Author: NG ETR team Last Updated: 30-Oct-2014 (V0.2)

Slides:



Advertisements
Similar presentations
RBA Securitisation System Technical Delivery Forum Thursday, 29 January 2015 RBA Securitisation System.
Advertisements

Overtime Air Request Website (CWEB). Itinerary for this session: Sign In View Past overtime air requests history View Current overtime air requests View.
Author Instructions How to upload a full session proposal with abstracts – two step process.
Information for students. August 2007 Welcome to the S 3 P system. Use your normal login for University systems – and the password that you were sent by.
1 of 6 Parts of Your Notebook Below is a graphic overview of the different parts of a OneNote 2007 notebook. Microsoft ® OneNote ® 2007 notebooks are digital.
Office of Information Technology (OIT) PROJECT INITIATION DOCUMENTS - BUSINESS CASE, ALTERNATIVE ANALYSIS AND STATEMENT OF WORK (SOW)
© Affiliated Computer Services, Inc. (ACS) 2010 ACS Encryption.
CS105 Lab 1 – Introduction Section: ??? TA: ??? ??? Announcements CITES Accounts Compass Netfiles Other Administrative Information CS105 Fall
Division of AIDS Data Interchange. Division of AIDS Data Interchange Agenda.
Lead Management Tool Partner User Guide March 15, 2013
1 “Data Enquiry Service” Update 5 December 2011 (by )
Lead from the front Texas Nodal 1 EDS 4 Release 9.1 DAM/RUC/SASM Market Call January 11, 2008.
1 TOWER CONSTRUCTION NOTIFICATION SYSTEM ENHANCEMENTS March 30, :00 PM Room 6-B516 of the Portals II Building 445 Twelfth Street, SW Washington,
Online Submission and Management Information -- Authors AMS Annual Conference / AMS WMC Click on play to begin show.
3M Partners and Suppliers Click to edit Master title style USER GUIDE Supplier eInvoicing USER GUIDE The 3M beX environment: Day-to-day use.
Collecting Copyright Transfers and Disclosures via Editorial Manager™ -- Editorial Office Guide 2015.
Page ADP PearsonAccess Proctor Training. Page Agenda Test Overview Testing Components Proctor Roles and Responsibilities Overview Administering the Test.
Packaging and Distribution Presentation Module 2 Material Overview.
REGISTRATION & ACCESS Frequently Asked Questions March 2016.
Campus wide Ticketing Tool for UC Berkeley
Online Submission and Management Information -- Authors
SchoolSuccess for Coordinators
OASIS Next Generation Project Summary
Preparing for your visa application
Food Suppliers Implementation of EDI &PAV March 2010
Blackboard Assignments & Feedback Rubrics
Compatible with the latest browsers; Chrome, Safari, Firefox, Opera and Internet Explorer 9 and above.
StudentTranscripts Service Overview
Author: NG ETR team Last Updated: 03-Nov-2014 (V0.1)
ELECTRONIC PROPOSAL SUBMISSION SYSTEM
IPOM and E-Booking.
Intracompany Stock Transfer Scenario Overview
School/Unit Representatives Meeting September 2016
Welcome to the Nevada Test Administration Training and Q&A Session
CPOC-SFDC Scheduling Training Guide
Intracompany Stock Transfer Scenario Overview
Texas Instruments Supplier Portal- Web Invoice Overview
StudentTranscripts Service Overview
Briefing Session Guide
StudentTranscripts Service Overview
Student Worker Supervisor Self Service Time Approval Guide
Investing in good health at work
Unit4 Customer Portal Submitting & Managing Cases.
Unit4 Partner Portal for Case Creator
ICOTS Helpdesk Training
Author: NG ETR team Last Updated: 04-Dec-2014 (V0.1)
NHS e-Referral Service (e-RS)
ENTSO-E Transparency Platform Vision Project
NORTHEASTERNERS, INC. IRS 990 filing instructions presentation
StudentTranscripts Service Overview
Intracompany Stock Transfer Scenario Overview
Agenda Action Review Update on IX and iGT access Testing strategy
StudentTranscripts Service Overview
Manual for Supplier Registration
Road Manager Module National Heavy Vehicle Regulator
Gateway Approval – a guide v1.0
StudentTranscripts Service Overview
Managing Sessions in PearsonAccessnext
COLLECT – Spring 2019.
Queries raised regarding use of SOLAR
Managing Sessions in PearsonAccessnext
Wells Fargo Toolkit – CreativeBuilder Reference Guide
CONVERCENT INCIDENT REPORTING Employee Training
New Client On-boarding Process
Scheme for Growth Pilot
Multi-Sector General Permit: MSGP
CFR Enhancement Session
Curricular Practical Training
Organizer Preparation for on-site Execution
Presentation transcript:

Author: NG ETR team Last Updated: 30-Oct-2014 (V0.2) European Transparency Regulation (ETR / ERGEG) – Industry briefing (30-Oct-2014 session) – tcon Author: NG ETR team Last Updated: 30-Oct-2014 (V0.2) ETR Industry briefing v0.2 (30-Oct-14)

