News about the WA104 Programme

Slides:



Advertisements
Similar presentations
Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.
Advertisements

January 6. January 7 January 8 January 9 January 10.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
Spectrometer Solenoid Testing Update S. Virostek and M. Zisman Lawrence Berkeley National Laboratory MICO Meeting—RAL May 17, 2010.
LAr ROD Status Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Laurent, Eric, Jean-Pierre, Gilbert,... ATLAS Geneva DPNC January 12 th, 2005.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
Compressor status AWAKE Technical Board meeting 19 May 2015.
Survey of cathode deformations and further actions F. Vercellati – INFN-PV C. Montanari – CERN / INFN-PV weekly meeting, March 12,
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
MICE Coupling Coil Update Steve Virostek for Allan DeMello Lawrence Berkeley National Laboratory MICO January 23, 2013 January 23, 2013.
STATUS OF THE MEG CRYOSTAT Construction status Schedule ____________________________________________________________ 04/Agust/06 F. Raffaelli, L. Delfrate.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
UPDATE ON THE CRYOSTAT DESIGN AND INSTALLATION SEQUENCE.
Compressor status AWAKE Technical Board meeting 19 August 2015.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Space, labs & testing equipment Paolo Petagna Meeting on CO 2 Cooling CERN 04 February 2015.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Summary of the WA104, T600 overhauling programme C. Montanari – INFN-PV, Italy M. Nessi – CERN, Switzerland weekly meeting, December 18,
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
LASA Medium-β Cavity Progress Update Paolo Michelato 2 nd ESS Collaboration Meeting - SRF Elliptical Cavities 15 th December 2015.
LAr Week Feb 2000 M. Lefebvre Milestones and Schedule General Production Readiness Review  Passed in Jan 99 Leak Test Station and Electric Test.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
TBTS Test Program & Schedule G. Riddone
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
Concept Design for LBNF Far detector (LAr single phase)
Installation of the T600 at Fermilab CSN2, September 22,
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 11 December 2012 LAV construction & installation status.
Increase of the T600 maximum drift distance and preliminary considerations for larger aluminum vessels Claudio Montanari INFN-Pavia, Italy 1ICARUS Meeting.
AMS Tracker Meeting17/10/05 Eric Perrin (GE) Tracker mechanics at Uni -Ge Safety issues Assembly Still to be made.
2010/12/14 Caltech Massimo Benettoni FDIRC FBox (almost) ready for production Box design finalized (as possible) Gives precise Fblock positioning wrt guiding.
Fernanda G. Garcia, Steve Dixon, Andy Stefanik, Justin Tillman, John Voirin SBN Far Detector Installation & Integration.
Tracker cooling plant refurbishment Project status Revised plan Financial impact.
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN PS/SPD LED monitoring system status In December 2005: –All splitters and drivers are delivered.
Installation of the T600 at Fermilab Fermilab, February 15,
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 5 January 2013 LAV construction & installation status.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
Neutrino Platform Proximity Cryogenics 59th EHN1 Cryogenics Integration Redouan Abdennour, Johan Bremer, Michel Chalifour, Joaquim Creus, Aurelien Diaz,
Teleconf ACS – FREIA 28th March 2017
Installation of the T600 at Fermilab
Completion of the MICE-US construction project
LAPP BPM Read-out Electronics
LIU Wire Scanner Milestones June 2017
LEP cryostat Procurement strategy and plans
HF Test station at P5 A.Mestvirishvili.
Teleconference ACS – FREIA 18th April 2017
Teleconference ACS – FREIA 10th May 2017
Mini-drawers, FE-ASIC , Integrator
ELENA electron cooler and SEM grids status
Renovation of the 45-year old PS magnets
EHN1 Neutrino Installation Plans
Far Detector Activities Late 2017 – Early 2018
Parts exchange for HL-LHC AUP Q1&Q3
UK RFD Pre-Series cryomodule
Teleconference ACS – FREIA 20th February 2018
BLM planning 24/02/2014.
LS1 status 24/03/2014.
Undulator Vacuum System
LS1 status 17/03/2014.
Injector / Linac Installation Current Status
Prototype cryomodule development
Undulator Vacuum System
Teleconference ACS – FREIA 19th June 2017
UPPSALA UNIVERSITY_GERSEMI PROJECT
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Presentation transcript:

News about the WA104 Programme C. Montanari – INFN and CERN WA104@CERN technical working group meeting, February 1, 2017

Recent news The activities on the second T300 module started on January 13, 2017. The cathode has been removed. Flattening operations started and are expected to be completed by end of next week (by February 10, 2017). Additional 2 weeks are needed for polishing and electro-polishing. The cathode panels are expected to be back for re-installation at the end of February 2017. Re-installation is expected to be completed by first week of March. All old cables and PMTs have been removed. The new mechanical components for about 100 PMTs have already been cleaned and preassembled. All PMTs cables will be ready for installation (tested and cleaned) tomorrow. We expect to complete the assembly of the new PMTs by end of this month (February 2017). The already pre-assembled decoupling boards are in Padova for reconditioning. The decoupling boards that have not been pre-assembled are under test (see A. Braggiotti presentation). A decision on how to proceed will be taken this Friday (February 3, 2017). The installation of the new cables for the wires will take place during the last week of February. WA104@CERN technical working group meeting, February 1, 2017

Recent news The cold vessel with the first T300 module will be taken to B191 during the next week. The fixings for the external supports will be machined (by February 10) A test will be done on the possibility to install the decoupling boards from the flanges on the top (by February 14) A second vacuum test will be done during the first week of March. Assembly of the second cold vessel is proceeding according to the schedule. Vacuum tightness tests on the first door will be done tomorrow. At the beginning of the next week a meeting will take place in Padova dedicated to the verification of the electrical equipment to be installed at Fermilab. A visit at Fermilab will be planned to take place before end of February for updates on discussions on installation. Our Technical Working Group Meeting, from now on, will take place every two weeks. WA104@CERN technical working group meeting, February 1, 2017