ADO-PO / TC meeting 1st December 2016

Slides:



Advertisements
Similar presentations
ITIL: Service Transition
Advertisements

Development plan and quality plan for your Project
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Configuration Management Process and Environment MACS Review 1 February 5th, 2010 Roland Moser PR a-RMO, February 5 th, 2010 R. Moser 1 R. Gutleber.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
Computers & Employment By Andrew Attard and Stephen Calleja.
Infrastructure for LHCb Upgrade workshop CAD integration EDMS: February 2015.
NSW SG 19 Nov Nov 2014 S. Zimmermann, NSW SG 1.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
TS, Length of YETS EYETS LIU & CONS Project
STTC Meeting 12/04/99 Eva Sánchez-Corral 1 ST Year 2000 Preparation Progress report Project Definition Report INB and the Y2K syndrome Actions. Conclusions.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
JIRA usage in the DAQ An overview.
SA1/SA2 meeting 28 November The status of EGEE project and next steps Bob Jones EGEE Technical Director EGEE is proposed as.
Technical Support Activities in PH-ADO-PO
Corporate Technical Infrastructure Management From MP5 to a Corporate Technical Infrastructure Management System.
HySafe Coordination Committee Meeting, October 18, 2005, Karlsruhe Status of WP5- The Hydrogen Incident and Accident Database Update October 2005 Christian.
Michel RAYMOND – April 14 th, 2011 Technical Support Activities in PH-ADO-PO Goals for 2011.
Management Tools K. Pommès. Management Tools - The Project Planning Design Purchasing Production Installation To follow the project through its phases.
Astroparticle Physics for Europe ASPERA2WP6: OUTREACH & Electronic Tools Electronic Tools Antonio Ferrer IFIC/MICINN Kick-off Meeting DESY 7 July 2009.
HySafe Coordination Committee Meeting no. 8, December 13, 2005, INASMET San Sebastian Status of WP5- The Hydrogen Incident and Accident Database Update.
Section Meeting: TC overview. Outline TCn organization TCn activities – Maintenance and new installations Short term priorities Mid Term priorities Long.
Instrumentation of the Controls Configuration Directory Service J. Luis González Arias BE3528 Software Developer for the Accelerator Controls Configuration.
Michel RAYMOND – July 1 st, 2013 Technical Support Activities in PH-ADO-PO Summary of 2013 activities.
ADO-PO Section Meeting Safety Activities Sigi Wenig (LEXGLIMOS) 8 September 2015.
The Planning Phase Recognize the problem MIS steering committee 7. ManagerSystems analyst Define the problem Set system objectives Identify system constraints.
1 Systems Architecture WG: Charter and Work Plan October 23, 2003 Takahiro Yamada, JAXA/ISAS.
WG1 Decommissioning Kickoff Workshop WG1 Decommissioning Kickoff Workshop Long term Storage & ID tooling management R. Vuillermet on behalf of TC team.
AB/CO - TC – Cl.Deh. HT section 1 Lessons from Point 8 HW installation Better idea of Where, When and … What ! Periodic meeting (every 2 weeks)
News and Misc Didier Contardo, Jeff Spalding UPO 3/2/12 1 UPO 2/2/12 o The MM, cost estimates and reporting o Milestones and scheduling o Chamonix Meeting.
Project Office Activities R. Vuillermet 08/09/2015R. Vuillermet PH-ADO-PO1.
17 th November 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 – November 17 th 2006 Michele Battistin (TS/CV/DC) TS/CV Detector Cooling On call and.
Michel RAYMOND – December 7 th, 2012 Technical Support Activities in PH-ADO-PO Statement of 2012 activities Schedule & Organization on LS1.
Dr. José Miguel JIMENEZ LS2 Project Leader, CERN 1 LS2 Days 30 th September2015.
12 March, 2002 LCG Applications Area - Introduction slide 1 LCG Applications Session LCG Launch Workshop March 12, 2002 John Harvey, CERN LHCb Computing.
SMB SMB-SE group L. Scibile 1. SMB Mandate The SMB-SE Group is responsible to provide, to operate, maintain and to renovate the civil engineering infrastructures.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
NSW SG 10 Dec Nov 2014 S. Zimmermann, NSW SG 1.
David Adams ATLAS Hybrid Event Store Integration with Athena/StoreGate David Adams BNL March 5, 2002 ATLAS Software Week Event Data Model and Detector.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
22/09/2011 ADO-PO section meeting ADO : Atlas Detector Operation PO : Project Office R. Vuillermet.
ATLAS Safety – EYETS 2016/2017 EP-ADO-PO Section Meeting 
Introduction to Systems Analysis and Design
ITIL: Service Transition
ADO–PO/TC Meeting Safety Activities
ADO-PO / TC meeting NJD/NSW Assembly Raphael Vuillermet.
Maintenance Action Plan following OMP of May 15th 2017
ADO-PO section meeting. ADO : Atlas Detector Operation
TC activities.
SR1 extension follow up Extract and update of “Minutes of the keep-up meeting for SR1” sent on 27/02/ results from the visits and new requirements.
Chapter 6: Database Project Management
Service Section Technical Training Dec 2005.
Systems Architecture WG: Charter and Work Plan
CMS gas systems meeting
Technical Support Activities in EP-ADO-PO
Status of Brunel team and next steps
The MTF adjusted system to meet Vacuum Group needs
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
CRG activities for EYETS 2016
Current Status Future Progress Monitoring
Gemini Re-platforming Project; External User Participation July 2012
Technical Support Activities in PH-ADO-PO
Benoît DAUDIN (GS-AIS-PM – CERN) 22-March-2012
HL-LHC upgrade at IPHC news
Case management as logbook for the cryogenic installations at CERN
3.3.5: Implementing computer-based information systems
Introduction of PTM (Planning Tracking & Management) Tool - developed by Meridian Technology 29/05/2019.
Upgrade Phase 2 Mechanics meeting, 21 March 2013 Introduction
Presentation transcript:

