1 17th July 2008#4-CTF3 Committee1 CA.BHB 0400CA.SNH 0110CA.SNI 0120 CA.VVS 0100 CA.DHG/DVG 0130 CA.VVS 0200 CA.MTV 0215 CA.BPM 0220 CA.DHG/DVG 0225CA.SNG 0230CA.SNG 0250 CA.BPM 0240CA.BPM 0260CA.BPM 0310CA.BPM 0380 CA.DHG/DVG 0245CA.DHG/DVG 0265CA.DHG/DVG 0320CA.DHG/DVG 0385CA.DHB/DVB 0270 CA.ICT 0210 CA.VVS 0300 CA.QFD 0350CA.QFD 0360CA.QDD 0355 CA.BPR 0370 CA.BPM 0410 CA.MTV 0390 CA.MTV 0420 CA.VVS 0500 CA.SDH 0340 CA.DHB/DVB 0230CA.DHB/DVB 0250 ACS 0230ACS 0250ACS 0270 DUMP 0450 TBTS ITL CA.MTV 0125 (virtual cathode) CA.FCU 0430 CALIFES STATUS

2 17th July 2008#4-CTF3 Committee2 CALIFES STATUS: Mechanics/installation Work done on week 27 Laser Beam Transportation: work completed ! - all the line is under vacuum @ 30 Torr (0.04 atm)  no leakage - change of the spring which held the lenses - completion of the protection caps on laser table Pumping ~ in the middle of the transport line Vacuum gauge near the PI table 1/3

3 17th July 2008#4-CTF3 Committee3 CALIFES STATUS: Mechanics/installation Work done on week 27 Observation: problem of quadrupoles positioning compared to the vacuum chamber center  the 3 quad. have been re-centered at ~±0.25mm compared to the vacuum chamber center (magnetic axis = mechanic axis) 2/3

4 17th July 2008#4-CTF3 Committee4 CALIFES STATUS: Mechanics/installation Remaining “mechanical” work for end of July-August VPM#2 – CA.MTV 0420:  recovery of the piece used for mirror introduction  important leakage detected  new installation foreseen on week 30 VPM#1/2/3 – CA.MTV 0215-0390-0420:  protections necessary for superior part of VPMs chambers  Lead shielding necessary to protect cameras from radiations  General vacuum test for CALIFES foreseen from week 30 or beyond ? (CERN) Power Phase Shifter: in klystron gallery (CERN)  provide water arrival for the Power Phase Shifter 3/3

5 17th July 2008#4-CTF3 Committee5 CALIFES STATUS: Bake out temperature Following temperatures should not be exceeded during the bake out of the line between the injecting gun and the 1 rst LIL section Is a temperature monitoring foreseen during bake out ? ICT Bergoz will not be able to tolerate an higher temperature than 100°C

6 17th July 2008#4-CTF3 Committee6 CALIFES STATUS: Laser system Work done on week 25 and 28: Main objective  Installation of the Pulse Picker and test it: with synchronisation coming from the Masterclock instead of the final fine synchronisation Good rise and fall time have been checked  OK “plateau”  OK, no discontinuity transmission measured = 81%  in agreement with measurements made in the lab in Saclay

7 17th July 2008#4-CTF3 Committee7 CALIFES STATUS: Laser system Work done on week 25 and 28: No measurements in CLEX with camera (Pulse Picker + transport), due to too low UV energy (0.3nJ)  tests are reported to beginning of September Checking of CLEX camera: signal doesn’t go up (even with a CERN camera)  this problem has been solved ? The lines for sensing UV beam at the output of the laser table have been installed The line sensing the profile at the output of BBO uses the same mounting and UV converter as the sensing in CLEX

8 17th July 2008#4-CTF3 Committee8 CALIFES STATUS: BPMs 1/2 Work done on week 26:  CA.BPM0220, CA.BPM0240, CA.BPM0260, CA.BPM0310, CA.BPM0380, CA.BPM0410 BPM Frequencies and the factors of quality of the monopole and dipolar modes were measured on the 6 BPMs Fréquence (MHz) Mode monopolaire Facteur qualité monopolaire Fréquence (MHz) mode dipolaire Facteur qualité dipolaire Cross-talk (dB) CA.BPM 0220398527598747.526 CA.BPM 0240397928.559815243 CA.BPM 0260398826.559875128 CA.BPM 0310399126598546.527 CA.BPM 038039902559925230 CA.BPM 041039952759925132 Example of transmission and reflexion of all modes on 1 BPM on 1 slot Similar results from one BPM to another, and in-situ results are comparable to Saclay in-lab measurements Cross-talk  26dB  OK

9 17th July 2008#4-CTF3 Committee9 CALIFES STATUS: BPMs 2/2 Work done on week 26: Electronics boxes were installed in the CLEX In the BPMs rack (CLEX-G), the various crates and cables were installed Work planed by the end of July (week 29 or 30): Replacement of the LEMO cables + flat cables in CLEX-G Problem discovered with one Acqiris board (1 channel is out of order)  board sent to Agilent company for repair (at least 4s-8s of delay min ?)  M. Draper try to provide us another board temporary during this period

10 17th July 2008#4-CTF3 Committee10 CALIFES STATUS: Control Command of BPMs Work done on week 26-28:  thanks to S. Deghaye’s, etc … 1/Readout of acqiris board signals on OASIS  OK 2/Signal processing  OK 3/Results sent on graphic windows under JAVA  ±OK The 6 BPMs are implemented (command of the BPMs switchs remotely from control room is not yet tested) Work planed to be completed by the end of August: BPMs Control Command: soft written but still some difficulties for communication with the database (not updated), transfer and tests of acqiris boards to their final rack BY064-XG have to be done, with help of CERN team ?  task on critical path

11 17th July 2008#4-CTF3 Committee11 CALIFES STATUS: Control Command and database CALIFES Missing components in Database (status on 11th July 08): CALIFES Components already in Database (status on 11th July 08): Working set  OK for: RF measured signals Solenoids (3) Quadrupoles (3) Dipole (1) Correctors (14 over 18) Working set  not implemented yet for: LLRF commands MKS30 commands RF Timing commands BPMs signals (CA.BPM0220,etc …) VPMs signals (CA.MTV0215, etc …) vacuum ?  We need also some help to transfer/install our software on a Control Room PC

12 17th July 2008#4-CTF3 Committee12 CALIFES STATUS: Conclusion End of “mechanical” tasks MTVs (Video Profile Monitors): electrical adaptation under progress and Control Command have to be done in Summer-September, with help of CERN team ?  task on critical path BPMs (Beam Position Monitors) Control Command: soft written but still some difficulties for communication with the database (not updated), transfer and tests of acqiris boards to their final rack BY064-XG have to be done, with help of CERN team ?  task on critical path Transport of the UV laser beam down to the photocathode, with Pulse Picker working in specifications  energy still too low, and have decrease last week … RF Power Phase Shifter: Specifications document re-defined and sent to the contractors for acceptation and signature (CEA would manage directly the brazing company for mode convertors  official separation of machining and brazing tasks). New order is under progress. We foresee an installation during the shutdown (beginning of 2009).