Presentation is loading. Please wait.

Presentation is loading. Please wait.

REGIONAL DEVELOPMENT MAP

Similar presentations


Presentation on theme: "REGIONAL DEVELOPMENT MAP"— Presentation transcript:

1 REGIONAL DEVELOPMENT MAP
REGIONAL DEVELOPMENT MAP Investment projects embedded in the Regional Development Map (TOURISM, AGRICULTURE, SERVICES, CONSTRUCTION) Project initiator Project name Industry Project cost, tenge 1 Zhidek farm Construction of modern production for growing, storing and processing of vegetables: onions, carrots, potatoes on an industrial scale Agriculture 2 Zhambyl Kus LLP Upgrading and construction of poultry farm 3 Baiseyit Bi LLP Construction of vegetable stores 4 Asterra Asia LLP Construction of the "Integrated seed plant with a capacity of 10 thousand tons per year of finished seeds" 5 KazTechPromotion LLP Construction and operation of roadside service complex "B" category Services 6 Camping Merke LLP Construction and operation of roadside service complex “A" category 7 Baiterek Travel Center LLP Construction of a family camping site “Kazakh auli Koksai” Tourism 8 Zolotoy Caravan LLP Construction of a family camping site “Yabloneviy sad” 9 Sole proprietorship Tuytebayeva Construction of recreational areas 10 Altyn-Bulak farm Construction of agro-tourist complex "Altyn Bulak"

2 «Construction of modern production for growing, storing and processing of vegetables: onions, carrots, potatoes on an industrial scale» Purpose of the project: The project envisages the creation of modern production on cultivation, processing and storage of vegetables: onion, carrot on an industrial scale. Applicant: Zhidek farm Implementation period: 2016 – 2018 Place of implementation: Zhambyl region, Turar Ryskulov district, Maldybay village Total project cost: 1.65 bln tenge The volume of investment required: 1.65 bln tenge Funding scheme: Investor funds Number of jobs: 15 Socio-economic impact: Attracting around 15 people solely from local residents of the area of ​​the project. Tax revenues in the budget. The project will enable the sustainable development of vegetable production, the creation of an effectively functioning system of production, storage, packaging and distribution, the formation of the regional vegetable growing cluster. Current status: For the implementation of the project the initiator has 60 wells for lifting underground fresh water, ​​850 hectares of arable land near the well area, 10 hectares of land at the Almaty railway station named Maldybay (for the construction of the complex). Problematic issue: Investment required

3 Upgrading and construction of poultry farm
Purpose of the project: Creating a highly profitable and highly productive production of egg-laying, including rearing with the release of high-quality products - commodity egg and poultry, by updating and modernization of fixed assets, reconstruction, technical and technological re-equipment of production facilities for poultry. Applicant: Zhambyl Kus LLP Implementation period: 2016 – 2017 Implementation place: Zhambyl region, Baizak district, Koktal village Total project cost: bln. tenge The volume of investment required: bln.tenge Funding scheme: Investor funds Number of jobs: 150 Socio-economic impact: Creating 150 jobs solely of local residents of the area of the project. Tax revenues in the budget. Providing population of the region all year round fresh meat and eggs. Current status: The company is located on the territory of 69.3 hectares. Zhambyl Kus LLP is the only poultry farm in the Zhambyl region. Currently, the poultry farm Zhambyl Kus LLP produces up to 20 million eggs per year, which covers 25% of the region needs in this product. The company has the Certificate of quality management system and ISO ST RK № KZ dated 08 February 2010. Problematic issue: Investment required

4 «Construction of vegetable stores»
Purpose of the project: Provision of the population of the region with quality, local fruits and vegetables Applicant: Bayseyit bi LLP Implementation period: 2016 – 2020 Implementation place: Zhambyl region, Taraz city Total project cost: 167 076 th. tenge The volume of investment required: 167 076 th. tenge Funding scheme: Investor funds Number of jobs: 16 Socio-economic impact: Attracting around 16 people solely from local residents of the area of the project. Tax revenues in the budget. Providing population of the region all year round with fresh vegetables. Current status: For the implementation of the project the initiator has a land with area of 0.1 ha in Zhambyl region, Zhambyl district, Karatobe rural district (for the construction of vegetable storehouses) Problematic issue: Investment required

5 Construction of the "Integrated seed plant with a capacity of 10 thousand tons per year of finished seeds" Purpose of the project: Production of seeds of higher reproductions, construction and operation of "Integrated seed plant with a capacity of 10 th. tons of finished seed per year" Applicant: Asterra-Asia LLP Implementation period: 2016 – 2017 Implementation place: Zhambyl region, Zhualy district, Zhanatalap village Total project cost: 2.4 bln.tenge The volume of investment required: 1.9 bln.tenge Funding scheme: Investor funds Number of jobs: 25 Socio-economic impact: Attracting around 25 people solely from local residents of the area of the project. Tax revenues in the budget. Providing households with seeds of the best varieties, with the quality according to the world standards, at a reasonable price. Current status: For the implementation of the project the initiator has a land of 3 hectares area in Zhambyl region, Zhualy district, Zhanatalap village (for the plant construction) Problematic issue: Investment required

