USAID Afghanistan Engineering Support Program (ESP) Pre-Bid Meeting July 14, 2015.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

TITAN Group …….Managing Site Build up for the telecom sector TICS Telecom Projects Consultancy Pvt. Ltd.
TQM Study in Royal Commission of Jubail CEM 515. Purpose of the royal commission Is to develop, construct and maintain the infrastructure of Jubail-2:
Managing a Successful Mechanical System project Following design – what next?
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
OKLAHOMA TURNPIKE AUTHORITY Request For Proposals Pre Bid Meeting.
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
1 Preconstruction Site investigation, Scheduling, Estimating, and design Preconstruction Site investigation, Scheduling, Estimating, and design Prepared.
ESTIMATING By Laith Jacob.
Design & Layout of Foodservice Facilities
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
Standards of Practice Course
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
Boreal Renewable Energy Development Ferriter Scobbo & Rodophele PC Outback Engineering Richard C. Gross, Inc. March 12, 2009 Notus Clean Energy LLC Wind.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
Project Development Decision Tree PermittingIn-house Reqmts.Energy SalesFuel Consumption Plant Configuration Risk AssessmentCapital Costs Schedule Constraints.
Fundamentals of Project Management A complete flow.
King Fahd University of Petroleum & Minerals
Creating A Cleaner Energy Future For the Commonwealth Renewable Closed Landfills Eileen McHugh Municipal Energy Programs Coordinator July 26,
Procurement Authority Representative Roles and Responsibilities Amanda Price, Program Development Coordinator, Planning and Programming, Transportation.
Chapter 11 Construction Engineering. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Overview Marty Fallier, Conventional Facilities Director ASAC Meeting July 18, 2008.
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
Sydney (02) Melbourne (03) Brisbane (07) Carlo Biaro Capital Insight Conference 2013 – Tools and.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
VOWTAP Progress Report VOWDA December 2, DOE Grants VOWTAP Extension No Cost Time Extension until May 31, 2016 Conditional upon achievement of two.
U.S. Army Corps of Engineers (USACE) AEC Utility Monitoring And Control Systems and Electronic Security Systems (UMCS)(ESS) Prepared for: Energy Huntsville.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
BI-19 Process Improvement Sea Water Injection Department.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
McDonough Bolyard Peck 1 CEFPI’s 81’st Annual International Conference PROJECT QUALITY MANAGEMENT by Edward M. Kopp and James Yatzeck.
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
What does a Civil Engineer do?
Engineering a Good Project Drew Seaman. Engineering: the work of designing and creating large structures (such as roads and bridges) or new products or.
Richland Creek Water Supply Program Update Paulding County, Georgia Board of Commissioners Work Session March 08, 2016.
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
EASTERN MUNICIPAL WATER DISTRICT Public Access Areas Renovation Project – Update Debbie Hoffman, PE Civil Engineer II March 23,
Energy and Environmental Solutions Company Confidential—Siemens Building Technologies 2008 SLS 242/342: Performance Contracting - Proposing Opportunities.
Nyc Build it back RFB Furnishing All Labor and Material Necessary and Required for residential construction services July 24, 2017.
Director’s Progress Review Closeout Meeting
Progress Briefing - Energy Initiative
BIM EXECUTION PLANNING PROCESS
Quail Valley Subarea 9, Phase 1 Sewer Award of Construction Contracts
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Cottonwood Recycled Water Pipeline (West)
Pre-Construction Services
9/18/2018 Bids CONTRACTING Khamis…..
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Designers’ Manual Overview and Chapter Contents
Designers’ Manual Appendix Contents
BIM EXECUTION PLANNING PROCESS
CF Organization & Schedule
Director’s Progress Review Closeout Meeting
JEFFERSON LAB LCLSII CRYOPLANT INSTALLATION PACKAGE DIRECTOR’S PROGRESS REVIEW Welcome and Introduction Stuart Henderson June 1, 2017.
David Salazar, Chief Facilities Executive
Meeting of the LCLS Facilities Advisory Committee
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Introduction DEFINATION :-
DBIA Manual of Practice
BI-19 Process Improvement
CONVENTIONAL FACILITIES LCLS Office Space Procurement
Chapter 6 Site Construction.
Phase 1 Statement of Work Preconstruction “Plan The Work”
CMGC Overview SLAC Site Plan Systems Description Construction Schedule
Q2 Updates on 2019 Board Priorities
Q2 Updates on 2019 Board Priorities
Presentation transcript:

USAID Afghanistan Engineering Support Program (ESP) Pre-Bid Meeting July 14, 2015

Introduction UAID Afghanistan has a $1 billion infrastructure portfolio that encompasses energy, water, natural resources, transportation and building projects. This presentation is intended to provide bidders with examples of the type of work they can expect. This presentation is not intended to limit the scope of work to the examples provided. Bidders should refer to Statement of Work, C.4 for Detailed Work Requirements Bidders should refer to Statement of Work C.9 for the Project Management/Job Order process

Infrastructure Overview Energy Sector Power Transmission and Connectivity (PTEC) Northern Electric Power Supply (NEPS) Southern Electric Power Supply (SEPS) Salang Tunnel Substation Clean Energy Program Kajaki Dam Turbine 2 Installation and Commissioning Transport Sector Gardez-Khost Road Phase 4 Salang Passage Routine Maintenance-Emergency (O&M) Water Sector Rural Water Supply and Sanitation Program Natural Resources Mining and Extractives (MIDAS) Shebergan Gas Development Program (SGDP)

Afghanistan Energy Map

Examples of Engineering Services Electrical Substation Design Services –Site Selection Civil location drawings Geotechnical investigation Site Surveys –Substation Conceptual Design Conceptual design and demolition drawings Grading plans Single line diagrams General arrangement plans Substation elevations –Substation Pricing Schedules

Examples of Monitoring Services Quality Assurance Verification Material Test Evaluation Equipment Submittal Review Change Proposal Review Payment Request Review Substantial Completion Inspection Final Inspection –Deficiency Correction Review

Procurement Phase Services Request For Proposal (RFP) Package Preparation Pre-bid Meeting Coordination Response to Bidder Questions Evaluation of Bids Recommendations for Award Preparation of Contract

Construction Project Management Owner’s Representative Services Project Planning Conceptual Budget Estimating Value Engineering and Alternatives Analysis Design Phase Constructability Analysis Contractor Baseline Schedule Evaluation Change Order Analysis Progress Payment Evaluation Project Cost Control Reporting

Pre-fabrication Inspection - Towers

Structural Inspections

Testing Galvanizing on Tower Supports

Material Test Evaluation

Quality Assurance - Field Verification

Material Field Testing

Kajaki Hydroelectric Turbines

Lab testing

Electrical Inspections