1 Management company of a special economic zone
«National Industrial Petrochemical Technopark» MINISTRY OF ENERGY OF THE REPUBLIC OF KAZAKHSTAN UNITED CHEMICAL COMPANY

2 118 631 кm² 598,9 thousand people 2 474 333,4 million tenge
Special economic zone «National Industrial Petrochemical Technopark» Located in Atyrau region 118 631 кm² TERRITORY OF THE ATYRAU REGION 598,9 thousand people POPULATION ,4 million tenge GROSS REGIONAL PRODUCT ( EVALUATION) ATYRAU REGION AVAILABILITY OF RAW MATERIALS IN ATYRAU REGION: UNIQUE FIELDS OF HYDROCARBON RAW MATERIALS (OIL RESERVES, ESTIMATED BY 9.8 BILLION TONS, INCLUDING ON THE SHELF OF THE CASPIAN IS ABOUT 7 BILLION TONS, GAS BILLION MUBES), AND ALSO BORATES, BORA-SOLID ORES, WATER, POTASSIUM, POTASSIUM-MAGNESIUM SALTS, BUILDING MATERIALS (CLEANS, MERGEL BREEDS, GYPSUM, CLAY, SAND, LIMESTONE). RESERVES OF THE DILUTED GYPSUM DEPOSITS ARE 21 BILLION TONS, POTASSIUM OXIDE BILLION TONS, POTASSIUM SALT MILLION TONS, BAKING SALT MILLION TONS.

3 Advantages for SEZ participants
FINISHED INFRASTRUCTURE RAILWAY (15.6 km.) RAILWAY STATION “ZAVODSKAYA” TRAFFIC ROAD/HIGHWAY (5.3 KM.) TRANSMISSION LINE (110 KV)                  PRODUCTION INFRASTRUCTURE GAS TURBINE POWER PLANT (310 MW) TECHNICAL GASES PLANT WATER TREATMENT PLANT GENERAL INFRASTRUCTURE FIRE STATION POND EVAPORATOR; WAREHOUSES; GAS STATION, SERVICE STATION; CUSTOMS CONTROL; CHECK-INPUT SYSTEM AND VIDEO-OBSERVATION; ELECTRIC TRANSMISSION LINE (220 KV) EXTERNAL AND INTRAFUNCTIONAL NETWORKS; HIGHWAY ; ADMINISTRATIVE COMPLEX (1 210 M2); Fencing (15 KM). CORPORATE INCOME TAX % LAND TAX % VAT % PROPERTY TAX % CUSTOMS DUTIES % ЗОНА ТАМОЖЕННОГО КОНТРОЛЯ КЕДЕН БАҚЫЛАУ АЙМАҒЫ CUSTOMS CONTROL ZONE STATE GUARANTEES ON THE TERRITORY OF THE SPECIAL ECONOMIC ZONE "NATIONAL INDUSTRIAL PETROCHEMICAL TECHNOPARK" - ACTS A SPECIAL LEGAL REGIME LAND REDEMPTION RIGHT LAND PLOT FOR RENT UP TO 2032 DEPARTMENT OF STATE REVENUES IN ATYRAU REGION ONE WINDOW SERVICE

4 The procedure for registration as a participant in the SEZ
1 REGISTRATION OF APPLICATION AT MC “SEZ" NIPT " 2 CHECKING THE COMPLETENESS OF THE PACKAGE OF DOCUMENTS PROVIDED 3 INSPECTION FOR CONFORMITY TO PRIORITY ACTIVITIES 4 CONCLUSIONS OF THE CONTRACT FOR THE IMPLEMENTATION OF ACTIVITIES 5 NOTICE TO THE AUTHORIZED BODY 6 INCLUSION INTO A SINGLE REGISTER OF PARTICIPANTS OF SEZ 7 NOTICE OF STATE INCOME ORGANS 8 ON THE BASIS OF CONTRACT, THE PARTICIPANT OF THE SEZ DISCONTINUES THE ACTIVITY OF ITS DIVIDED DIVISION 9 AN OFFICIAL TENANT/MEMBER of «SEZ« NIPT »

5 The production was launched in 2015
POLYMER - PRODUCTION Volume of production Project Status PLANT FOR MANUFACTURE OF POLYMER PRODUCTS Polyethylene film tons per year Polypropylene bags - 48 million pieces per year BOPP-film - up to 11 thousand tons per year The production was launched in 2015 Planned period of reaching the designed capacity: year

6 PRODUCTION OF POLYPROPYLENE
KAZAKHSTAN PETROCHEMICAL INDUSTRIES INC. Volume of production Project Status PRODUCTION OF POLYPROPYLENE Estimated date of launch: October - December 2020 500 thousand tons of polypropylene per year The contract and supply contract was signed with CNCEC The development of the DED is completed, the positive conclusion of the governmental expertise has been received; Planned period of reaching the designed capacity: 2022

7 INDUSTRIAL INFRASTRUCTURE OBJECTS
KARABATAN UTILITY SOLUTIONS Volume of production Project Status INDUSTRIAL INFRASTRUCTURE OBJECTS             SEZ "NIPT“ Estimated launch date: 2018 Gas Turbine Plant’s Power MW Detailed feasibility study was developed and approved by state expertise Mobilization of C-contractor personnel and equipment was completed Planned period of reaching the designed capacity: 2019 444 people of the C-contractor were mobilized to the construction site;

8 Polyethylene (STAGE II Integrated petrochemical complex)
KLPE Volume of production Project Status PRODUCTION Polyethylene (STAGE II Integrated petrochemical complex) Estimated date of launch: MOVED Power: 800,000 tons of polyethylene per year. The feasibility study of the project was developed: the conclusion of RSE “Governmental Expertise" (June 2014) Planned period of access to the project: DELAYED In search for a new strategic partner