1 Installation status and planning
G. Di Pirro Review SPARC

2 Summary E-meter unistall AFT attenuator test
Wayguide network modification Accelerator installation Allineament Fluid Magnet Power supplies Control system Diagnostic Planning Review SPARC

3 February 2006 start of mesaure with the e-meter
measure Energy and Energy Spread for each position Review SPARC

4 04 Dicember 2006 end of mesaure with the e-meter
Review SPARC

5 Review SPARC

6 E-meter unistall Docember 2006 unistall of e-meter
January 2007 exposition in the Rome auditorium in the “Festival della scienza” The e-meter is now in the SPARC hall we are different requetst to use in other laboratory Trieste, CTF, Pitz, .... Review SPARC

7 Review SPARC

8 AFT attenuator test During the first operations we have found some problems with the attenuator; During the e-meter work period we start some test on the attenuator. Review SPARC

9 STATUS of the waveguide power attenuators
● The attenuators have been intensely power tested. ● The design power levels have not been achieved. ● Internal discharges occurred at about 10 ÷ 15 MW input power ● Discharges take place in the circulator section that contains ferrite bars. ● This could be due to excessive outgassing rate of the ferrites under high RF power operation. ● Two units have been already delivered back to the manufacturer ● A meeting with the manufacturer is foreseen next week in Germany S-band waveguide attenuator Review SPARC

10 CIRCULATOR FERRITE BARS 12 MW input power Review SPARC

11 The attenuator have been sent to AFT to solve the problem;
The next week we will go to the AFT to talk about the problem. Review SPARC

12 Wayguide network modification
The problem find with the attenuator have forced to modify the wayguide network. Review SPARC

13 Original wayguide network
Review SPARC

14 New wayguide network Review SPARC

15 Review SPARC

16 Review SPARC

17 Review SPARC

18 Alignment The alignment has been executed and has been made a first control after the installation of wayguide and fluid connection The realization of hole for the SPARC Lab laser imply the new test of the posistion The corrector installation wait the end of allineament Review SPARC

19 Review SPARC

20 Review SPARC

21 Review SPARC

22 Review SPARC

23 Review SPARC

24 Review SPARC

25 Review SPARC

26 Review SPARC

27 Review SPARC

28 Review SPARC

29 Review SPARC

30 Review SPARC

31 Review SPARC

32 Review SPARC

33 Review SPARC

34 Fluid The installation of fluid system is completed
The system is under test The PLC system must include the second accelerator unit solenoids and the corrctor Review SPARC

35 Review SPARC

36 Review SPARC

37 Magnet Power supplies The solenoids PS is installed and connected
The corrector PS is installed and wait the corrector installation to complete The dipoles PS is under costruction to the first dipole we use a DAFNE PS The quadrupoles PS is under definition for the first 3 quads on the dogleg we use a DAFNE PS Review SPARC

38 Review SPARC

39 Review SPARC

40 Review SPARC

41 The ENEA quads The quadrupoles are positioned and must be allineated
The power supplies are under test in the ENEA lab. Review SPARC

42 Control system The use of the control system has been totally satisfactory; All basic window for the magnet are developed and used Some specific window to use in automati operation with the e-meter are developed; The automatic acquisition are tested; The first version of elctronic logbook are used satisfactory. Review SPARC

43 New feature for the control system
New e-logbook based on SQL database are developed; New class of element are introduced and wait to the with the beam. Review SPARC

44 Diagnostic The image diagnostic are completaly tested;
Toroidal current monitor are tested; BPM are start develop with the hardware; Some new diagnosti are planned and installed just after the gun. Review SPARC

45 Modified desing Original desing Review SPARC

46 RF DEFLECTOR Copper cells and tuners RFD in the LNF oven
-The RF Deflector will be used for longitudinal phase space characterization and slice emittance measurements; -It has been successfully designed and realized and it is now installed in the SPARC LINAC; -The device has been LNF; Copper cells and tuners RFD in the LNF oven Review SPARC

47 RFD under test: before and after each brazing step RF measurements have been performed
RFD installed in the LINAC with cooling system Reflection coefficient at the coupler input port Tuned magnetic field on axis Review SPARC

48 Authorization Request from National Fire Department;
Realization of a secure area in the stairs from SPARC hall and connection tunnel; Installation of fire-plug in the SPARC hall; Close all hole beetwen the different hall; Remove two allineament column behind the gun. Review SPARC

49 Autorization Request from radioprotection; Realization 2 beam dumper;
Closing of all the passages round the clean room; Installation of security switch in the seeding’s clean room. Realization of operation document. Review SPARC

50 Planning End july october 2007
End PLC program to include the second series of solenoids; Connection of all magnets and test of programs; Cabling of all diagnostic system and test Installation alignment of ENEA Quadrupoles PS ENEA allineament Start with accelerator section conditioning. Review SPARC