V Review SPARC 4-10-2004 Diagnostic & Control Status G. Di Pirro On behalf control and diagnostic group.

Slides:



Advertisements
Similar presentations
Bunch Compressor 3 Torsten Limberg for Frank Stulle et al.
Advertisements

Bunch shape monitor for Linac-4 A.V.Feschenko Institute For Nuclear Research (INR), Moscow , Russia.
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
David H. Dowell Injector April 29-30, 2004 LCLS Injector Overview D. H. Dowell, SLAC FAC Review April 29-30, 2004 Injector.
Low Emittance Program David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education CesrTA.
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
February 17-18, 2010 R&D ERL James Jamilkowski R&D ERL Controls Larry Hoff James Jamilkowski February 17-18, 2010 Controls.
ITS Subsystems Availability MACS Week, June 2011 E. Sargsyan PP a-ESA_ITS_MACS_Week_June2011.pptm E. Sargsyan ITS Subsystems Availability 1.
SCADA and Telemetry Presented By:.
IP-BPM NOV. BEAM TEST RESULTS Siwon Jang (KNU). 11cm Low-Q IP-BPM design  11cm Low-Q IP-BPM drawings of HFSS 100mm Sensor cavity Wave guide Antenna Designed.
AWAKE electron source New Electron Source WP at CERN
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Influence of the Third Harmonic Module on the Beam Size Maria Kuhn University of Hamburg Bachelor Thesis Presentation.
Low Emittance RF Gun Developments for PAL-XFEL
LCLS Accelerator SLAC linac tunnel research yard Linac-0 L =6 m Linac-1 L  9 m  rf   25° Linac-2 L  330 m  rf   41° Linac-3 L  550 m  rf  0°
Beam diagnostics in the beamlines
Booster Top-off Computer Controls System C. Timossi November 22, 2004.
G5 Beam Instrumentation D. Gassner, E. Pozdeyev 4-09.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
NSLS-II Transfer Lines BUDKER INSTITUTE OF NUCLEAR PHYSICS NOVOSIBIRSK.
HIE-ISOLDE diagnostic boxes Esteban D. Cantero CERN BE-BI-PM HIE-ISOLDE meeting for BE/BI 28 March 2014 The research leading to these results has received.
T. Limberg Position of the 3rd Harmonic System. Injector (with first Bunch Compression Stage) 2 European XFEL MAC May 2010 T. Limberg.
17th July 2008#4-CTF3 Committee1 CA.BHB 0400CA.SNH 0110CA.SNI 0120 CA.VVS 0100 CA.DHG/DVG 0130 CA.VVS 0200 CA.MTV 0215 CA.BPM 0220 CA.DHG/DVG 0225CA.SNG.
BPM stripline acquisition in CLEX Sébastien Vilalte.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
4. Operations and Performance M. Lonza, D. Bulfone, V. Forchi’, G. Gaio, L. Pivetta, Sincrotrone Trieste, Trieste, Italy A Fast Orbit Feedback for the.
Experience with Novosibirsk FEL Getmanov Yaroslav Budker INP, Russia Dec. 2012, Berlin, Germany Unwanted Beam Workshop.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
High intensity electron beam and infrastructure Paolo Valente * INFN Roma * On behalf of the BTF and LINAC staff.
11th February th CTF3 Committee - Wilfrid Farabolini1 Status and progress of the CTF3 probe beam 1.
Lesson 1 PLC BASICS. PLC Definition  Programmable Logic Controllers are industrial computers that control machine and other applications.  PLC have.
MicroTCA Development and Status
NICA injection complex status
SESAME Control System Status
Expected hardware status and Priority of the commissioning task
Diagnostic & Control Status
Summary of SPARC first-phase operations
Integration of the e+ elements
PHIL: A TEST BEAMLINE AT LAL Specifications of PHIL
l 66TH MEETING OF THE ESRF l May 2014 l Author
Slice Parameter Measurements at the SwissFEL Injector Test Facility
BE-BI Software for LINAC4
Have a chance to operate your own beam at CERN
352MHz Klystron Control for the 3MeV Linac test stand
Diagnostics for ThomX Nicolas HUBERT, Marie LABAT, Moussa EL-AJJOURI, D. PEDEAU, Synchrotron SOLEIL Iryna CHAIKOVSKA, N. DELERUE, LAL.
Installation status and planning
AWAKE status and readiness for phase #2
Photon beamline crates
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
ERL BPM System Mike Billing, Mark Palmer
PERSPECTIVE ON MICROWAVE MONITOR AND CONTROL INTERFACES
Electron Source Configuration
Advanced Research Electron Accelerator Laboratory
Linac/BC1 Commissioning P
Compact linear accelerator FLUTE: status update
High Level applications development status
LCLS Commissioning P. Emma, et al
High Level Physics Applications for LCLS Commissioning
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
Breakout Session SC5 – Control Systems
Diagnostics RF and Feedback
Linac Diagnostics Commissioning Experience
Diagnostics overview Beam profile monitors Cherenkov radiators Summary
Proposal for Smith-Purcell radiation experiment at SPARC_LAB
Injector Diagnostics Status
J. Seeman Perugia Super-B Meeting June 2009
Status of DESY-PSI-CERN collaboration on development of X-band TDS with variable polarisation: PolariX-TDS Alexej Grudiev on behalf of Polarix-TDS collaboration.
Isotope Readiness Review Run Plans
Presentation transcript:

