Information about the resort recreation area "Kenderli"

Slides:



Advertisements
Similar presentations
Mangystau Governor’s Office ECONOMIC AND INVESTMENT POTENTIAL OF THE MANGYSTAU REGION OF THE REPUBLIC OF KAZAKHSTAN.
Advertisements

INVESTMENT OPPORTUNITIES IN THE TOURISM SECTOR Presented by The Minister of State, Minister of Tourism and Leisure His Excellency BELLO BOUBA MAIGARI 1.
DECREE OF THE PRESIDENT OF UZBEKISTAN «ON ADDITIONAL MEASURES TO STIMULATE ATTRACTING FOREIGN DIRECT INVESTMENTS» ON APRIL 10, 2012 #UP-4434 Ministry for.
Free Industrial Economic Zone “Navoi” Enhanced arena for foreign business success in the region Djasur Tadjiev Head of Department for attraction of foreign.
MINISTRY OF CULTURE AND TOURISM. NEW ERA IN TOURISM WHY TURKEY ?
INITIATIVES IMPLEMENTED ON NATIONAL AND INTERNATIONAL LEVELS FOR ENERGY EFFICIENCY AND ENERGY- SAVING IMPROVEMENT VI Eurasian Energy Forum 4-6 October.
Electrical Equipment Park in in Russian Federation Russian Federation on the basis of Korean technology Project’s conception presentation Moscow Region.
There are two industrial areas :  production and development zone near Kunda port, total area 130 ha;  development zone in Tööstuse Street, total area.
Building of multifunctional geothermal rehabilitation town InterMedicalEcoCity Project goal: «InterMedicalEcoCity» - is an International Medical Rehabilitation.
Recycling plant with a sorting line and area for temporary waste storage Project idea: utilization and processing of waste Place of realization: near treatment.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Phare 2003 Sector: Economic and Social Cohesion Title: Water Supply and sewerage in tourism and resort settlements.
Community Development Department FUTURE LAND USE MAP AMENDMENT SMALL-SCALE LU-MIN & ZONING MAP AMENDMENT RZ-OTH
INDUSTRIAL PARK MISSION Industrial Park mission is to create favorable conditions for the development of small and medium-sized companies Establishing.
ECLAC HANDBOOK FOR ESTIMATING EFFECTS OF DISASTERS1 HANDBOOK FOR ESTIMATING SOCIO-ECONOMIC AND ENVIRONMENTAL EFFECTS OF DISASTERS Economic Commission for.
Center for investment projects Republican Center for Healthcare Development Astana 2015.
Ministry of Economic Development of the Russian Federation Andrey Sokolov Department of projects of regional economy development Ministry of Economic Development.
Reconstruction of coastal recreational parkland in Nova Kakhovka Project idea: landscaping of the city park along the Dnipro River (length is 1 km), development.
Development of a master plan for the restructuring of the hospital sector of the Republic of Kazakhstan Ministry of health and social development of Republic.
For a better place to live! OPERATIONAL PROGRAMME “REGIONS IN GROWTH” Investing.
1 CONFIDENTIAL Madi Kanafin Senior specialist at Sectorial department on transport and logistics infrastructure, KAZNEX INVEST, JSC Mob:
Krasnodar region in the EU map Region Profile Administrative centre: Krasnodar city Area: square kilometres Population: Gross regional.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
Location The park is located between the major centers of consumption in Russia Industrial Park MSB-Udomlya is located in the Tver region. The developed.
Power Transmission Rehabilitation Project TERMS AND CONDITIONS OF INVESTMENT FUNDS “High Voltage Electric Networks” CJSC (HVEN CJSC) is implementing.
