CMS gas systems meeting

Similar presentations


Presentation on theme: "CMS gas systems meeting"— Presentation transcript:

1 CMS gas systems meeting
Outline Introduction Review achievements during 2013 Review usage of CMS gas M&O 2013 Review of 2013 upgrade projects Agree/Review activities and schedule for 2014 Outline 18/02/2014 R. Guida CERN/PH-DT-DI

2 PH-DT-DI Gas Service Team
Gas Service Team mandate: M&O and upgrades of the gas systems for all the LHC experiments: preventive and corrective maintenance on 30 gas systems on-call service all along the year (24/24 7/7) – phone Construction of gas systems for other experiments at CERN (CLOUD, NA62, LINAC4, …) General support for test beam and equipment belonging to external users. ALICE Albin Wasem ATLAS Frederic Merlet (0.25) Louis-P. De Menezes (0.5) CMS-TOTEM Andrea D’Auria (0.5) LHCb Patrick Carrie (0.5) Steven Pavis (0.25) Coordination R. Guida FSU team Jonathan Dumollard Abdelmajid Laassiri Benjamin P. Marichy Herve Martinati Ace Ordanov (User) Cedric Landraud (also CMS-CO2) Guillaume Lacroix (also CERN Expo) Introduction – Working team 18/02/2014 R. Guida CERN/PH-DT-DI

3 PH-DT-DI Gas Service Team
First contact person for all issues related to CMS gas systems during working hours is in charge of: -standard operation -standard maintenance/small modifications -daily check of all systems CMS-TOTEM Andrea D’Auria CMS experiment and Gas Service Team If Andrea is in holiday or busy: -during working hours  call directly Roberto ( ) -outside working hours  call directly on-call service ( ) Outside working hours  call directly on-call service ( ) 18/02/2014 R. Guida CERN/PH-DT-DI

4 Gas Service working team
In order to cope with LS1 a significant reinforcement of the team during 2013 was needed: two new users with high experience in the workshop (mechanics and gas systems) many students for short and well defined projects Details: CERN FTE (and students > 1 year): 6.3 FTE: +1.3 wrt 2012  Ernesto: TTS 50% for gas project “FSU” (FSU + technical users): 5.5 FTE: +1.5 wrt 2012  Ace: user on ATLAS budget Andrei: user on ALICE budget Trainees (student < 1 year) 1.9 FTE: +1.8 wrt 2012  4 trainees (3 from Poland, 1 from Canada) 2 summer students 2 children of staff members Working team 18/02/2014 R. Guida CERN/PH-DT-DI

5 PH-DT-DI Gas Service Team
2013 activities can be divided into three main sectors: Standard maintenance of gas systems for the LHC experiments LS1 consolidation program for the LHC experiments Not LHC experiments/support to users Standard maintenance and LS1 consolidation program constitute the main field of activity Not LHC experiments and support to users represent about 20% of the activities LS1 – 2013: Overview 18/02/2014 R. Guida CERN/PH-DT-DI

6 Review usage of CMS gas M&O 2013
CMS contribution to M&O budget for gas systems: 157 kCHF On-call service: purifiers RPC, CSC IR RPC SGX5 Supply R134a CSC broken bubbler Distribution RPC, CSC, … Primary Gas Supply monitoring alarm SX5 and 904 mixers CMS gas M&O 2013: on-call 18/02/2014 R. Guida CERN/PH-DT-DI

7 Review usage of CMS gas M&O 2013
On-call service summary On average only 1.5 h/year/system of downtime (power-cuts and outside events excluded) Intervention triggered by: CMS gas M&O 2013: on-call Intervention are: Equally distributed between experiments Decreasing with time  18/02/2014 R. Guida CERN/PH-DT-DI

8 Review usage of CMS gas M&O 2013
CMS gas M&O 2013: material 18/02/2014 R. Guida CERN/PH-DT-DI

9 Review usage of CMS gas M&O 2013
CMS gas M&O 2013: material 18/02/2014 R. Guida CERN/PH-DT-DI

10 Review usage of CMS gas M&O 2013
CMS gas M&O 2013: material for gas workshop 18/02/2014 R. Guida CERN/PH-DT-DI

11 Review usage of CMS gas M&O 2013
CMS gas M&O 2013: FSU resources 18/02/2014 R. Guida CERN/PH-DT-DI

12 Review usage of CMS gas M&O 2013
Summary: CMS gas M&O 2013: summary about 13 kCHF overspending 18/02/2014 R. Guida CERN/PH-DT-DI

13 Review of 2013 upgrade projects
Summary: Upgrade projects 2013: summary Others related to CMS: CMS-TIF lab186: Mixer and distribution for GEM detector Flushing distribution for CO2 cooling plant CMS-TIF CO2 cooling plant construction in gas workshop. 18/02/2014 R. Guida CERN/PH-DT-DI

14 LS1 – 2013 18/02/2014 R. Guida CERN/PH-DT-DI

15 More details available on the excel table in agenda
LS1 – 2014 schedule 18/02/2014 R. Guida CERN/PH-DT-DI

16 Software upgrade Main responsible: Steven Pavis
EN-ICE is preparing the migration to a new software version (CPC6 & more). The migration requires to (~) completely rewrite the code (PLC+PVSS): Preparation phase needed to define strategy and milestons Define modules, test logic, … Validation of one/two gas systems covering almost all functionalities Deployment on one experiment (all detectors) Deployment on all the experiments A complete commissioning will be required (same as it was done at the first start-up of the gas systems) About one-two week of stop/instability for each detector (CSC, DT, RPC, T1, T2, ID flushing, …) Activitiy scheduled from beg. March to June 2014 Software upgrade 18/02/2014 R. Guida CERN/PH-DT-DI

17 Software upgrade Main responsible: Steven Pavis Software upgrade
18/02/2014 R. Guida CERN/PH-DT-DI