CERN IT Department CH-1211 Genève 23 Switzerland t Mobile services: Sunrise SWAP Rodrigo Sierra IT/CS.
Advertisements

Long shutdown 2013: Electrical distribution activities 09/03/2012 IEFC 2012 Workshop F. Duval on Behalf of EN/EL group.
112/06/2012. Summary  Network infrastructure consolidation & upgrade 66 kV et 18 kV  UPS SILCON replacement project  Projects and maintenance work.
Electrical power distribution in experiments W.Iwanski.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Preliminary Studies of the Electric Power Distribution for CLIC
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
1 EL Consolidation IEFC Workshop F. Duval on behalf of EN/EL
EN-EL and LS2 Gerard CUMER, EN-EL february Presentation outline 2 Part 1 : Overview of CERN’s electrical network Part 2 : Power Quality _ Statistics.
112/09/2013. Summary  Events on the network  Incidents  Network reconfigurations  Network operation  Update on activities  Tests  Projects and.
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
Safe-Room Status Intermediate ‘Conclusions’ M. Brugger (based on HSE discussion)
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Booster LV Electrical Distribution: Schedule and Quantities Aims: Modernisation of Booster electrical infrastucture To install necessary infrastructure.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
Power Quality Karsten KAHLE Electric Power Converter Group (TE-EPC) High Power Converter Section Review of CERN’s Electrical Power Network October.
Static Var Compensator Status (SVCs for Booster and SPS) Situation in 2009 Karsten KAHLE, TE-EPC ATOP days March 2009.
ATC/ABOC Days, 22 January 2007 The safety electrical networks at CERN Anne Funken, TS-EL.
ABOC/ATC days Electrical Network: Selectivity and Protection Plan José Carlos GASCON TS–EL Group 22 January 2007.
On behalf on EN-EL October 1 st, 2015 YETS Works EN-EL [ CF excluded ]
Consolidation needs for the Electrical Distribution, Control Cables and Optical Fibres Equipment F. Duval.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
EN-EL Activities for LS2 LIU, Consolidation, Maintenance, Operation Nicolas Bellegarde on behalf of EN-EL.
Proposal for rerouting of buried electrical networks and optical fibres at Point 1 LS2 Committee meeting S. Bertolasi on behalf on EN/EL WP17.2 HL-LHC.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Main MPE Activities during YETS/EYETS/LS2 and the Provision of Resources Andrzej Siemko Andrzej Siemko TE-MPE1.
Electrial Safety LS2 days November 2016 AP
Magnet activities in SPS during EYETS
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
EN-CV activities for LHC during LS2
YETS & LS2 Works EN-EL / Power distribution
SPS Personnel Protection System Renovation Project
Session 1: Major Events in 2006
ABT-EC EYETS Activities 2nd reports
Situation of the Static Var Compensators at CERN.
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
Framework Schedule from EYETS 2016 to LS2
Update on the Critical Path of the PS Booster Schedule for the EYETS
YETS & LS2 Works EN-El on LHC / Power distribution
EYETS David Hay EN-OSS.
Injector De-cabling Project
BE-ICS activities for LIU Project
YETS & LS2 Reminder G. Girardot 20 juin 2017.
EN 4946 – Refurbishment of Electrical Substations
the high-voltage network of CERN ToMORROW
TE/EPC activities for YETS & LS2 LINAC 2-3, PSB, PS & TT2
TE/EPC activities for LINAC 2, PSB, PS & TT2 during EYETS
EN-HE SPS works during EYETS
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS EN-CV Planning LS (initial draft)
SPS Planning for the EYETS Meeting 8 (07/12/2016)
the CERN Electrical network protection system
EYETS 2016/2017 Activities SPS Access system Maintenance and Evolutions Access system EYETS 2016/2017 EDMS:
SPS activities during LS2 TE-EPC (Power Converter Group)
Summary of ECRs for the YETS Booster, PS, ISOLDE and associated transfer lines (LIU + Consolidation) T. Birtwistle (EN-MEF-DC)
YETS & LS2 Works EN-EL / Power distribution
TE-MSC activities in SPS during YETS
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
F Duval, on behalf of EN/EL
Business opportunities related to CERN electrical network
V.Chareyre/H.Thiesen/I.Romera/M.Zerlauth
Power cut 18kV cable for EMD404/E9 is heating
Sites Indoor (37 Swisscom sites + 17 CERN sites) LHC: Transfer lines :
Experimental Areas – LS2 planning
ILO Industrial Opportunities Days, 6-7 June 2019
Presentation transcript:

