1 R2CTPO ITS Master Plan Phase 1 CAC/TCC and TPO Board June 21 and 22, 2016

2 Project Overview – Phase 1

3 Project Overview – Phase 1
Determine ITS Vision, Goals, Objectives Research, document, and summarize relevant Visions, Goals, and Objectives in existing plans TASK 2 TASK Inventory and Document Existing and Planned ITS Elements and Relationships Collect and describe existing and planned ITS infrastructure Document flow of traffic and incident information 3 Identify and Assess Transportation-Related Focus Topics Identify current and future issues to benefit from ITS projects/strategies Stakeholder interviews TASK 4 Scope Effort to Complete ITS Master Plan Phase 2 (and beyond) TASK

4 Stakeholder Interviews
Project Timeline MAR APR MAY JUN MAR 23 TPO Board Approval of Study APR 28 ITS Technical Advisory Committee (TAC) meeting Stakeholder Interviews JUN 8 ITS TAC meeting DRAFT Issues Executive Summary Finalize Phase 1

5 Vision, Goals & Objectives

6 R2CTPO ITS Master Plan Vision
“Improve safety; facilitate the movement of goods and people; and enhance the transportation system’s efficiency, sustainability, and reliability through deployment of advanced technology and interagency coordination to maximize the transportation system’s utilization.” 2 parts what we want to do with ITS and then how

7 R2CTPO ITS Master Plan Goals
Improve safety and security for all modes Provide real-time and accurate user information to make informed travel decisions Facilitate the efficient movement of goods and people Preserve and enhance access to multimodal choices and facilitate connections Integrate ITS projects with local and regional partner agencies and build on existing efforts Protect the environment by improving efficiency and reducing congestion and emissions with technology Collect, monitor, and report transportation data to support informed transportation policy decisions Support economic development is LRTP Goal #2 “Goal 2: Support Economic Development” Objective 2.2 ‐ Freight Movement Identify and support safe and efficient truck routes and other facilities that improve freight and goods movement. Objective 2.3 ‐ Access to Intermodal Facilities Improve connectivity and access to rail, port and airport facilities. Objective 2.4 ‐ Transit Access to Employment Support funding of transit service that improves access to employment centers.

8 Inventory and Document Existing and Planned ITS Elements and Relationships

9 Existing Conditions Data Collection Overview
Leverage FDOT District Five ITS Masterplan Data Focus on entities operating, administering, and maintaining ITS or signalization infrastructure Interagency communications Infrastructure Elements Traffic signal inventory Fiber optic communication networks Dynamic message sign inventory CCTV locations Traffic management centers System adaptability (i.e. signal compatibility with ITS technologies) Transit routes including Sunrail

10 Identify and Assess Transportation-Related Focus Topics – Stakeholder Interviews

11 Stakeholder Interviews
IN PERSON TELECONFERENCE FDOT District Five Volusia County Flagler County City of Daytona Beach City of Palm Coast Flagler County Sheriff’s Office SunRail Florida Highway Patrol Volusia County Sheriff’s Office

12 Common Issues Identified
Interagency communication and transparency is lacking or inflexible Limited ability to directly access/monitor video feeds from other agencies Varying stages of current ITS deployment and technologies Palm Coast system in its infancy Daytona Beach system is well established Special events and beaches present issues unique to Volusia and Flagler Counties

13 Common Issues Identified
Lack of available data Information on travel conditions for before and after studies Unable to conduct corridor or system-wide reporting. Varying asset management programs Routine recurring ITS maintenance plan vs response-driven maintenance Maintenance of traffic inefficiencies Work zones Incidents/crash response inefficiencies Technically-skilled staff availability

14 Phase 2 Scoping Elements

15 Phase 2 Scoping Elements
1 Review Phase 1 – any changes/updates required? 2 Determine current and future ITS needs reflecting the goals and objectives 3 Identify candidate ITS projects and/or strategies that will: Address the identified ITS needs Contribute to a cooperatively managed, integrated ITS program Yield significant safety, security, and operational benefits in a cost-effective manner Conform to national, statewide, and regional ITS architectures 4 Recommend an implementation strategy addressing: Project prioritization Agency responsibilities Staffing requirements Interagency agreements Potential funding sources Continual operations and maintenance

16 Adam Burghdoff – Consultant Project Manager
Project Contact Information Bob Keeth - R2CTPO Project Manager or ext Adam Burghdoff – Consultant Project Manager or