LCWS11 AWG9 PARALLEL SESSION SUMMARY

Slides:



Advertisements
Similar presentations
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Advertisements

Nov. 19, 2008 ILC08 Global Design Effort 1 Status Report Alternative Siting and Tunnel Design Tom Lackowski.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas Tunnel Life Safety and Egress Accelerator.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
CONVENTIONAL ELECTRICAL TDR DESIGN Randy Wielgos March 22, 2012 ILC CFS Baseline Technical Review.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
Global Design Effort - CFS SiD Collaboration Meeting - SLAC 1 VERTICAL ACCESS ILC IR LAYOUT for SiD and ILD CONVENTIONAL FACILITIES AND SITING.
LCWS14 - Belgrade October 6-10, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, M Miyahara, J Osborne.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas CFS AD&I Status Report Conventional.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
Summary of TDR Cost Reviews at KILC-12 G. Dugan KILC-12 4/26/12.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Global Design Effort - CFS Accelerator Advisory Panel Review - Oxford UK 1 ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES AND SITING.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
Global Design Effort - CFS AD & I Meeting - DESY AD & I Meeting - DESY 1 AD&I Meeting CONVENTIONAL FACILITIES AND SITING GROUP Main Linac Tunnel.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Conventional Facilities and Siting GG Global Design Effort BILCW 07 - Beijing1 Conventional Facilities and Siting Global Group Summary Report.
Global Design Effort - CFS ILC Source/RTML/BDS + MDI Technical Baseline Review October ILC SOURCES/RTML/BDS + MDI TECHNICAL BASELINE.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.
Global Design Effort Working Groups A & C Parallel Session Summary IRENG07 A. Herve, T. Markiewicz, T. Sanuki, Y. Sugimoto V. Kuchler, A. Enomoto, J. Osborne.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
SCRF Monthly WebEx Meeting March 9, Report from PMs (15 min.) 1.Acknowledgements for completing S1-Global cold/RF test (A. Y.) 2.GDE meeting plan.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP IWLC10.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
Baseline Technical Review – Central Region Accelerator Systems
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Conventional Facilities and Siting Global Group (ARCFS)
Conventional Facility & Siting (CF&S) Overview for the Positron Source
Introduction and Meeting Objectives
Marco Oriunno (SLAC), March 12, 2014 MDI WG
Americas KlyCluster Cost Analysis Overview
CONVENTIONAL FACILITIES presented by Peter H. Garbincius
ILC DRAFT CONSTRUCTION SCHEDULE Flat topography & Mountainous sites
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
Yamamoto WG3: ML-SCRF Parallel Session,
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
CLIC/ILC Collaboration Meeting: Objectives & Organization
Tom Lackowski Revised 10/12/2011
Yasuhiro Okada, Executive Director, KEK
Overview of Day One – 29 Feb 2016
Barry Barish Paris ICHEP 24-July-10
Presentation transcript:

LCWS11 AWG9 PARALLEL SESSION SUMMARY CONVENTIONAL FACILITIES AND SITING V. Kuchler, J. Osborne, A. Enomoto

Parallel Sessions - September 27 am Joint Session - Sources, DR, RTML and BDS Several Talks were Presented from Area Systems and CFS Reviewed Status of Lattice Development for the Central Region A Draft Lattice for the Central Region will be Available for the Baseline Technical Review at DESY in Late October, 2011 Final Central Region Lattices are Expected to be Completed by the End of 2011 Naming Conventions for the Technical Components will be Mapped to the Naming Conventions for the Conventional Facility Enclosures CFS will Work with B. List to Identify “Treaty Points” Between Adjacent Ares Systems and Incorporate Machine Coordinate Information into CFS Drawings Current CFS Drawings and Mechanical/Electrical Criteria and Designs were Also Presented by L Hammond and R Wielgos A Few Remaining Discrepancies were Identified and will be Corrected in the CFS Information Prior to the Baseline Technical Review

