Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.

Slides:



Advertisements
Similar presentations
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété
Advertisements

Part I What is a Master’s Degree? DIFFERENCES FROM UNDERGRADUATE STUDIES  Fewer courses each semester  Courses more independently driven  Much more.
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
Proposal for ½ MW photo-fission driver based on TESLA 1.3 GHz SCRF technology (Shane Koscielniak, 09 Nov 2007) Electron Linac CANADA ’ S NATIONAL LABORATORY.
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
Manage Assessment. Assessment Setup Head of Department(HOD) to setup weightages 1. Student Assessment Setup the assessment types and sub component, e.g.
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
Proposal for ½ MW photo-fission driver based on TESLA 1.3 GHz SCRF technology (Shane Koscielniak, 09 Nov 2007) Electron Linac CANADA ’ S NATIONAL LABORATORY.
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
An overview of the electronic work permit system in use at the ISAC facility ISAC Electronic Work Permit System Rob Shanks, TRIUMF, Vancouver CANADA,
LMR Fall Release 11/2/2012. Notes: Placeholders and Accelerator Keys Users of the LMR have requested a way to define a placeholder within a Note or Custom.
James Inkster, Msc., SFU/TRIUMF Simplifying the Preparation of 18 F-based Biomolecular Imaging Agents Through ‘Click’ Chemistry CANADA’S NATIONAL LABORATORY.
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
SRF Activities at TRIUMF & PAVAC
GRID job tracking and monitoring Dmitry Rogozin Laboratory of Particle Physics, JINR 07/08/ /09/2006.
Steven McDonald May TRIUMF Site Report CANADA’S NATIONAL LABORATORY FOR PARTICLE AND NUCLEAR PHYSICS Owned and operated as a joint.
EMI SA2: Quality Assurance (EMI-SA2 Work Package) Alberto Aimar (CERN) WP Leader.
SERVICE MANAGER 9.2 CHANGE PRESENTATION JUNE 2011.
CANADA’S NATIONAL LABORATORY FOR PARTICLE AND NUCLEAR PHYSICS Owned and operated as a joint venture by a consortium of Canadian universities via a contribution.
Canada’s National Laboratory for Particle and Nuclear Physics Laboratoire national canadien pour la recherche en physique nucléaire et en physique des.
Databases at TRIUMF Andrew Wong CANADA’S NATIONAL LABORATORY FOR PARTICLE AND NUCLEAR PHYSICS Owned and operated as a joint venture by a consortium of.
How to use TREx 1 Disclaimer: TREx under development, minor modifications may occur pending final release. Prepared for Education Service Center TREx Training.
Manage Assessment. Assessment Setup Head of Department(HOD) to setup weightages 1. Student Assessment Setup the assessment types and sub component, e.g.
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
Popular Canadian Univerisities and Colleges Sorted By Province Tommy Sheppard, M.Ed (counselling)
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
LABORATOIRE NATIONAL CANADIEN POUR LA RECHERCHE EN PHYSIQUE NUCLÉAIRE ET EN PHYSIQUE DES PARTICULES Propriété d’un consortium d’universités canadiennes,
The Most Exotic Nuclei on Earth: Precision Experiments on Halo Nuclei Maxime Brodeur UBC graduate student, TRIUMF for the TITAN collaboration CANADA’S.
January 18, 2013 All Hands January ARIEL Completion and the next 5 Year Plan.
WebScan Change Order. WebScan change order: What is it? Beginning in 2010 changes to a WebScan order will need to be submitted via a WebScan change order.
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
Management Tools K. Pommès. Management Tools - The Project Planning Design Purchasing Production Installation To follow the project through its phases.
December 15, 2015 Welcome to the Wisconsin Test Administration Training and Q&A Session The ACT and ACT WorkKeys Please Call: (844) An operator.
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
HORIZON 2020 Amendments to the Grant Agreement. Consequences The amended provisions become an integral part of the GA All other provisions remain unchanged.
M.C. Vetterli; SFU/TRIUMF Simon Fraser ATLASATLAS SFU & Canada’s Role in ATLAS M.C. Vetterli Simon Fraser University and TRIUMF SFU Open House, May 31.
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
Canada’s national laboratory for particle and nuclear physics and accelerator-based science New insights for reaching higher gradients from muSR sample.
Supercool Neutrons (Ultracold Neutrons) Jeff Martin University of Winnipeg Skywalk 2007 research supported by Natural Sciences and Engineering Research.
Compliance Management System. Intelex System Overview Focus Modules: –Permits Management –Monitoring & Measurement –Training Management –Document Control.
Moshe Shechter | Alma Product Manager
AFMC Student Portal Presentation for Placement Contacts
Master’s Degree Programs in Canada
Update on CAPPA, NASPAA, and APPAM
Welcome to RACER 2.7 A New World for Patrons
Subatomic Physics Detector Lab
TCP LIMS – Animal Use Protocol Management
tdct – a Capfast replacement
Welcome to the Nevada Test Administration Training and Q&A Session
TRIUMF Failure Investigation Tool
Michigan Department of Education ACT WorkKeys® Q&A Session
Orders & Shipment Tracking
Enhancement Notification Release 5.4
E-RATE PROGRAM TRIBAL APPLICANT TRAINING
TimeClock Plus v7 Manager Training.
ETS – Air Data submission Training
ESSnet on Linked Open Statistics
Workshop commissioning Installation Coordination at ESS
R.Keitel Epics Collaboration Meeting, Padova, Oct. 2008
Business Zone – User Guide
Online Course Change Request Submission
HelloSign + CAMS Lucas Simmons. HelloSign + CAMS Lucas Simmons.
Overview of the POC EID Training Toolkit
Technology Maintenance
Provider Maintenance—Accreditation Module
Presentation transcript:

Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété d’un consortium d’universités canadiennes, géré en co-entreprise à partir d’une contribution administrée par le Conseil national de recherches Canada Canada’s national laboratory for particle and nuclear physics Laboratoire national canadien pour la recherche en physique nucléaire et en physique des particules Accelerating Science for Canada Un accélérateur de la démarche scientifique canadienne Work Request System Violeta Toma | TRIUMF ARW – Melbourne, April 14-19, 2013 Run until Break / Preventative maintenance Session

Outline Maintenance philosophy in TRIUMF Maintenance tools: Work Request (WR) and Work Permit (WP) Work Request Integration Work Request with fault report system Future: integration with Work Permit system Summary

Maintenance Philosophy Past: scheduled weekly maintenance Present: o scheduled maintenance every three weeks o optional weekly maintenance (if required)

Maintenance Tools Work Request (WR) Work Permit (WP) Common traits: Web-applications Accessible site-wide Used to manage approvals/assessments

Work Request versus Work Permit Work Request (WR) used to: Inform about Changes to Commissioned Systems (CCS) Inform about new installations Request work to be done by one or more groups Help groups with their internal work organization Monitor work progress Provide an official record of approvals for regulator

Work Request versus Work Permit Work Permit (WP) used to: Coordinate work on maintenance days Inform workers of hazards and ways to mediate them Inform operators of work and work status Provide verification of completed work if appropriate

Filling out a Work Request

Adding a Document WR system does not store documents, just references them Hyperlinks to documents/drawings can be embedded into WR Drawback: linked document can be changed after approval

Work Request States Working Pending Released Closed Abandoned

Navigating the Work Request

Work Request for Facility Coordinator

Facility Coordinator Approval Correct/all facilities Correct/all service groups Hazard analysis assessment Indicate when work can commence

Work Request for Service Group Leader

Service Group Leader Assessment Is this a Change to a Commissioned System Hazard analysis assessment Correct/all service groups Enough information to do the work Realistic deadline

Work Request for Worker

Integration with Fault Report System Interaction via web-services Optional Initial setup by a superuser -> Fault Report package Functionality New Fault Report => task in the Fault Report package Modification of a fault (return, cancellation, redirection) will modify the fault task in the Work Request system. If a fault task is completed in the Work Request system, the fault will be returned to the Fault Report system. If a fault task is abandoned, the fault will be rejected in the Fault Report system, i.e. sent back to Operations.

Integration with Work Permit System ?? This page intentionally blank…

Summary One work request to multiple groups Standard form for Change to Commissioned Systems Easy to follow the work status Official record for regulator Possibility to integrated with other systems

Acknowledgements Glenn Jones - MIS & Telecom: Implementation Maintenance Rolf Keitel – Implementation manager - Quality Management System: Wrote specifications Supervised implementation Conducted commissioning Conducted site-wide information sessions for each user type Maintenance

Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété d’un consortium d’universités canadiennes, géré en co-entreprise à partir d’une contribution administrée par le Conseil national de recherches Canada Canada’s national laboratory for particle and nuclear physics Laboratoire national canadien pour la recherche en physique nucléaire et en physique des particules Thank you! Merci TRIUMF: Alberta | British Columbia | Calgary Carleton | Guelph | Manitoba | McMaster Montréal | Northern British Columbia | Queen’s Regina | Saint Mary’s | Simon Fraser | Toronto Victoria | Winnipeg | York

Maintenance Tab