V Review SPARC Diagnostic & Control Status G. Di Pirro On behalf control and diagnostic group

V Review SPARC Diagnostics GUN Emittance BPM Charge Emittance measure RF deflector Energy and Energy spread

V Review SPARC Final project V. Lollo

V Review SPARC Target We buy the YAG target and start the design of support

V Review SPARC Beam Position Monitors will be installed before, between, and after the accelerating structures, as well as in the transport sections before the undulator. BPM system parameter

V Review SPARC Vacuum pipe diameter47.4mm Stripline diameter39.4mm Stripline angular width~30degree Stripline length13.6cm Characteristic impedance50  Strips thickness1mm Max of transfer impedance2.08  Sensitivity1.255mm/dB pickup design parameter Matched striplines are used in each BPM for the simultaneous readout of the horizontal and vertical positions. The intensity information can also be derived from the sum of the signals.

V Review SPARC BPM detection

V Review SPARC Charge monitor Faraday cup: defined Charge monitor from Bergoz ready to order

V Review SPARC RF deflector Bunch length Emittance Slice Emittance

V Review SPARC V. Lollo Design is complete Test complete Ready to order

V Review SPARC Targets All target position are defineted. The target in OTR or cromex. Camera: Basler IEEE1394 camera ordered and arrived Hamamtsu high efficency

V Review SPARC Bunch length Start the study to define a second method to measure a bunch length (interferometer)

V Review SPARC Control system

V Review SPARC

Type of Elements to control Magnet; RF; Vacuum; Diagnostic; Laser.

V Review SPARC Operating system download Data storage Data base Electronic logbook Web information Automatic acquisition MagnetVacuumDiagnostic

V Review SPARC Using DAFNE Control system software

V Review SPARC

Using DAFNE Control system software Dafne front end CPU ported in new configuration Service program under test Starting program under test and some control window under porting and test

V Review SPARC Control room Ready at the end of October

V Review SPARC Control room 5 CPU with 2 monitor and two Ethernet connection 10/100/ server 1 service CPU 1 optical switch CISCO in home 3 switch 10/100/1000 CISCO in home

V Review SPARC Network

V Review SPARC Magnet To control a magnet means to control a power supply. 9 Solenoids Modbus protocol 12 Quadrupoles Bendigs 12 Steering correctors Software is imported from Dafne control system

V Review SPARC RF Modulators: come with an Ethernet interface. It is based on Siemens PLC it send at 10Hz the complete status. Amplifier (Milmega) is remote controlled trough Ethernet Defined number and type of control 50 pulse shape phase and amplitude readout digitizer 15 attenuator and phase shifter motorized 4 analog signal 6 digital I/O

V Review SPARC Vacuum Pump 24 –3 Analog signal –1 digital input –1 digital output Ethernet as field bus. Vacuumeter 6 –serial interface acquired an Ethernet to serial converter with 8 port software start development software under test

V Review SPARC Diagnostic Acquisition camera. –Acquisition software installed in TTF2 and working (12 fps on 100Mbit Ethernet) IEEE1394 Flag movement. –Stepper motor. BPM reading. –Ethernet interface Charge monitor reading –Electronic from Bergoz

V Review SPARC PhD student 1 Diagnostic a 1 Control system 1 equivalent people form RF group Full support from DAFNE control group Rome 2 Rome 1

V Review SPARC Schedule February 2004 definition control room October 2004 full definition of all part of the control system. Half of the 2004 start with the test of some part of the control system OK. End of the year first implementation of the control. October 2004 control room ready