Parallel Sessions - September 27 pm Stability Issues for Push/Pull Detector Movement Movement Induced into the Damping Ring from Detector Push/Pull Operations was the Main Point of Discussion Range of Allowable Movements for Damping Ring and Detectors are Available and will be Reviewed in the Coming Months European Region has Contracted ARUP-UK to Analyze the CLIC Design for the Interaction Region at CERN These Studies Include a Rock Model Analysis of the CERN Molasse Geology and Detector Platform Design for CLIC and ILC Americas Region will also Use ARUP-UK to Analyze the ILC Design for the Interaction Region at the Americas Sample Site that will Include a Study of the Push/Pull Detector Influence on the Damping Ring Enclosure

Draft Examples of ARUP Analysis

Parallel Sessions - September 27 pm CFS Cost Discussion G Dugan Provided Information Regarding Guidelines for the Development of the Cost Estimate for TDR Cost will be Based on 500 Gev Machine CFS Cost Estimating Process will Use Formatted Excel Workbooks for Upload of Data into Overall ICET Project Cost Estimate “Basis of Estimate” will be Required for all Cost Entries and Eventually Entered into the EDMS System

Parallel Sessions - September 28 am ILC/CLIC Critical Issues Overview of CLIC/ILC Draft Critical Issues Matrix was Provided by J Osborne General Discussion Provided Critique and Suggestions A Final Version of the Matrix was Completed During This Session

Parallel Sessions - September 28 am cont. Joint Session with MDI/Detectors T Lackowski - Overview of Central Region Development J Osborne - Status of ARUP Consulting Y Sugimoto – Update on Japanese Mountain Site K Riles – R&D Update for SiD Final Focus Magnet Alignment Several Different IR Layouts are Under Consideration Regional/Local Conditions will have an Impact on IR Hall Design Americas Region IR Japanese Mountain Site IR SiD IR CLIC IR

Parallel Sessions - September 28 am cont. Joint Session with MDI/Detectors Discussion Focused on Alternative IR Layout Proposed by M Oriunno Dimensions Still Need Verification by ILD “Z” Shape for IR Hall is the Consensus Shape for European and Americas Region Shaft Number, Arrangement and Locations are Still Under Consideration Overall IR Design Still Needs Review With Respect To: Detector Assembly Methods Crane Coverage Use of Platforms Detector Maintenance SiD IR

Parallel Sessions - September 28 pm TDR Preparation Primarily a CFS Working Session M Ross Joined the CFS Discussion A Draft Outline for the TDR was Developed and Provided to the Project Management Group

Parallel Sessions - September 28 pm cont. Joint Session with HLRF Klystron Cluster and Distributed RF System Criteria were Presented and Discussed in Detail Alternatives for Main Linac Shaft Locations were Also Discussed with Cyrogenic Input from T Peterson Discussion Determined that the CFS Group Now has All Necessary Information to Proceed with Mechanical and Electrical TDR Design for Both Proposed RF Systems Discussion Also Determined that Alternatives Being Considered for Cryomodule Cavity Configuration will have Only a Minor Impact on CFS Costs and Design

Parallel Sessions - September 29 am Siting Studies - Asian Region Current Progress for Asian Region Mountain Design was Presented by A Enomoto Presentation Included a Consultant Study Comparing Various Tunnel Configuration Alternatives Compatible with a Mountain Site Siting Studies – European Region J Osborne Provided an Overview of Siting Work for a Linear Collider on the CERN Site Also Included was Information Gained from the Initial Investigation of Requirements Regarding Environmental Impact Assessments in Europe M Gastal Provided an Update of Scheduling Efforts at CERN for Both the CLIC and ILC Projects A Dudarev Presented an Update of Moscow University Support that has been Provided to the LC Effort at the JINR Laboratory

Parallel Sessions - September 28 pm EDMS Documentation Primarily a CFS Working Session with B List Providing a Short Status of the EDMS System A Proposed CFS Folder Hierarchy was Discussed and Adopted A Short Review of CFS Document Types and Regional Document Lists was Also Completed The CFS Group will Work With B List to Begin to Upload CFS Documents Americas Region Mechanical and Electrical Design Development E Huedem Provided a Detailed Update of the Consultant Work to Date for the ILC Mechanical System Design for Both the KCS and DRFS Systems R Wielgos Provided a Detailed Update of the Consultant Work to Date for the ILC Electrical System Design for Both the KCS and DRFS Systems