Global Design Effort - CFS 11-18-09 ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.

Slides:



Advertisements
Similar presentations
Global Design Effort - CFS 13 December 2012 PAC Review - KEK 1 PAC Review CONVENTIONAL FACILITIES AND SITING A. Enomoto, V. Kuchler, J. Osborne.
Advertisements

Nov. 17, 2008 ILC08 Global Design Effort 1 Americas KlyCluster Cost Analysis Overview Tom Lackowski RF & Sum reported by Peter H. Garbincius.
Nov. 19, 2008 ILC08 Global Design Effort 1 Status Report Alternative Siting and Tunnel Design Tom Lackowski.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas Tunnel Life Safety and Egress Accelerator.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
3/2011 CFS BTR Global Design Effort 1 Americas Region Civil Design Tom Lackowski.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
ILC Mechanical & Electrical Review Conventional Electrical System Americas Region Design Summary March 21, 2012 Randy Wielgos, FNAL Parsons Electrical.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
ILC CFS AD&I Daresbury Lab Summary J.Osborne / V.Kuchler / A.Enomoto.
Global Design Effort - CFS SiD Collaboration Meeting - SLAC 1 VERTICAL ACCESS ILC IR LAYOUT for SiD and ILD CONVENTIONAL FACILITIES AND SITING.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas CFS AD&I Status Report Conventional.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
WBS x.11 Conventional Facilities Americas Region ILC Fermilab ART Meeting1 Conventional Facilities and Siting Global Group Americas Region FY.
Fred Asiri1 Conventional Facilities SLAC April 9, 2006 Acknowledgment: Clay Corvin, Jerry Aarons, and Jonghoon Kim.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Global Design Effort - CFS Accelerator Advisory Panel Review - Oxford UK 1 ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS 1 DRAFT CFS Global Meeting 29 July 2009 CONVENTIONAL FACILITIES AND SITING GROUP : Safety documents Safety documents 3d modeling.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
AS TAG Leaders Meeting PM Report. Topics R&D Plan release 4 ADI WebEx meetings (cost and design) Central region integration face-to-face meetings.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS AD & I Meeting - DESY AD & I Meeting - DESY 1 AD&I Meeting CONVENTIONAL FACILITIES AND SITING GROUP Main Linac Tunnel.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Conventional Facilities and Siting GG Global Design Effort BILCW 07 - Beijing1 Conventional Facilities and Siting Global Group Summary Report.
PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 1 Cost Estimating for the AD&I Studies X Differential Estimates What we need from you! Peter.
Global Design Effort - CFS Oct IWLC ML Single Tunnel Cross Section GDE Asian Regional Team KEK A. Enomoto.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
1 of 5 CONVENTIONAL FACILITIES & SITING GROUP PROGRESS OVERVIEW J.L. Baldy, A. Enomoto, V. Kuchler V. KUCHLER GDE Executive Committee Meeting
Global Design Effort - CFS ILC Source/RTML/BDS + MDI Technical Baseline Review October ILC SOURCES/RTML/BDS + MDI TECHNICAL BASELINE.
Global Design Effort Working Groups A & C Parallel Session Summary IRENG07 A. Herve, T. Markiewicz, T. Sanuki, Y. Sugimoto V. Kuchler, A. Enomoto, J. Osborne.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne.
Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May ML Single Tunnel Configurations In Deep Underground Accessed with Long.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP IWLC10.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Conventional Facilities and Siting Global Group (ARCFS)
Installation Global System
Conventional Facility & Siting (CF&S) Overview for the Positron Source
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Americas KlyCluster Cost Analysis Overview
CLIC / ILC Collaboration for CFS works
Latest ILC tunnel cross section May 2017
CONVENTIONAL FACILITIES presented by Peter H. Garbincius
ILC GLOBAL SYSTEMS MEETING
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
ILC CFS AD&I Daresbury Lab Summary
Technical Design Report preparation
Tom Lackowski Revised 10/12/2011
ILC - Global Design Effort
Presentation transcript:

Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status Report V. Kuchler, J. Osborne, A. Enomoto

Global Design Effort - CFS ILC CFS and Global Systems Meeting Overview Status of Drawings Status of Drawings Status of Cost Estimates Status of Cost Estimates Status of CFS Portion of AD&I Proposal Document Status of CFS Portion of AD&I Proposal Document 2