6 Construction and operation of roadside service complex "B" category in Zhualy district of Zhambyl region «Truckstop Shakpak gates» Current status: The company has an area of 4 hectares for the purpose “Construction and maintenance of roadside service", located on the 582 km of Almaty - Tashkent – Termez highway. Acquisition of special equipment and building materials in the form of concrete products. Technical specifications were obtained from NC KazAvtoZhol JSC. Problematic issue: Investment required Purpose of the project: Construction and operation of the roadside service complex category "B” on the international highway "Western Europe - Western China". Applicant: KazTechPromotion LLP Implementation period: 2016 – 2018 Implementation place: Zhambyl region, Zhualy district, 582 km of Almaty – Tashkent - Termez highway Total project cost: 402 bln.tenge The volume of investment required: 300 bln.tenge Funding scheme: Investor funds Number of jobs: 15 Socio-economic impact: Creation of up to 15 jobs, only from the local population. Facilitating the development of tourism in Zhambyl region, tax revenues in the budget. Securing on the market of high-quality camping roadside services.

7 Construction and operation of roadside service complex “A" category in Merke district of Zhambyl region “Camping Merke” Current status: The company has a land area of 7.5 hectares, located in Merke district, 325 km of Almaty-Tashkent-Termez international highway Western Europe-Western China. Technical specifications were obtained from NC KazAvtoZhol JSC. Problematic issue: Investment required Purpose of the project: Construction and operation of the roadside service complex category “A” on the international highway "Western Europe - Western China". Applicant: Camping Merke LLP Implementation period: 2016 – 2017 Implementation place: Zhambyl region, Merke district, 325 km of Almaty – Tashkent – Termez highway Total project cost: 700 bln.tenge The volume of investment required: 700 bln.tenge Funding scheme: Investor funds Number of jobs: 15 Socio-economic impact: Creation of up to 15 jobs, only from the local population. Facilitating the development of tourism in Zhambyl region, tax revenues in the budget. Securing on the market of high-quality camping roadside services.

8 Construction of a family camping site “Kazakh auli Koksai”
Purpose of the project: The project envisages the construction and operation of "Koksai" yurt village in Zhualy district of Zhambyl region, with one-time capacity of the resort for tourists a year. Applicant: Baiterek Travel Center LLP Implementation period: 2016 – 2018 Implementation place: Zhambyl region, Zhualy region, Tattibay village Total project cost: 935 mln. tenge The volume of investment required: 935 mln.tenge Funding scheme: Investor funds Number of jobs: 51 Socio-economic impact: Creation of 51 workplaces only from local residents of the area of the project. Tax revenues in the budget. Establishment of a national tourist product. The increase in tourist flows of inbound and domestic tourism. Current status: A yurt village of 21 yurts is currently open, the complex is being designed with a German architect, also all the necessary agreements are concluded for its implementation. Problematic issue: Investment required

9 Construction of a family camping site “Yabloneviy sad”
Purpose of the project: The project envisages the creation of the family camp site with holiday elements, children's tourism, fishing, sports competitions in the valley of Zhambyl oblast. Applicant: Tourist center Zolotoy Caravan LLP Implementation period: 2016 – 2018 Implementation place: Zhambyl region, Zhambyl district, Akbulym village Total project cost: 85  tenge The volume of investment required: 85  tenge Funding scheme: Investor funds Number of jobs: 11 Socio-economic impact: Creation of 11 workplaces only from local residents of the area of the project. Tax revenues in the budget. Establishment of a national tourist product. The increase in tourist flows of inbound and domestic tourism. Current status: There are areas of land, land adjacent to the apple orchard, acting apple orchard Problematic issue: Investment required

10 Construction of recreational areas
In Merke district Purpose of the project: This project involves the construction of recreational areas, including: a cottage town, a cafe, a pool, trestle-beds, comfortable Russian baths, as well as sports facilities and equipment for active recreation. Applicant: Tuytebyaeva sole proprietorship Implementation period: 2016 – 2017 Implementation place: Zhambylskaya oblast, Merke district, Merke village Total project cost: tenge The volume of investment required: tenge Funding scheme: 20% of project initiator funds and 80% of investor funds Number of jobs: 10 Socio-economic impact: Creation of 10 workplaces only from local residents of the area of the project. Tax revenues in the budget. Establishment of a national tourist product. The increase in tourist flows of inbound and domestic tourism. Current status: There is a plot of land with total area of ha in Merke district, Zhambyl region. Problematic issue: Investment required

11 Construction of agro-tourist complex "Altyn Bulak”
Purpose of the project: This project involves the construction of an agro-tourist complex "Altyn Bulak" in Zhambyl region for the recreation of local and foreign tourists, family, individual and corporate entertainment. Applicant: Altyn Bulak farm Implementation period: 2016 – 2017 Implementation place: Zhambyl region, Zhambyl district, Shaykoryk village Total project cost: 1 bln.tenge The volume of investment required: 800 mln.tenge Funding scheme: Investor funds Number of jobs: 40 Socio-economic impact: Creation of 40 jobs only from local residents of the area of the project. Tax revenues in the budget. recreation, sports development and building a culture of outdoor activities, contributing to the improvement of the rising generation. Current status: There is a plot of land measuring 10 hectares with arable lands (apple orchards and vineyards), a land adjacent to the apple orchard and a pond of 2.5 hectares, which is filled by natural springs. Problematic issue: Investment required


Download ppt "REGIONAL DEVELOPMENT MAP"

Similar presentations


Ads by Google