«MALAYA SOSNOVKA» INDUSTRIAL INNOVATIONS PARK. - is situated in the centre of Russia on the border between Europe and Asia; - the territory is 88.5 thousand.
Transcarpathian Regional Council Zahony Development Company Beregovo District Administration Municipal government of village Diyda ENPI Cross-border Cooperation.
Ing. Alena Bujnová, Head of Water Policy Department Ministry of Environment of the Slovak Republic.
Gujarat’s First Metro City.  Life at Dholera Metro City is actually an incredible moment to expertise.Dholera Metro City  This town is loved by millions.
The Reno Streetcar March 8, 2016 RTC 2040 Regional Transportation Plan Economic Development Forum.
Community Development Department FUTURE LAND USE MAP AMENDMENT SMALL-SCALE LU-MIN-07-03a & ZONING MAP AMENDMENT RZ-OTH
1. Initiator and goals of the project Initiator of the project – the Investment Promotion Agency of Novosibirsk region – a specialized organization for.
PORTFOLIO The most reliable solutions!. Our Clients: The most reliable solutions!
1 Construction of the waste incineration plant with the mini-CHP in Izhevsk 2015 Preliminary presentation.
STRATEGY OF LOCAL GOVERNMENT IN THE WASTE MANAGEMENT IN KIEV
DETAILS OF PROJECT INTERGRATED AIRPORT CITY DEVELOPMENT CONCEPT AND MASTER PLAN 4 Star Hotel with 150 rooms and 5000 seater Conference facility Budget.
REGIONAL DEVELOPMENT MAP
Hotel infrastructure Tourist flow.
Regional Investment Project “Integrated development of the area on
Investment proposal on creation of wood processing enterprise in Manturovo municipal district of Kostroma Region Kostroma, 2014.
Regional Roads Committee
Management company of a special economic zone
Investment potentials Loznica 2016.
The intermodal logistics capacity in the region of Záhony
Industrial Zone Alatau district of Almaty
Industrial Zone Alatau district of Almaty
Minerals in South-Kazakhstan oblast
«We will start carrying out promising projects such as the formation of international transportation corridors, including those from the Baltic via the.
«We will start carrying out promising projects such as the formation of international transportation corridors, including those from the Baltic via the.
- Customs duties exemption
uacn property development company plc
LOGISTIC SECTOR: THE PANAMA CASE
Management company of a Special Economic Zone
Cross-border Infrastructure Projects
Agricultural land reserve exclusion application
INVESTMENT POTENTIAL OF SYRDARYA REGION
FIELD LEVEL CHALLENGES FOR SOLAR PARKS IN INDIA
Yangon Region Rural electrification plan
The Republic of the Union of Myanmar Ministry of Electric Power
PRESENTS RAKSHA GREENS.
KEDR Management Company LLC
River Basin Management Flood protection
ENCLAVE POWER COMPANY LIMITED
Integrated Bilateral Agreement (IBA) 2018 to 2028
Infrastructure Projects Facility and the Western Balkans Infrastructure Initiative Brussels, 25 November 2008 Christos Gofas DG ENLARGEMENT D3.
Investment potential   Petrovsky city   district Stavropol Territory.
ACTION PLANNING FOR CITIES CASE STUDY ULAANBAATAR CITY
Sanitation Study and Wastewater Network System AL Tayba Village
/PowiatRzeszowski RZESZOWSKI DISTRICT.
Caspian Environment Program Caspian Investment Forum Implementation of the National Caspian Action Plan of Turkmenistan Glasovskiy V. A. Ministry of.
Presentation transcript:

Information about the resort recreation area "Kenderli"

Geographical location of Kenderli The resort area is located in the Kenderli area in the Kazakh Gulf, located 70 km south of the city of Zhanaozen and 2 km from the existing recreation center Kenderli. There are: 1) Kendery Holiday Village Occupies an area of 7.5 hectares, a one-time capacity - 150 people; 2) Children's health camp "Aөbөbek" - occupies the territory 9 hectares, one-time capacity - 250 people; 3) Medical Rehabilitation Center "Medicker".

Existing tourist infrastructure The nearest airport to Kenderli is located in Aktau, at a distance of 210 km; Currently, there is an asphalt road between Aktau and Kenderli, which stretches for 60 km to the south towards Turkmenbashi (the border with Turkmenistan); Access to Kenderli by rail does not exist. The power supply is provided from the existing substation of 110/6 kV Substation "Fetisovo" (actual load 56A), which is powered from 110 kV L-Fetisovo-2 HV-line by AC-95 with a length of 1x64.5 km. The line was built in 1990 on reinforced concrete pillars of the type UB-110-1, with insulators of the brand PSG-70, the number of supports is 316 pcs. The permissible current load of AC-95 wire at 40 C ambient 300A. Gas supply - along the highway Aktau-Turkmenbashi is laid gas pipeline "Okarem-Beyneu." According to the UEHKH, the construction of the gas pipeline and automated gas distribution system from the Okarem-Beyneu gas pipeline is being completed as part of the construction of the external infrastructure of the resort recreation area Kenderli. Water supply and water disposal - in the recreation area Kenderli there are CBS capacity of 120 m3 / day. Also there are two potable water tanks with a volume of 1000 m3, water treatment filters - 2 pcs. with a capacity of 25 m3 / h.

2. Decision of the Karakiyan regional maslikhat 1. Resolution of the akimat of the region from 17.01.2008 № 28 "On approval of the master plan for the creation and development of the tourist cluster in the Mangistau region". 2. Decision of the Karakiyan regional maslikhat Of December 21, 2010 № 32/229 "On the General Plan of the International Recreation Area" Kenderli “ 3. According to the information provided by the Akimat of the Karakiyansky district, 1700 hectares are in state ownership. NORMATIVE AND LEGAL DOCUMENTS FOR THE DEVELOPMENT OF THE KENDERLI RECREATION AREA

According to the General Plan, the resort area of Kenderli is based on the following project: The total area of the project is 1700 hectares; There are 23 hotels with a capacity of 21 000 beds. 500 houses and luxury villas in private property; More than 500 hectares are allocated exclusively for green areas and parks; Institutions and enterprises for service of the recreation area;

Individual exclusive villas in Kenderli Bay; The Kenderli project includes: Construction of a new resort recreation area in the northern part of Kenderli Bay; Construction of a desalination plant, a wastewater treatment plant and a greenhouse (not far from the resort) - The desalination plant will be located 4 km north of the Kenderli resort recreation area and should also serve the future "Kenderley town". The productivity is 40,000 m3 per day. Construction of a new international airport 20 km east of the new Kenderli resort - "Kenderli Resort International Airport". Capacity up to 1 million passengers per year; Construction of sewage treatment plant with a production capacity of about 26,000 m3 per day, an additional facility for processing waste is also proposed; Construction of a new city, mainly for workers of the future resort and their families - a new city "Kenderli"; Individual exclusive villas in Kenderli Bay; Laying a railway line along the route "Aktau - Kuryk - Kenderli“ for a tourist train with panoramic windows along the coast of the Caspian Sea.

9 feasibility studies for the construction of external engineering networks of the client Kenderli were developed: 1) The construction of a sewage treatment plant at 26,000 m3 per day In resort area Kenderli; 2) Construction of sewage treatment facilities for the international airport of Kenderli; 3) Construction of water supply at Kanderli International Airport; 4) Construction of a high-pressure gas pipeline from AGDS to Kanderli International Airport; 5) Construction of a gas pipeline and AGDS from the Okkarem-Beyneu gas main; 6) Construction of a new 110 / 10kV substation with two 40MVA power transformers, 110 kV outdoor switchgear according to 110-4N scheme, reconstruction of the existing 110 kV L-Fetisovo overhead line with complete replacement of wires with partial replacement of supports and construction of a second power transmission line with 110 kV voltage from Substation " Uzen-220 " 7) Construction of substation PS 110/10 for Kenderli airport; 8) Construction of a highway to the resort area of Kenderli; 9) Construction of a highway to the international airport of Kenderli.