ETR Industry briefing v0.2 (30-Oct-14) Some ground rules Login to the “live meeting” session as “name (company)”. For example: Melanie (NG) Do not use the “live meeting” audio. Please dial in separately using the conference details in the appointment. When you have a query, use the dialog box to raise your hand. The presenter will stop at the appropriate moment and ask the person to speak. When speaking, please announce yourself “name (company)”. Sorry for this. Due to the expected large number of attendees, it is essential to follow this. ETR Industry briefing v0.2 (30-Oct-14) ETR Industry briefing v0.2 (30-Oct-14)

ETR Industry briefing v0.2 (30-Oct-14) Agenda Stats on MP submission methods Proposed MODIS Design Change on Ack/Nack discussion Testing update Update on key MP queries Looking ahead Any other business ETR Industry briefing v0.2 (30-Oct-14)

Stats on MP submission methods (as at 29-Oct-14) Access method Number of EIC Parties chosen the method sFTP 24 Login to submit report or to enter data 6 Web services over internet 2 Web services over leased lines 4 Unknown / NA / Not responded 21 Notes: Total of 53 EIC parties. 1 EIC party has selected “all methods”. 1 EIC party has selected 2 separate methods. Some EIC parties selected “web services over leased lines” method have also indicated their preferred alternative methods of either “sFTP” or “Login”. This is not included in the above stats. ETR Industry briefing v0.2 (30-Oct-14)

Proposed Design change for Ack/Nack (return messages) NG assessment completed. Proposal attached below: In summary: Propose that MPs to fetch Ack/NAck (return) message from NG. Due to short notice of the change, NG will provide support to send Ack/NAck to MPs post ETR go-live until the end of February 2015. ETR Industry briefing v0.2 (30-Oct-14)

ETR Industry briefing v0.1b (30-Oct-14) Testing update MODIS being tested internally Network for sFTP is ready and currently being tested by early adopter MPs MP sample files are being processed manually ELEXON providing support for sample file testing ETR Industry briefing v0.1b (30-Oct-14) 6

Update on key MP queries so far (1) Taking note of the recent feedback, Isaac Wilks has been appointed as the ETR project Communication officer. The contact email address to use is .box.ETR_project@nationalgrid.com Responsibilities: Be the single point of contact for external stakeholders. Monitor ETR project email for queries via the box email (.box.ETR_project@nationalgrid.com) Log, assign, chase and close out queries Bring common queries (and associated response) to MP t-cons to share Note: All ETR testing related queries will now go to the ETR project email, but can be copied to the ETR Test email (IS.IntegrationTesting@nationalgrid.com). ETR Industry briefing v0.2 (30-Oct-14)

Update on key MP queries so far (2) Stats gathered since inception (20-Oct-14) as at 28-Oct-14: 11 queries raised, 5 closed. Key queries and responses: Which of my EDT lines can I use to submit data down? For those with multiple EDT lines with NG, technically any line. However, we need to know the specific IP address you intend to use so that we can ensure data traffic can come through to MODIS. What is the Registered Capacity of my BMUs for the purpose of ETR reporting? If you need this, then please send request to NG ETR box email. What is the status of the sample files that I sent you? ETR Industry briefing v0.2 (30-Oct-14)

ETR Industry briefing v0.2 (30-Oct-14) Looking ahead Due to additional technical issues at the current time the “web services” interface is unlikely to be ready for ETR go-live A separate development has initiated a contingency solution. This solution requires MPs to: Send their reports to NG via the sFTP route ETR Industry briefing v0.2 (30-Oct-14)

ETR Industry briefing v0.2 (30-Oct-14) Looking ahead Continuing: Process MP sample reports onto ENTSOe platform via Elexon and provide feedback to MPs. TBC: Release of MODIS to allow external user access. w/c 01/12/14 (was 18/11): MODIS system rollout to Production. Note that Elexon system will not be available in the first 2 weeks of December 2014 to prepare for system go-live on 16/12/14. 16/12/14 to 04/01/15: Day 1 data load period to be organised in batches. Key risk(s) and issue(s): Risk: Unable to provide external users access to MODIS due to technical difficulties in integrating NG security layer with the MODIS application Mitigation: Alternative method being investigated. Initial testing expected Friday (31/10). Risk: Unable to provide feedback on MP sample reports Mitigation: Use of manual flow (via email) to NG Teat team. This is now possible since 17/10 when the pre-reg Master config file was successfully loaded in EMFIP (data used is aligned with LIO spreadsheet with a few exceptions). Risk: MODIS not ready in time for go-live Mitigation: Contingency plan being drawn up. Contingency solution requires MPs to submit reports via sFTP route. ETR Industry briefing v0.2 (30-Oct-14)

Updates on key actions: 1) Day 1 data preparation – When to submit the pre-reg Master config file relating to Company and BMUs? 23/10 Update: EMFIP indicated that pre-reg Master config data will be copied from current EMFIP Test platform. 2) Day 1 data preparation – When to submit the 3 years worth of data? 23/10 Update: Regulation seems to indicate “upto to 3 years of data”. Need to confirm this understanding amongst GB industry. Need to understand how much data the MP is planning to submit prior to go-live. 3) Confirm MODIS Design change on method of delivery of Ack/Nack messages to MPs. ETR Industry briefing v0.2 (30-Oct-14)

End Last slide