EHN1 Extension planning

Slides:



Advertisements
Similar presentations
Study report on the TDC2/TCC2 Cabling and Low Voltage activities Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting
Advertisements

HiRadMat : report from WG2&3 – WANF dismantling January 15, 2010S. Evrard 1 Worksite: activities achieved or in progress WANF cleaning: status Proposal.
Wireless Remote Control & Touch Screen Modular Switches.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
SNOLAB Facility Status Fraser Duncan SNOLAB Workshop 27 August 2009.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
Construction and Installation of the CLIC Experimental Area
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
1 MICE-Video Conference Status of MICE Hall Contents: General status Electrical Mechanical Preparing for Steps II & III Risks and worries Andy Nichols,
Impact on Project Planning and Cost. Agenda CERN Project Budget Planning Summary E. Gschwendtner, 9 April
Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson 17 September 2015.
Bulding 245 schedule update LIU Booster Meeting Fulvio Boattini TE-EPC TEEPC.
Update on Module Mounting on Staves and Stavelets 25/8/11 1.
The Building 180 Cryogenic infrastructure water cooling system Status Update Stefano Moccia, EN-CV Coordination meeting 14/10/15.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Functional/Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson EN/MEF 4 November 2015.
YETS activities in n_TOF O. Aberle, S. Montesano (EN/STI)
TPC Collaboration Meeting Peter Glassel 1 Reminder on Installation Schedule (ALICE Forum June 2002)  Install Muon magnet directly into experimental.
Contributions from BE -ABP -ASR -BI -CO DG -RP EN -CV -EL -MEF -STI GS -SEM -ASE IT -CSPH -CMXTE -CRG -EPC -MPE Follow.
Safety of premises P. K. Frandsen SM 18 LHC Magnet test review 21 JUN 2005.
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
EHN1 – EN/EL Progress update J. Devine G. Gross 11/02/16.
EHN1 – EN/EL Planning Lighting _ Containment_ Cabling J. Devine G. Gross 11/02/16.
EHN1 – EN/EL Progress update J. Devine 25/02/16. Integration – Jura Substation Position updated to avoid clash with door. Meeting next week for Civil.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
Mike Andrews May 10, Week 54 NuMI Activities Initial test controls on the MI65 RAW exchange skid Complete hydrostatic test of the MI65 exchange.
Status of AWAKE Installation and Integration Presented 9/3/2016 at the AWAKE Collaboration Meeting Ans Pardons, for the AWAKE CP4 team.
Infrastructure EHN1 extension Lau Gatignon, 7 March 2016.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
ELENA installation progress F. Butin / ELENA collaboration.
Neutrino Platform Proximity Cryogenics 59th EHN1 Cryogenics Integration Redouan Abdennour, Johan Bremer, Michel Chalifour, Joaquim Creus, Aurelien Diaz,
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
East Area Renovation Project Planning activities Quentin Bouirek / EN-EA, East Hall under construction
The Next Generation of a Gamma Irradiation Facility GIF++
SPS Personnel Protection System Renovation Project
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
Neutrino Platform Proximity Cryogenics 72th EHN1 Cryogenics Integration TE-CRG
Safety in the Neutrino Platform Hall
CBETA Technical Review
VENTILATION OF AD TARGET Kick off meeting
Neutrino Platform Overall Protodune Risk Mitigation Plan O
Francois and Lau EATM 17 July 2012
EHN1 Extension North Side wall (Removal of Existing services & platforms) Michael Jeckel & Bastien Rae.
ELENA installation and commissioning status
Budget specification EHN1 Extension: Infrastructure (WG2)
Teleconference ACS – FREIA 10th May 2017
EN-CV Progress EHN1 Extension Project
CE Status: Activities executed until 03/08 and ongoing
EHN1: CE Integration process updating
News from Projects Lau Gatignon / EN-EA Input from F.Butin, Q.Bouirek
EHN1 Neutrino Installation Plans
M.Tavlet, H.Taureg - ALICE
10/month is the present production rate 2 FTE + sporadic contributions
Extension SR1 WP3 Electrical installations
East Hall under construction
East Hall under construction
East Hall under construction
Installation XFEL Tunnel WP 34
MERIT Review Meeting Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug
Hall C SHMS & Configuration Status
ODH Phase 1 Hazard Analysis, Monitor Placement, Installation Progress.
Hall C SHMS & Configuration Status
North Area Safety Review 2019
East Hall under construction
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

EHN1 Extension planning Q. Bouirek / EN-EA 08/06/2017

H4 Beam line extension works EHN1_NP H4 Beam line extension works Quay construction delayed because of the coactivity Following activities must be postponed (supports, magnets, cooling connection, alignment, containment, cabling, etc) The goal is to allow EN-EL to work from September 2017 on the magnet cabling, i.e. Finish cabling before the YETS 2017/2018. Cabling + Cable trays installation Magnet installation : 1 month Support installation : 1 week Quai installation : 2 months Temporary access to the quay will have to be built. 08-06-2017

Infrastructure : Next steps EHN1_NP Infrastructure : Next steps EL/EL Second cabling from w25 to w29 ODH clean room Fire detection NP02 clean room Cryostat doors + access doors cabling Alarms + temporary alarms removal AUG Lighting BE/ICS Access control on the external doors ASAP Pit access doors Hall separation doors Quay + detector doors Fire detection + ODH installation EN/CV RIA commissioning next week 08-06-2017

EHN1_NP Metallic Structure 08-06-2017