Presentation is loading. Please wait.

Presentation is loading. Please wait.

Infrastructure EHN1 extension Lau Gatignon, 7 March 2016.

Similar presentations


Presentation on theme: "Infrastructure EHN1 extension Lau Gatignon, 7 March 2016."— Presentation transcript:

1 Infrastructure EHN1 extension Lau Gatignon, 7 March 2016

2 News Lau Gatignon, 7-3-2016WA105 meeting2 Handover date civil engineering shifted to 16 September. A two-week period in July offered as compensation. Not obvious how to profit from this in view of legal and safety related constraints. Working on new planning and looking into the legal and safety aspects Impact on crane, protectionb of pits, access, …. MNP22 magnet can be removed when needed. Discussions under way on where to put it. Cryo has promised presentation for next week Specification of racks urgently needed. Chilled water cooling would be a major issue Cooling capacity issue for beam line magnets solved

3 Lau Gatignon, 7-3-2016WA105 meeting3

4 Civil engineering status Lau Gatignon, 7-3-2016WA105 meeting4

5 Lau Gatignon, 7-3-2016WA105 meeting5

6


Download ppt "Infrastructure EHN1 extension Lau Gatignon, 7 March 2016."

Similar presentations


Ads by Google