Presentation is loading. Please wait.

Presentation is loading. Please wait.

River Basin Management Flood protection

Similar presentations


Presentation on theme: "River Basin Management Flood protection"— Presentation transcript:

1 River Basin Management Flood protection
River Basin Analysis Development assistance Public Participation Institutional Training River Basin Planning River and Lake Restoration Aquatic Ecology Studies Restoration Planning Hydrological Studies Flood Protection Torrent Protection Systems

2 Master Plans for Investments Water and Waste Sector
Financial concepts for rehabilitation measures Expert advice for international funding Expert advice regarding Public-Private-Partnership

3 Our service offers for national and international Clients
Project Management in the environmental preview Elaboration of Pre-Feasibility Studies and Feasibility Studies Technical Assistance – Consultancy/Design/Supervision Financial Management - Controlling Institutional Strengthening and capacity building of Governmental Authorities and Communal Enterprises Participation in Public - Private - Partnerships Operation management of water treatment plants

4 Conventional Sewage disposal and treatment: Sewage Network and Wastewater Treatment Plant Altenmarkt
Scope of Project: 40 km sewer 4 Pumping Stations Treatment Plant Provided Services: Project Management Feasibility Study Design Tendering Supervision Period: 1995 – 2007 Investment Costs: 12 MEUR

5 PPP-Project in Communal Services:
Sewage Network and Wastewater Treatment Plant Ernsthofen / Lower Austria - Austrian Pilote Project for Public Sector Participation Scope of Project: Construction and operation of sewage network and wastewater treatment plant Provided Services: Project Management Tendering Co-ordination of construction Financial Management Operation Management Period: 1997 ongoing Investment Costs: 10 MEUR

6 Application of non-conventional technologies: Aerated Lagoon Soos – Lower Austria
Scope of Project: Provided Services: Project Management Feasibility Study Design Tendering Supervision Period: 1989 – 1993 Investment Costs: MEUR

7 Advanced Sewage treatment:
Wastewater Treatment Plant – Purgstall / Erlauf Treatment of leachate of communal waste landfills Scope of Project: Construction of a central treatment plant for the leachate communal landfills of Lower Austria 60 m3/d Provided Services: Project Management Feasibility Study Design Tendering Supervision Period: Investment Costs: 5,0 MEUR

8 Advanced Potable Water Treatment
Treatment Plant – Fischer Deponie / Theresienfeld Treatment of groundwater contaminated with clorinated carbons Scope of Project: Construction of a multi-stage treatment plant Capacity 100 l/s, 3 Mio m3 per year Provided Services: Project Management Feasibility Study Design Tendering Supervision Operation Management Monitoring Period: 1989 ongoing Investment Costs: 7,5 MEUR

9 Scientific research and Development in the environmental sector
Optimzation of non-conventional technologies Constructed Wetlands – Test Plant Ernsthofen Scope of Project: Construction and operation of a testing plant in order to define and verify optimized design criteria for the technial use Provided Services: Consultancy Operation Management Data compilation and analysis Evaluation Period:

10 Master Plans and Feasibility Studies
Sewage Disposal and Treatment system Bratislava -Zahorije Reconstruction and extention of network and facilities Scope of Project: Elaboration of Basic Concept for future sewage network and treatment plant Provided Services: Project Management Feasibility Study Economic Analysis Period: 2001 Investment Costs: 9,0 MEUR

11 Rehabilitation of Water Supply and Stormwater Disposal System in Shkodra, Albania
Reconstruction and extention of network and facilities Scope of Project: Replacement of distribution pipes and valves New Transmission Mains New Pumping Station Refurbishment of reservoirs New Stormwater collector Provided Services: Project Management Design Tendering Supervision of construction Period: 1998 ongoing Investment Costs: 6,0 MEUR

12 Banja Luka – Ramici Landfill
Remediation of Landfills – Closure of Landfills Construction of Ecological Landfills according EU-directive Banja Luka – Ramici Landfill Scope of Project: Remediation of existing regional landfill Construction of expansion area according to EU-waste directive for 20 years operation period Provided Services: Site investigation Risk assessement Variant analysis Initial design Main Design Economic Analysis (Financing plan, Tipping Fee calculation, cost estimate) Period: Investment Costs: 12,0 MEUR

13 Our Consulting Approach
Step-by-step development of projects: Vision – Idea – Concept – Design - Realization Tailor made solutions reflection the Client s capabilities Use of “Applied (Lean) -Technologies” but in best available quality Accompanying institutional strengthening measures Public Awareness campaigns Intensive Co-Operation between Consultant and Client We assist you in transforming your visions and ideas into feasible solutions!


Download ppt "River Basin Management Flood protection"

Similar presentations


Ads by Google