EYETS 2016-2017 Works EN-EL [ FC excluded ] On behalf on EN-EL

EN-EL IMPACTS for the EYETS 2016-2017 Concerning the whole CERN : Annual test for the Safety networks 10’ power cut of « General Services » & « Safety » networks at 6:00 am in a working day Prohibited access in underground Auto-transfer test PS – Booster impacted only a week-end on the Meyrin site All other sites (SPS – LHC – 513 – MEY without PS – Prevessin – ZN…) repowered without power cut on degraded configuration during the week-end Meyrin - LHC1 – LHC18 - BA6 – BA7 Safety network not available only Saturday in working hours ! EYETS 2016-2017 – Works EN-EL [FC excluded] On behalf on EN-EL

EN-EL IMPACTS for the EYETS 2016-2017 On LHC (1/2) : AUG tests 9 days, 1 day by site on working days – Arcs affected Prohibited access in underground Done on compliance equipment on LV switchboard Replacement of 48Vdc interrupter without LV power cuts Test of redundancy feeders QPS LHC machine to eliminate non-compliances RTU replacement on all alcoves PLC replacement for physics racks for ATLAS (waiting ATLAS approval) Maintenances 48V, transformers, UPS, and more specifically UPS Cryo LHC EYETS 2016-2017 – Works EN-EL [FC excluded] On behalf on EN-EL

EN-EL IMPACTS for the EYETS 2016-2017 On LHC (2/2) : Re-routing cable for HL-LHC MP7 (LHC General Services 18 kV) No (or partial) Autotransfer 2 weeks (16-24/01) in degraded mode !!! General Services + Machine cables from LHC1 to LHC18 1 month (15/02 – 14/03) in degraded mode (8 MVA maxi for LHC18 from BA7) !!! Not compatible with LHC18 & SPS AUG tests Modification of 66 kV protection relays LHC1-2-4-6 (Machine network) + BE9 (General Services for LHC loop) 2 days for each in degraded mode (limitation of power) Not compatible with LHC AUG tests EYETS 2016-2017 – Works EN-EL [FC excluded] On behalf on EN-EL

EN-EL IMPACTS for the EYETS 2016-2017 On SPS (1/2) : AUG tests 7 days on working days Prohibited access in underground SPS Consolidation project UPS system replacement BA3, BB3, BB5 & BA7 (UPS + EOD swichtboard) 48Vdc system replacement BA3, BB3 & BA7 Replacement of the Emergency lighting BA2 & BA4 Replacement of the 3 LV switchboard for BB3 General Services and EPC & RF auxiliaries Modification on EKD1/K_ 3,3 kV switchboard BA4 & BA5 (safety network) before the EYETS Replacement on ESD210/B_ 400 V switchboard BK4 & BK5 (safety network) Prohibited access in underground, AWAKE included Maintenance UPS, 48V, transformers… EYETS 2016-2017 – Works EN-EL [FC excluded] On behalf on EN-EL

EN-EL IMPACTS for the EYETS 2016-2017 On SPS (2/2) : Re-routing cable for HL-LHC Safety networks for BA6 & BA7 1 month (15/02 – 14/03) in degraded mode (temporary gensets) Not compatible with SPS AUG tests (overload of Stable network) EYETS 2016-2017 – Works EN-EL [FC excluded] On behalf on EN-EL

EN-EL IMPACTS for the EYETS 2016-2017 On the North Area and the Prevessin site : AUG tests 4 days – 1 day by site on working days except for Prevessin Obsolete 48Vdc chargers replacement for BA80-BA81-BA82 UPS maintenance in BE91 substation, for CCC CCC protected by the UPS redundancy in BE91 Maintenance UPS, 48V, transformers… EYETS 2016-2017 – Works EN-EL [FC excluded] On behalf on EN-EL

EN-EL IMPACTS for the EYETS 2016-2017 On Meyrin (1/2) : AUG tests 4-5 days … during week-ends ! Done on compliance equipment on LV switchboard Replacement of 48Vdc interrupter without LV power cuts Replacement MN coil on ORMAZABAL switchboard in ME13, ME15 & ME62 The day of the AUG test ? Maintenance UPS, 48V, transformers … Replacement of the 18 kV switchboard in ME16 PS loop open during works - Not compatible with AUG tests EYETS 2016-2017 – Works EN-EL [FC excluded] On behalf on EN-EL

EN-EL IMPACTS for the EYETS 2016-2017 On Meyrin (2/2) : Replacement of the 18/0,4 kV transformer near ME50 (b.378) Power cut of demineralised water production b.378 during 1 day – LHC Impact Works for PSB-LIU (POPS-B b.245) De-cabling of 3 old LV switchboard (ERD16-17-18*25) Installation and cabling of the 3 new LV switchboard + 1 UPS (EDD1-2*25A + EOD1*25A) Installation of 1 transformer near b.245 Cabling of 48 Vdc & General Services LV switchboard on b.245 EYETS 2016-2017 – Works EN-EL [FC excluded] On behalf on EN-EL

Thank you for your attention !