementing the Transportation/Land Use Connection Program
Loddon Campaspe Integrated Transport Strategy
Health Resources and Services Administration (HRSA)
Research Program Strategic Plan
Considerations in Engineering
Support for the AASHTO Committee on Planning (COP) and its Subcommittees in Responding to the AASHTO Strategic Plan Prepared for NCHRP 8-36, TASK 138.
The Organizational Context
By Jeff Burklo, Director
Catalyst Fund - advancing global science partnerships for New Zealand
Loddon Campaspe Integrated Transport Strategy
Coordinating Operational Oceanography and Marine Meteorology
CFA Victoria 2008 Strategic Plan 2/16/2019.
Intersection Conflict Warning Systems
Independent Expert Program Review (IEPR)
Advocacy Strategies for New CAN Coordinators
RCA Workshop on RCARO Future Strategies July 2007
SADC TFCA Network – an overview Tawanda Gotosa – TFCA Technical Adviser SADC Secretariat.
Presentation transcript:

Multi-state Corridor Pooled Fund Program North/West Passage Multi-state Corridor Pooled Fund Program Bill Legg State ITS Operations Engineer Washington State Department of Transportation

Background Brings together the 8 states along I-90/I-94; Washington to Wisconsin. TPF formally established in 2003. Program was phased in. Minnesota is the administrative state.

Background Program Goals: Integrate traveler information systems that can provide information appropriate to the location and need of the traveler. Develop and promote cross-border jurisdictional cooperation and coordination in the planning, deployment, operations, and maintenance of ITS infrastructure. Integrate ITS projects for the N/W Passage Corridor into the state, regional, and local planning and programming processes.

Phase 1: Limited Focus Initial “Startup” Phase (Work Plan 1) : March 2004 to March 2006 Three States: ND, MN and WI $100,000 committed by states for work. Program focused on: Moving forward with projects that had tangible and immediate benefits to demonstrate the value of the corridor approach and had value for the participating states. Continued engagement all the states along the corridor.

Phase 1 Results Accomplishments of the Initial Phase: Integrated the incident and condition reporting systems for ND, SD, and MN. Travelers can now receive multistate traveler information via their 511. Conducted demonstration of traveler information system for Wisconsin State Patrol. Developed integrated communications capabilities for DMS at the MN-ND border.

More Phase 1 Results Accomplishments of the Initial Phase: Developed communications plan and preliminary system design for shared bridge deck anti-icing system on the I-94/Red River bridge between MN and ND. Initiated discussion between MN & WI regarding sharing traveler information at the I-90/I-94 Tomah Split. Developed program website to share information: www.nwpassage.info

Phase 2: Current Program Phase 2 represents the program as it is currently structured and covers the program efforts from 2006 to now. Includes all 8 states in the corridor. Encompasses: Work Plan 2: 2007: Program Strategic Plan Work Plan 3: 2008: Projects; all complete Work Plan 4: 2009: Projects underway Work Plan 5: 2010: Will be finalized in March Reports on all Work Plan projects are available at the program website

Plan can be found at the program website Work Plan 2: 2007 Initial Phase 2 Effort - Work Plan 2 Developed a Program ITS Strategic Plan Inventoried ITS infrastructure, systems, and efforts within the corridor. Identified issues, problems, and needs. Developed program vision, goals, and objectives. Competed a high level corridor ITS architecture Developed an initial list of recommended projects for the group to investigate Plan can be found at the program website

Work Plan 3: 2008 Traveler Information Projects: Corridor-wide Consistent Major Event Descriptions. Clarus Regional Demonstration ConOps. Member state workshop on CAD to Reporting System Integration. N/W Corridor Travel Information Website: Operations & Maintenance Projects: Member state workshop on Cross Border O&M Collaboration. www.i90i94travelinfo.com

Work Plan 4: 2009 Projects as Prioritized by Committee: N/W Passage Travel Info Website-Phase 2 Call Forwarding & Evaluation of Cross Border Information Requests Center-to-Center Communications ConOps Corridor-Wide Oversize/Overweight Permitting Expanded Corridor-Wide Truck Parking Facilities Consistent & Coordinated DMS Use Marketing & Outreach to CVOs Facilitating Use of Open Source Software Maintenance Decision Support Assessment

Work Plan 4: 2009 Projects as Selected for Work Plan 4: 4.1: Traveler Website & 4.3: Phase 2 & C-to-C ConOps - combined as one project. Includes evaluation of current website. (underway) 4.2: Call Forwarding & Cross Border Info Requests (complete) 4.4: N/W Passage Regional Commercial Vehicle Permitting (underway) 4.5: Traveler Information Dissemination to Truckers - Refinement of the Truck Parking Project. (underway)

Work Plan 5: 2010 Work Plan 5 development is underway: Solicit Steering Committee members for ideas: Review past work, past proposed projects, and the projects recommended by the Strategic Plan. Look at trends and issues nationally. Identify state specific needs. Management consultant helps fully develop ideas as needed. Ideas are discussed during conference calls. Currently have 12 potential projects. Final work plan will be determined at annual meeting in March.

Both brochures are available at the Program Website Other Program Efforts Outreach material Developed a corridor wide 511 travel information brochure: Explains 511, the corridor travel info website, and provides “back door” numbers to all the state’s 511 systems. Developed a program brochure: Explains the program, its members, & its goals. Developed a proposal to FHWA for 511 system integration across the corridor. Both brochures are available at the Program Website

Program Formalities Organization Charter covers: Steering Committee structure & responsibilities Program Administration Operating Rules covers: Voting procedures, contracting, and travel Interagency Agreements with administrative state defines: Agencies’ responsibilities and funding

More Program Formalities Meeting Structure: Steering Committee & Program Chair Monthly conference calls & annual meeting Program Management/Technical Consultant: Handles meeting logistics & program website Produces the Work Plan Document Provides some project support, Provides program reporting Contracted by the administrative state

Project Process A Steering Committee member is assigned as Project Champion who: Is responsible for delivering the project. On time/on budget Develops a project review team. Determines contracting needs, 2 options: Consultant & contractor services for projects contracted & co-managed with the administrative state. Technical/management consultant Coordinates with and reports to the Steering Committee.

Yearly Program Funding Income: Minimum $25K/member/year, some states contribute more SPR funds & some state funds Minor contributions from other sources Peer-To-Peer program Expenses: Travel/Meetings: ~$10K Website maintenance (2 sites): $10K Management/Technical Consultant: $25K Projects: Balance of budget

My Perspective Program Board/Steering Committee: The group needs to be regularly engaged Face-to-face meetings are a must Members need to be: Committed to the program Informed about related agency activities Willing to put in the time needed to make the program work The knowledge of the members will bias the program

More Perspective Program Details: The management/technical consultant: Needs to be technically strong in the focus of the program Should not have exclusive access to the project support work the program will need The program lead/chair should not be the program administrator Publicizing the value and success of the program is an important and ongoing challenge

Final Thoughts This is important work Stay focused on your program goals Don’t get too bogged down in process You will not have enough money

N/W Passage Program Chair Bill Legg WSDOT 360-705-7994 leggb@wsdot.wa.gov