Presentation is loading. Please wait.

Presentation is loading. Please wait.

PORTFOLIO The most reliable solutions!. Our Clients: The most reliable solutions!

Similar presentations


Presentation on theme: "PORTFOLIO The most reliable solutions!. Our Clients: The most reliable solutions!"— Presentation transcript:

1 PORTFOLIO The most reliable solutions!

2 Our Clients: The most reliable solutions!

3 Our Clients: The most reliable solutions!

4 PROJECT: «MULTIFUNCTIONAL RESIDENTAL COMPLEX “GREEN QUARTER” – MEGALINE» Client – EXPO Village LLP Project – “Green Quarter” Multifunctional Residential Complex Building footprint = 36 316, 73 m2 Buildings total area = 209 260,21 m2 Number of construction phases – 6 Services performance period – 2015 Services provided – Initial permit documentation compliance review, issue of comments, advice and suggestions; Review of Designer’s Technical Solutions contained in all sections of design documents except Cost Estimate Section Client’s advantages – All sections of Design Documentation quality improvement Preparation of additional feasibility studies required for Project sections calculations. As a result positive conclusion from Gosexpertisa RSE for construction stages 2, 3 obtained

5 The most reliable solutions! FS: RAILWAY STATION COMPLEX CONSTRUCTION IN ASTANA Client – JSC “NC Kazakhstan temir Zholy” Project – Railway Station Complex Technical description Construction Area - 26,7399 hа Complex total area 120 815 m2. Capacity - 3000 passenger per day, Parking capacity – 1129 parking spaces Complex heat power - 12,86 Gcal/hour. Services performance period– 2015 Services provided – Development of specific anti-terrorism section Design estimate documentation review Client’s advantages – safety level upgrade for Astana local residents and visitors As a result positive conclusion from Gosexpertisa RSE on 12 May 2016 obtained

6 PROJECT: RAILWAY JUNCTION DEVELOPMENT IN ASTANA The most reliable solutions! Client – Zhol Zhondeushy LLP Project – Railway junction development, Astana Technical description Construction area 26,7399 hа Complex total area 120 815 m2. Capacity - 3000 passenger per day, Parking capacity – 1129 parking spaces Services performance period– 2015 -2016 Services provided– Initial permit documentation compliance review, issue of comments, advice and suggestions; Review of accepted Technical solutions contained in design documents Review of technical documents compliance with building code of RK, including comments, recommendations and suggestions.

7 PROJECT: «PROJECT DOCUMENTATION TECHNICAL EXPERTISE» The most reliable solutions! Client – ERSAI Project– Self-elevating floating drilling unit Technical description Width – 72 m. Height – 64 m. Modified triangular body with three triangular supports 119 meters high, that allows drilling as deep as 50 up to 80 meters Unit weight – 10 800 t. Services performance period– 2015 Services Provided– Technical issues and design data review Authenticity check, assessment and revision of documents and design drawings Assessment and justification of occurred changes as additional work Assessment of Contractor’s estimate of expenses for additional work completed Recommendations and suggestions for documents type and format Client’s advantages – Construction cost adjustment As a Result technical changes justification

8 OIL PUMPING STATION “663 KM” RECONSTRUCTION AND EXPANSION The most reliable solutions! Client –KazTransOil JSC Project – Oil pumping station 663 km, Atyrau region Technical description Boosting the capacities from 10 to 20 mln oil ton per year Services performance period – 2014 Services provided – Revision of estimate and technical sections Design decision revision Price lists collection Project estimate cost increase by means of not listed expenses detection for KZT 10 bn Method Statement development Project decision development and justification Client`s advantages– FEED/DD quality improvement As a result RGP “Gosexpertise” positive conclusion obtained in December 2014

9 Water pumping station-5 reconstruction for watersupply increase in conduit Astrakhan - Mangyshlak The most reliable solutions! Client –KazTransOil JSC Project – «Water pumping station- 5» Technical description Water supply increase to 150 000 m3 per day Land area – 3,23 hа Modernization of trunk pumping station Old pumps replacement with the modern brand pumps RuhRPumpen Services performance period – 2016 Services provided – Estimate section correction Price lists compiling Method Statement correction Design documentation maintenance during Gosexpertise procedures until appropriate positive conclusion obtained within fixed time period Client`s advantages – Design documentation quality improvement As a result unlisted expenses revealed

