1 DBIA Manual of Practice

2 BIM & Lean in Design-Build Project Delivery
Presentation Outline Introduction / Overview BIM in the RFP Process Aesthetic concepts Conceptual site plan and site constraints Program space requirements Performance specification Full bridging documents

3 BIM & Lean in Design-Build Project Delivery
(Presentation Outline continued) BIM in the Proposal Submission/Evaluation Design to a Budget – Target Value Design (TVD) BIM as a communication tool BIM after contract award Project Closeout Key Takeaways Questions

4 What is BIM? Building Information Modeling
Describes All Aspects of the Project It’s More than 3-D Modeling 4-D Scheduling 5-D Cost 6-D Operations

5 What is Lean? A process of adding value while eliminating waste
Learning – Continuous Improvement What’s Lean about Design-Build? Designers and builders working side by side Designing once to how we want to build it Coordination that eliminates waste (like RFI’s) 3-D Imagery for quick decision making Utilizing BIM models for cost estimating Designing to a cost (TVD) Set Based Design (Selecting systems for their value)

6 BIM in the D-B process Owner Visualization Tool
Utilized in the RFP Process D-B Team RFP Submission Proposal D-B Team communicates utilizing BIM Visual depiction of proposed concept Incorporated Into Design/Construction 3-D Modeling – clash/coordination 4-D Scheduling/5-D cost Operations

7 BIM & Lean in Design-Build Project Delivery
Design-Build Procurement Process Defining the Program Request for Qualifications (RFQ) Request for Proposal (RFP) Proposal Submission and Evaluation Contract Award Documentation/Construction Closeout

8 BIM in the RFP Process Aesthetic Concepts
Conceptual Site Plan and Site Constraints Program Space Requirements New construction area requirements Repurposed/remodeled spaces Performance Specification Program adjacencies Full Bridging Documents Plans, elevations, and specifications

9 Aesthetic Concepts Renderings

10 Aesthetic Concepts Renderings

11 Aesthetic Concepts Renderings – Before BIM

12 Conceptual Site Plan and Site Constraints
Aerial 3-D Image Enhances Cut & Fill Accuracy

13 Conceptual Site Plan and Site Constraints Site Location
Site Topography

14 Conceptual Site Plan and Site Constraints Site Access Constraints

15 Conceptual Site Plan and Site Constraints Project Overview

16 Conceptual Site Plan and Site Constraints Site Constraints

17 Program Space Requirements
New Construction Area Requirements

18 Performance Specification
Example Specification Items LEED certification level Energy requirements (Net Zero Energy) Daylighting Seismic performance Security levels Parking requirements Program adjacency requirements Net square footage requirements per department Floor loading requirements Contractual requirements Stipulated sum budget

19 Performance Specification
Program Adjacency Requirements

20 Performance Specification
Site Plan Layout 3-D Space Planning Layout

21 Performance Specification
Energy Performance - Zero Net Energy Prescriptive Program and Site Layout

22 Full Bridging Documents
Program Completed Plans Provided For All Levels Rooms Specified

23 Full Bridging Documents
Program Completed Plans Provided for All Levels Rooms Specified

24 Full Bridging Documents
Conceptual Interior Renderings

25 Full Bridging Documents
Nearly 100 Sheets of Drawings Plus Narratives/Specs Required for Security and Operations

26 BIM in the Proposal Submission/Evaluation
Align the Design Approach with the Owner’s Values Design to a budget – Target Value Design (TVD) BIM as a Communication Tool Produce multiple design options Massing Materials Orientation Side by side comparisons Price options

27 Design to a Budget - TVD What if we design to a detailed budget rather than budget to a detailed design? Identify Costs and BIM Goals Cost estimating Quantity takeoffs Scheduling Model sharing

28 Set Based Design Select system based on value
Design to a Budget - TVD Set Based Design Select system based on value

29 Sharing Models With Trade Partners
Design to a Budget - TVD Sharing Models With Trade Partners

30 BIM as a Communication Tool
BIM renderings to validate owner’s vision BIM as a communication platform

31 BIM as a Communication Tool

32 BIM as a Communication Tool
BIM renderings to validate owner’s vision BIM as a communication platform

33 BIM as a Communication Tool
BIM interior renderings provide design options BIM virtual office tour

34 BIM as a Communication Tool
BIM in Progressive (Collaborative) Design-Build

35 BIM as a Communication Tool
BIM in Progressive (Collaborative) Design-Build Validate the cost and the vision

36 Hospital Fly Through Video

37 BIM After Contract Award
BIM strategy for project production Project coordination for all disciplines/trades 3-D modeling plus 4-D (scheduling), 5-D (cost), and 6-D (operations) Utilize fabrication models for VDC (virtual design and construction) Shared model between designers & builders Promotes prefabrication Construction planning and sequencing

38 BIM After Contract Award
BIM modeling for site logistics Coordinate utilities, material lay-down area, crane location, staging area, site traffic flow, etc.

39 BIM After Contract Award
4-D schedule simulation provides an accurate forecast for site planning

40 BIM After Contract Award
3-D fabrication model allows for prefabrication Prefabrication speeds installation and construction schedule

41 Prefab Main Electrical Room Underground Conduits Video

42 BIM After Contract Award
BIM utilized for virtual design and construction Fabrication models can provide accurate vision of final product

43 BIM After Contract Award
BIM utilized for virtual design and construction Fabrication models can provide accurate vision of final product

44 BIM After Contract Award
3-D MEP fabrication model allows for coordination with structure, architecture, and equipment Prefabrication reduces installation time and total construction schedule

45 Laser Scan to BIM Model Fly Through Video

46 BIM After Contract Award
4-D modeling produces visual schedules

47 BIM After Contract Award
BIM modeling enhances construction scheduling

48 BIM After Contract Award
3-D modeling produces virtual mockups 3-D viewer/virtual reality Virtual walk-through Establishes alignment and common understanding

49 Jobsite 3-D Viewer Video

50 Project Closeout Develop and Update As-Built Model
Space Management Report Operation & Maintenance Documentation

51 High School Fly Through Video

52 BIM in D-B: Key Takeaways
BIM is a key component in all phases of the design-build procurement process Effective communication/collaboration platform More accurate information leads to lower contingency and lower cost BIM/VDC reduces schedules through coordination and prefabrication BIM provides a cost effective tool for owner visualization Quicker decision from 3-D models

53 Questions?