MVD updates SUMMARY OF GSI OCTOBER 28th -29th

Slides:



Advertisements
Similar presentations
Duct numbering for EE- Wolfgang Funk - CERN CMS 23/09/ B 06.A07.B 07.A 08.B 08.A 09.B 09.A 10.B 10.A 11.B 11.A 12.B12.A 13.B 13.A 14.B 14.A 1.
Advertisements

Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
CERN TS Department / Civil Engineering Group 8 February 2008 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC/ILC Collaboration Meeting 8 Feb 2008.
OLYMPUS Collaboration Meeting Cooling Water David Rodríguez Piñeiro Mainz University OLYMPUS Collaboration Meeting DESY
Don Lynch 9/15/05 HBD Safety Review 1 Mechanical Design And Installation Hadron Blind Detector (HBD) Don Lynch.
FT Integration Raffaella De Vita INFN – Genova Jefferson Lab 10/15/2013.
SLHC - WP7 Barrel UPDATE on LAYOUT OF SERVICES AT THE BARREL ENDS OPTO PCBS: Sketches describe options after discussion with Tony Weidberg ( ) Preference.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
EE and SE Installation Wolfgang Funk - CERN CMS 11/9/ ) Introduction 2.) Installation scenario 3.) SE schedule, manpower, cost estimates 4.) EE.
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
SSD Status Report July SSD Status Report accessible from STAR group documents Pictures Updated documentation.
INTEGRATION OF THE CBM SILICON TRACKING SYSTEM U. Frankenfeld for the CBM collaboration supported by BMBF, EU-FP7 HadronPhysics3 and CRISP.
John Osborne : GS-SEM Civil Engineering 19 May 2009 Report on behalf of CLIC Civil Engineering and Services (CES) WG CTC 19 May 2009 Tunnel Cross Section.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
S Temple CLRC1 End-cap Mechanics FDR Power Tapes and Optical Fibres Steve Temple, RAL 1 November 2001.
1 Outer Barrel, Phase 2 Mech Review 26 Aug 2013, indico: Antti Onnela, CERN Tracker Phase 2 Mechanics Review, 26 August 2013 Status of the Outer.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
C.BAULT November 9 th  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14  SERVICES AND STRUCTURES INVENTORY  ENVELOPE SERVICES  BARREL SERVICES ROUTING.
Activities of 2008) Jinsook Kim, Yongwook Baek 1.
EMC BWE Proto18 - Orsay Meeting 1 PANDA EMC BWE Proto18 Mikel Catania Goikoetxea, Javier Navarro Medrano, David Rodríguez Piñeiro, Yue Ma, Frank.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
MVD COOLING STATUS-PAST AND UPDATES PIXEL COOLING PROJECT: -STUDIES and TEST on MATERIALS (Carbon Foam) -THERMAL FEM ANALYSES and TEST on DISKS and STAVES.
DCal-ALICE integration and installation plan and status A. Tauro.
MVD COOLING STATUS COOLING PLANT UPDATE: -ADDITION of the NEW CIRCUITS FOR GBT AND DC-DC Converter BOARDS IN THE COOLING PLANT -THERMAL STUDY OF GBT AND.
Central Tracker Cabling and Mechanics Paola Gianotti26/4/111.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Installation of the T600 at Fermilab Fermilab, February 15,
/ 11 Updates of PANDA 3D Model CM June 2016 at GSI, MEC Session J. Lühning, GSI Updates for: Panda Hall Target Spectrometer Latest version.
G. GIRAUDO - D. ORECCHINI Beam-Target line for PANDA – GSI – 4 February 2013 Beam-Target line for PANDA – GSI – 4 February 2013 Central Trackers assembly.
MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE.
- “STRAW TRACKER AND CLASH ITEMS ANALYSIS. - “STRAW TRACKER AND STILL OPENED ITEMS ANALYSIS. - “STRAW TRACKER AND DANGEROUS ITEMS ANALYSIS. INFN-LNF -
MVD COOLING STATUS MVD COOLING PROJECT: CHOICE of COOLING FLUID,
ATLAS Internal ID Service Integration
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
Integration and Services RE3/1 and RE4/1
STRAW TRACKER SYSTEM CAD STATUS :
Service channels between Tracker and PP1
MECHANICAL FRAME OF THE MVD
Integration and Services RE3/1 and RE4/1
Update of MVD services and requests
Beam
MVD Mechanics update EXTERNAL FRAME: NEW DESIGN
ELENA installation and commissioning status
- CT INSTALLATION PROCEDURE OVERVIEW -
Work progress in Turin x the MVD
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
U units for the MVD Close MVD Pixels (Paolo) Strips (Robert and Hans)
STRAW TRACKER CLASH AND INTEGRATION ANALYSIS- INFN-LNF - SPAS
Cooling pipes and Space for Services
Micro Vertex Detector of PANDA Strip Detector
? ENDCAP: Mechanics IFIC-Valencia.
Mechanics: (Tim).
Integration – preliminary ideas on routing and tests
Services Layout – Update
Chamber Design and Integration RE3/1 and RE4/1
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
Work packages status in Torino and perspectives
Mechanics of the MVD Daniela Calvo on behalf of the MVD group
Duct numbering for EE- 09/06/2008 Wolfgang Funk - CERN CMS 1 06.B 07.B
BGC Collaboration Meeting –
Presentation transcript:

MVD updates SUMMARY OF MECH-MEETING @ GSI OCTOBER 28th -29th The MVD has been redesigned – 3D updated model in EDMS Minor changes compared to the old model Services routing under study Locations for pipe holders & manifolds fixed (approval needed) Homework … G. Giraudo MVD Mechanics 09-12-2014

CHANGES & OPEN PROBLEMS CLASHES WITH FRAME not recovered yet STANDARD MICRO FITTINGS CONNECTIONS PIXEL/STRIP DISKS under study – not ready yet G. Giraudo MVD Mechanics 9-12-2014

PIPE HOLDERS SCREWED GLUED? FIXED ON WELDED BOSS? G. Giraudo SMC: POLYURETHANE – NYLON IN HOUSE: ABS WITH 3D PRINTING SCREWED GLUED? FIXED ON WELDED BOSS? G. Giraudo MVD Mechanics 9-12-2014

MANIFOLDS LOCATION WELDED BOSSES This sector of cross pipe contains: 6 welded bosses holding manifolds 4 gluing area for pipe holders or 4 welded bosses for pipe holders disk manifolds suspended on GBT’s frame G. Giraudo MVD Mechanics 9-12-2014

HALF MVD EQUIPPED WITH COOLING PIPES G. Giraudo MVD Mechanics 9-12-2014

MVD FULLY EQUIPPED WITH COOLING SERVICES GBT SECTOR ADDED TO THE SYSTEM (preliminary design) G. Giraudo MVD Mechanics 9-12-2014

THE DC-DC PIPE SECTOR ADDED TO THE SYSTEM POSITION OF THIS FLANGE MUST BE FIXED -VACUUM PUMP- HOW CAN WE HOLD THE WHOLE SYSTEM? HOW CAN WE TRANPORT THE WHOLE SYSTEM TO THE EXPERIMENTAL AREA? G. Giraudo MVD Mechanics 9-12-2014

PPs location HOMEWORK Evaluation of the services cross section PatchPanels design Cooling Pressure sensors Optical Fibres Cables Routing from racks to PPs & to MVD G. Giraudo MVD Mechanics 9-12-2014

HOMEWORK Patch panels Pixel modules Strip modules HV LV Racks GBT To CR Optical fiber 1.5V 2.5V Sense wire Beam pipe DCDC Power supplies control Section A Section D Section A1 Signals Section A2 Section B Section C G. Giraudo/T. Quagli MVD Mechanics 9-12-2014

Summary - Services Occupancy Section name HV Optical fibers LV GBT LV FEE Total A 477 1.3 633 28.4 396 1 317 20 25 8.5 1418 42.5 50 7 1924 49.5 300 7.5 13226 130 1248 17518 149.5 A1 X 948 4292 74 A2 Cable number Cable diameter [mm] Total cable section [mm2] Equivalent diameter [mm] No safety margin has been applied G. Giraudo/T. Quagli MVD Mechanics 9-12-2014

Summary - Services Occupancy Section name HV Optical fibers LV GBT LV FEE Signal Total B 477 1.3 633 28.5 396 1 317 20 25 8.5 1418 42,5 50 7 1924 49,5 3584 0.75÷1.3 2579 57,3 4532 - 6871 93,5 C X 471 3659 68 D 230 0.5x10÷14 1502 4291 4714 Cable number Cable diameter [mm] Total cable section [mm2] Equivalent diameter [mm] No safety margin has been applied G. Giraudo/T. Quagli MVD Mechanics 10-03-2014

Welded bosses on the cross/beam pipe (to be approved – HESR group) SUMMARY Welded bosses on the cross/beam pipe (to be approved – HESR group) Assembly location & transport (to be decided – collaboration) Assembly sequence & tooling (to be decided – collaboration) PatchPanels design & location (MVD group – homework) Services routing from MVD to racks (MVD group – homework) G. Giraudo MVD Mechanics 9-12-2014

G. Giraudo MVD Mechanics 10-03-2014

G. Giraudo MVD Mechanics 10-03-2014