1 Yasuhiro Okada, Executive Director, KEK
ILC Status: General Yasuhiro Okada, Executive Director, KEK 2014 Joint Workshop of the TYL/FJPPL & FKPPL Particle Physics Laboratories May 27, 2014, Bordeaux, France

2 ILC as a Global Project R&D for a future e+e- linear collider was started more then 20 years ago in three regions. By early 2000’s , it became a consensus among the world HEP community that an e+e- linear collider with the CM energy of about 500 GeV should be the next collider beyond the LHC. ICFA chose the cold technology for LC as a global project, and set up a global team (GDE) for design and coordination of R&D for the ILC.

3 TDR completed: The LCC succeeded the GDE
After eight years of works, the TDR of the ILC was published in June 2013 under the leadership of the GDE Director, Barry Barish. ICFA set up the Linear Collider Collaboration headed by Lyn Evans.

4 ILC TDR Layout e+ Main Linac Damping Rings Polarised electron source
Ring to Main Linac (RTML) (including bunch compressors) e+ Main Linac e- Main Linac Parameters Value C.M. Energy 500 GeV Peak luminosity 1.8 x1034 cm-2s-1 Beam Rep. rate 5 Hz Pulse duration 0.73 ms Average current 5.8 mA (in pulse) E gradient in SCRF acc. cavity 31.5 MV/m +/-20% Q0 = 1E10 E+ source A. Yamamoto, 2014/05/12

5 ILC Physics case is even stronger after the discovery of a Higgs particle
The Higgs particle becomes a tool to explore New Physics. July 4, 2012 Expected precision of the Higgs coupling determination Results taken from Snowmass 2013 study

6 Z’ LHC ILC ILC Various opportunities for direct and indirect
New Physics search at the IILC Z’ effect Top anomalous coupling Z’ Snowmass 2013 study Snowmass 2013 study SUSY GUT SUSY DM LHC Baer, List ILC ILC Taken from the L-T Wang’s result at AWLC14

7 ILC efforts in Japan In October 2012, after the discovery of a Higgs –like particle, the Japanese HEP community proposed a phased execution of the ILC hosted in Japan as a global project. Impacts of this statement The European Strategy for Particle Physics Update 2013: May 2013

8 AsiaHEP/ACFA statement on the ILC project: September 2013
AsiaHEP/ACFA welcomes the proposal by the Japanese HEP community for the ILC to be hosted in Japan. AsiaHEP/ACFA looks forward to a proposal from the Japanese Government to initiate the ILC project. ICFA statement on the progress towards an ILC in Japan: February 2014 US P5 report (draft) : May 2014

9 ILC Time Line: Progress and Prospect
Preparation Phase Expecting ~ (3+2) year since (middle) 2013   We are here, 2014 A. Yamamoto, 2014/05/12 AWLC14

10 ILC Status A.Suzuki, May 2014, FNAL TDR February 6, 2014 August, 2013
September 26, 2013 TDR September 28, 2013

11 MEXT Task Force Review by Science Council of Japan Review Issues
Particle・Nuclear Physics WG Academic Experts Committee TDR Validation WG February 6, 2014 May 8, 2014 TDR Validation Value Estimation for Quake-Proof Value Estimation for Environmental Improvement Total Value Estimation Clarification of ILC Physics Review Issues 2013 2014 2015 2016

12 Action Plan toward before Construction in 2014
Further Action Plan before Construction 2012 2014

13 Further Action Plan before Construction 2014 2015 2016 2017 2018
Engineering R&D Schedule (LCC-PreLab) Pre-construction Schedule (LCC-PreLab)

14 Further Action Plan before Construction 2014 2015 2016 2017 2018
Engineering R&D Schedule (LCC-PreLab) Pre-construction Schedule (LCC-PreLab) Staging Scenario (LCB, LCC) Lab Design: Organization, Structure (LCB, LCC) CERN EU XFEL Procurement Legal Base Personnel ITAR ILC ITER LCB WG (Feb. 2014~) PIP & PDG

15 Further Action Plan before Construction 2014 2015 2016 2017 2018
Governmental Negotiation Preparatory Phase Decision-Making Site-Dependent Value (LCC-LCB-PreLab) Value-Sharing Model Host Others CFS - LAND ??? % Instrument - Electricity Maintenance/Labor Detector

16 3. Summary Further Action Plan before Construction ① ② ③ ④ ⑤ ⑥ ⑦ ⑧ ⑨
Site-Dependent Value A.Suzuki, AWLC 14