Design and estimate documentation (DED) with a positive conclusion for 6 sites: Construction of a new 110 / 10kV substation with two 40MVA power transformers, 110 kV outdoor switchgear according to 110-4N scheme, reconstruction of the existing 110 kV L-Fetisovo overhead line with complete replacement of wires with partial replacement of supports and construction of a second power transmission line with 110 kV voltage from Substation " Uzen-220 “; (Estimated cost - 2,361 million tenge. Conclusion of the GE No. 01-0068 / 13 of 19.02.2013) 2. Construction of the highway of the resort recreation zone "Kenderli" with a length of 2.141 km (Estimated cost - 319 million tenge. Conclusion of the GE No. 15-0994 / 12 of 21.12.2012) 3. Construction of substation PS 110/10 for Kenderli airport . (Estimated cost - 531 million tenge Conclusion of the GE No. 15-0547 / 12 of December 23, 2012) 4. Construction of a high-pressure gas pipeline from AGDS to Kanderli International Airport (The estimated cost is 289 million tenge Conclusion of the GE №15-0598 / 12 of December 24, 2012) 5. Construction of a gas pipeline and AGDS from the Okkarem-Beyneu gas main (Estimated cost-1106 million tenge. Conclusion of the GE №15-0994 / 12 of 21.12.2012). 6. Construction of sewage treatment facilities for the international airport of Kenderli (The estimated cost is 754 million tenge Conclusion of the GE No. 15-0994 / 12 of December 24, 2012)

For the following 3 objects the situation is as follows: 1 According to construction of water supply at the international airport "Kenderli" - does not correspond to the estimated costs: under the DED - 986 million tenge, feasibility study - 346 million tenge. The adjustment of the feasibility study was completed and commissioned for state expertise. 2 The construction of a sewage treatment plant at 26,000 m3 of the international resort recreation area Kendirli - does not comply with the estimated costs: for DED-4,687 million tenge, feasibility study - 3290 million. 3 The construction of the motorway at the international airport "Kenderli" with the length of 6.333 does not correspond to the estimated costs: according to the DED - 1200 million tenge, feasibility study - 686 million tenge.

Memorandum on the implementation of the System Plan for the development of the recreation area "Kenderli" Akimat of Mangistau region Provides development of design estimates for the construction of external engineering infrastructure of the Kenderli resort area; Conducts work on development of the engineering and transport infrastructure of the region; Takes measures to allocate land for the construction of the resort; Ministry of Investment and Development of the Republic of Kazakhstan Ensures the development and further implementation of the Systemic Development Plan for the Kenderli Resort Area; Conducts work on attracting potential investors for the implementation of the project.

Proposal for engineering infrastructure 1).Take appropriate measures to adjust the General Plan of the Kenderli resort area; 2) Under the project of the international airport "Kenderli", a feasibility study was developed and approved. There is no DED. The decision is to submit a budget request for the allocation of funds for the development of DEDof the international airport of Kenderli. 3). Submit a budget request for the allocation of funds for the construction of the following facilities having a positive state expertise with the beginning of construction in 2015: a) Construction of a new 110 / 10kV substation with two 40MVA power transformers, 110 kV outdoor switchgear according to 110-4N scheme, reconstruction of the existing 110 kV L-Fetisovo overhead line with complete replacement of wires with partial replacement of supports and construction of a second power transmission line with 110 kV voltage from Substation " Uzen-220 “ b) Construction of a highway to the resort area of Kenderli; c) Construction of substation PS 110/10 for Kenderli airport; d) Construction of sewage treatment facilities for the international airport of Kenderli; 4). Ensure that the feasibility study and DED of the sewage treatment plant is accelerated at 26,000 m3 of the Kenderli resort area.

Thank you for your attention!!!