ADO-PO / TC meeting 1st December 2016 Introduction Raphael Vuillermet Ludovico Pontecorvo 1st-Dec-2016

R. Vuillermet & L. Pontecorvo Introduction Purposes of this meeting are : News in TC and in the Section Provide information about the EYETS for Organisation Schedule Activities during the EYETS 1st December R. Vuillermet & L. Pontecorvo

New in TC and ADO-PO section Manpower New Team Leader for the CAT (Cern Atlas Team) is Christoph REMBSER replacing Giuseppe MORNACCHI from today. Giuseppe is remaining the ADO group leader. New comers : Joffrey Malaquin as a mechanical engineer in the ATLAS design office (since 1rst of October) Participating to the Atlas opening /closing operation ITK engineering activities Marco Ciapetti as the new EAM (Experimental Area Manager) starting on 1rst of March 2017 Follow cabling activities in Experimental infrastructure Follow civil engineering activities for SR1 Manage experimental areas Follow-up production of the nJD/nSW Martin Jaekel as starting on 1st of November Participates in the ID decommissioning studies and manages the GIF++ facility Ana Chrul as the support for project management starting on beginning of January Manage tool wizard Define and manage templates Miles-stone definition Define the tool to track the milestone and project progress Supervise software development on management tools for TC 1st December R. Vuillermet & L. Pontecorvo

R. Vuillermet & L. Pontecorvo Pavel Malý as designer joining the design office 1rst of January to replace Vit Zahradnik Prepare the tooling review Extraction of BOS6 BOL6 for LS3 Michail Batsiolas as an engineer in training for 6 months in design office (since 21th of October) Engineering of the MicroMega spacer frame Paola Mazzotta as technical engineer for MicroMega project 1st December R. Vuillermet & L. Pontecorvo

R. Vuillermet & L. Pontecorvo EDMS and CDD Project management News in EDMS and CDD structure Hardware configuration of the detector is now visible in CDD and soon it will be in EDMS. ATL (Phase 0) , AT1 (phase 1) and AT2 (phase 2) are now created and directories linked. Similar partition will be developed in EDMS for better clarification, better follow-up of the different phase of the detector development. This organisation will allow in particular to keep maintaining the current detectors while developing the upgrade ones (eg. SW and nSW or ID and ITK) 1st December R. Vuillermet & L. Pontecorvo

R. Vuillermet & L. Pontecorvo Storage Database The database that was used during the sorting and storing of material was an excel file. This file is now over and the database is now in production on Infor-EAM This database has the advantage of : not being dependant of the MS program over the life time of the storage (at least until 2035 for ATLAS decommissioning) being supported by the CERN EN-ACE service Being a common with other installation at CERN Being accessible also with smartphone as the building is not covered by Wifi Being accessible by several identified users Cedric Sorde Didier BERTET Danilo GIUGNI Francisco LIMIA-CONDE Frederic Rosset Leboube Christian Georges Michel RAYMOND Philippe Benoit Louis Rose-Dulcina Raphael VUILLERMET The content of the our tooling could be share with other users for a better usage of tools and material CERN wild. 1st December R. Vuillermet & L. Pontecorvo