Global Design Effort - CFS ILC CFS and Global Systems Meeting Status of Drawings Beamline Layout Received from N. Collomb in Mid-October Based on Available Lattice and Beamline Information Beamline Layout Received from N. Collomb in Mid-October Based on Available Lattice and Beamline Information CFS Drawings are Based on this Beamline Information with the Addition of the Dimension to Equalize Timing Issues CFS Drawings are Based on this Beamline Information with the Addition of the Dimension to Equalize Timing Issues This Layout is Established as the Baseline for the AD&I Proposal Document and Cost Estimates This Layout is Established as the Baseline for the AD&I Proposal Document and Cost Estimates FNAL Has Completed: FNAL Has Completed:  A Complete 2D Machine Layout Drawing in AutoCAD Format in Small Scale  A Drawing Set, at Intermediate Scale, of the Central Region  A Revised Version of the Overall RDR Schematic Machine Layout Drawing  A Revised Beamline “Arrow Diagram” 3

Global Design Effort - CFS ILC CFS and Global Systems Meeting Status of Drawings cont. All Drawings will be Posted to the EDMS System for Review by Area and Technical Systems All Drawings will be Posted to the EDMS System for Review by Area and Technical Systems The 2D Machine Layout Drawing will be the Basis for the 3D CFS Enclosure Drawing that will be Developed by the CFS Effort at CERN Using the European Cavern Configuration The 2D Machine Layout Drawing will be the Basis for the 3D CFS Enclosure Drawing that will be Developed by the CFS Effort at CERN Using the European Cavern Configuration The 2D Machine Layout Drawing will also be the Basis for the 3D Support Utility Drawings that will be Developed by the CFS Effort at FNAL (M+W Zander) The 2D Machine Layout Drawing will also be the Basis for the 3D Support Utility Drawings that will be Developed by the CFS Effort at FNAL (M+W Zander) When Completed, 3D Drawings will be Forwarded to DESY for Inclusion into the Complete ILC 3D Model When Completed, 3D Drawings will be Forwarded to DESY for Inclusion into the Complete ILC 3D Model The CFS Goal is to have the 3D Drawings Completed in Time for the AD&I Meeting at DESY The CFS Goal is to have the 3D Drawings Completed in Time for the AD&I Meeting at DESY 4

Global Design Effort - CFS ILC CFS and Global Systems Meeting Status of CFS Cost Estimates The Americas Region has Developed the Following Cost Estimates and Provided Them to the Cost Group: The Americas Region has Developed the Following Cost Estimates and Provided Them to the Cost Group:  Full Cost Estimate Based on the Machine Layout Developed for the ALCPG 09 Meeting in Albuquerque  Main Linac Klystron Cluster High Power Option  Main Linac Klystron Cluster Low Power Option  Main Linac DRFS High Power Option  Main Linac DRFS Low Power Option  Main Linac Tunnel Alternative Study The Full Cost Estimates, Based on the New 2D Machine Layout Drawing and Both Klystron Cluster and DRFS (High and Low Power) has been Completed and Provided to Peter Garbincius The Full Cost Estimates, Based on the New 2D Machine Layout Drawing and Both Klystron Cluster and DRFS (High and Low Power) has been Completed and Provided to Peter Garbincius The Asian Region has Developed a Preliminary Cost Estimate for the DRFS High Power Option The Asian Region has Developed a Preliminary Cost Estimate for the DRFS High Power Option 5

Global Design Effort - CFS ILC CFS and Global Systems Meeting Status of CFS AD&I Proposal Document Text for the CFS Portion of the AD&I Proposal Document has been Developed, Reviewed and Iterated. Text for the CFS Portion of the AD&I Proposal Document has been Developed, Reviewed and Iterated. Version 4 will be Provided to the N. Toge and the Project Managers this Week Version 4 will be Provided to the N. Toge and the Project Managers this Week Version 4 will Include the Following Drawings: Version 4 will Include the Following Drawings:  Asian Region Main Linac Tunnel Cross Section  Americas Region Main Linac Tunnel Cross Section  European Region Main Linac Tunnel Cross Section  3D Drawing Example  Schematic Machine Layout Drawing  Beamline “Arrow Diagram” 6