10 “ZHAMANKOYANKULAK” SITE DEPOT RECONSTRUCTION. CORRECTION. FIRST STAGE (GAS REHYDRATION IMPLEMENTATION)" The most reliable solutions! Client – Intergas Central Asia JSC Project – «Gas dehydration on natural gas storage “Bozoy” Technical description: Plant capacity – 27nanometer3/day Construction land area – 1,0357 hа. Building coefficient – 36,6 %. Construction period - – 16 months. Expected work completion – August 2016 Provided services – Price lists compiling; Method statement section correction; “AKKE Monitoring system” section development Design documentation maintenance during Gosexpertise procedures until appropriate positive conclusion obtained within fixed time period Client`s advantages – Design process management recommendations and advices are obtained. As a result is project on completion stage.

11 SPECIALIZED FAST-FOOD RESTAURANT MCDONALD`S The most reliable solutions ! Client – Food Solutions KZ LLP Project – «Specialized fast-food restaurant McDonald`s» Technical description Building footprint -1611,4 m2 Land area - 0.219 hа Building total area - 864.02 m2 Building volume - 14019.18 m3 Services performance period – 2015 Services provided – Project documentation completeness review; Issue of comments regarding to design documentation correction; Project decision development and justification; Design documentation maintenance during Gosexpertise procedures until appropriate positive conclusion obtained Client`s advantages – Project documentation quality improvement Construction project implementation without project decision modifications As a result positive conclusion of RGP “Gosexpertise” is obtained on 24.02.2016

12 The most reliable solutions ! Client – Kazakh Institute of Oil and Gas JSC Project – «Gas pipeline “Beyneu- Bozoy-Shymkent”» Technical description: Design pressure – 7,4 и 9,81 Megapascals Gas pipeline total length – 1472 km. Services performance period – 2015 Services provided – Price lists section development; Method statement section correction; “AKKE Monitoring system” section development Project documentation maintenance during passing RGP “Gosexpertise” till positive conclusion will be obtained according to fixed time Client`s advantages – Project documentation quality improvement. As a result RGP “Gosexpertise” positive conclusion is obtained

13 PROJECT: «MULTIFUNCTIONAL COMPLEX ABU DHABI PLAZA» The most reliable solutions! Client – Aldar Euro Asia LLP Project – «Abu Dhabi Plaza Project» Technical description: Complex area – 500 000 m2. The maximum number of storeys – 75 Services performance period – 2015-2016 Services provided : Heating and domestic hot water design and engineering services 7 ETS Rooms development in BIM model (Revit) Approval by “Astana-Teplotranzit” JSC Client`s advantages: Complex construction freezing risks decrease Complex heat consumption decrease As a result the project performed according to ASHRAE standards is approved by “Astana- Teplotranzit” JSC

14 The most reliable solutions ! Client - ISS Engineering LLP Project – infrastructure of free economic zone “Chemical Park «Taraz» Technical description Free economic zone land area - 505 hа Railway area - 200 000 m2 - I queue Communications land area 81 447 m2 - I queue, 46 495 - II queue Expected work completion – May 2016 Provided services – Technical documentation preparation with recommendations issue; Answers to RGP “Gosexpertise” comments preparation Clients advantages – Design process management recommendations are issued As a results risks of estimated costs understatement are revealed PROJECT: FREE ECONOMIC ZONE “CHEMICAL PARK “TARAZ”

15 PROJECT «ZHAIREM POLYMETALS» The most reliable solutions! Client - AAEngineering Group LLP Project - «Zhairem Polymetals», Zhairem Mining processing plant Technical description: Total stead area - 100 hа. Building volume - 10 876 m3 Throughput - 120 units Services performance period – 2016 г. Services provided – FEED/DD revision in accordance to regulatory technical requirements of RK Answers to RGP “Gosexpertise” comments preparation Client`s advantages – Court of Law positive decision in favor of Client regarding quality of performed works by Designer The project is on completion stage


Download ppt "PORTFOLIO The most reliable solutions!. Our Clients: The most reliable solutions!"

Similar presentations


Ads by Google