Presentation is loading. Please wait.

Presentation is loading. Please wait.

Diagnostic & Control Status

Similar presentations


Presentation on theme: "Diagnostic & Control Status"— Presentation transcript:

1 Diagnostic & Control Status
G. Di Pirro IV Review SPARC

2 Diagnostics GUN Emittance BPM Charge Emittance measure RF deflector
Energy and Energy spread IV Review SPARC

3 Movable Emittance-Meter
envelope IV Review SPARC

4 In the last review we have the final project
V. Lollo IV Review SPARC

5 Now we have the object IV Review SPARC

6 Target YAG Cromex We continue test in the DAFNE BTF
IV Review SPARC

7 BTF YAG MEASUREMENTS Test acuisition system for the e-meter (digital camera with a commercial optics with 1:1) Qualitative study of the YAG screen compared with other know screen (CROMOX) IV Review SPARC

8 MEASUREMENT SCHEME: Yag screen Macro lens (1:1) Basler camera
Firewire interface IV Review SPARC

9 MEASUREMENTS: CROMOX VS YAG (SAME BEAM) GRADIENT PALETTE
IV Review SPARC

10 ANALYSIS (1): 150pC CROMOX (AU) YAG (AU) IV Review SPARC

11 ANALYSIS (2): 120pC IV Review SPARC

12 ANALYSIS (3): 50pC IV Review SPARC

13 (3) Fit dopo il taglio in frequenza dello Yag
IV Review SPARC

14 (4) IV Review SPARC

15 Beam Position Monitors will be installed before, between, and after the accelerating structures, as well as in the transport sections before the undulator. BPM system parameter IV Review SPARC

16 Matched striplines are used in each BPM for the simultaneous readout of the horizontal and vertical positions. The intensity information can also be derived from the sum of the signals. Vacuum pipe diameter 47.4 mm Stripline diameter 39.4 Stripline angular width ~30 degree Stripline length 13.6 cm Characteristic impedance 50 W Strips thickness 1 Max of transfer impedance 2.08 Sensitivity 1.255 mm/dB pickup design parameter IV Review SPARC

17 BPM detection IV Review SPARC

18 Change with a Bergoz Why?
Difficult to learn the apparatus we don’t have the time Delivered time is to high about 9 month Not clear the single pass operation IV Review SPARC

19 Faraday cup IV Review SPARC

20 Faraday cup R. Sorchetti IV Review SPARC

21 RF deflector Bunch length Emittance Slice Emittance
IV Review SPARC

22 V. Lollo V. Lollo IV Review SPARC

23 V. Lollo IV Review SPARC

24 V. Lollo IV Review SPARC

25 Targets All target position are defineted. The target in OTR.
Camera: Basler IEEE1394 camera buy Hamamtsu high efficency IV Review SPARC

26 Control Status IV Review SPARC

27 IV Review SPARC

28 IV Review SPARC

29 Operating system download
Data storage Data base Electronic logbook Web information Automatic acquisition Magnet Vacuum Diagnostic IV Review SPARC

30 Using DAFNE Control system software
IV Review SPARC

31 IV Review SPARC

32 Using DAFNE Control system software
Dafne front end CPU ported in new configuration Service program under test Starting program under test and some control window under porting and test IV Review SPARC

33 Control room IV Review SPARC

34 Control room IV Review SPARC

35 Control room IV Review SPARC

36 Control room 5 CPU with 2 monitor and two Ethernet connection 10/100/1000 1 server 1 service CPU 1 optical switch CISCO in home 3 switch 10/100/1000 CISCO in home IV Review SPARC

37 Network IV Review SPARC

38 Network IV Review SPARC

39 Network IV Review SPARC

40 Network 2 2 2 2 2 2 IV Review SPARC

41 SOFTWARE IV Review SPARC

42 Magnet To control a magnet means to control a power supply.
9 Solenoids Modbus protocol 12 Quadrupoles + 8 3 Bendigs 12 Steering correctors Software is imported from Dafne control system IV Review SPARC

43 RF Modulators: come with an Ethernet interface. It is based on Siemens PLC it send at 10Hz the complete status. Driver tested and start portin under control system. Amplifier (Milmega) is remote controlled trough Ethernet Defined number and type of control. Software under development 50 pulse shape phase and amplitude readout digitizer 15 attenuator and phase shifter motorized 4 analog signal 6 digital I/O IV Review SPARC

44 Vacuum Pump 24 software completed Vacuumeter 6 software completed
3 Analog signal 1 digital input 1 digital output Ethernet as field bus. Vacuumeter 6 software completed serial interface acquired an Ethernet to serial converter with 8 port IV Review SPARC

45 Diagnostic Acquisition camera. Flag movement. BPM reading.
Acquisition software installed in TTF2 and working (12 fps on 100Mbit Ethernet) IEEE1394 Software under test Flag movement. Stepper motor. Driver completed software under development BPM reading. PCI board Charge monitor reading Electronic from Bergoz acquisition with PCI multimeter IV Review SPARC

46 IV Review SPARC

47 IV Review SPARC


Download ppt "Diagnostic & Control Status"

Similar presentations


Ads by Google