CORP3397 Clarification Meeting Technical Evaluation of Meters Enquiry Date: 5 February 2016 Presenter: Mohamed Omar.

Slides:



Advertisements
Similar presentations
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
Advertisements

GE Electricity Metering School October 2~6, 2000
Offsite Storage RAF/2013/00023 Compulsory Briefing Session 16 August 2013 The Road Accident Fund.
STAMI (ST Advanced Metering Interface) Web Tool for the advanced management of LV Network Trends in Power Industry in the European Context VIII Antonello.
COMPULSORY BRIEFING SESSION Office Space for the RAF Johannesburg branch RAF /2014/00029 Date: 21 November 2014 Time: 11:00.
GPA Renewable Energy Resource for Guam Power Authority
 Contracts  Subcontracting  Suppliers  Complaints  Corrective and preventive actions (CAPA)  Internal audits  Management reviews Management requirements.
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00031 Date: 15 January 2013 Time: 09:00.
Sensor Technology List HERE the name of the TWO sensors you are discussing in this document YOUR NAME HERE DATE HERE.
CR1000s are only one part of a data acquisition system. To get good data, suitable sensors and a reliable data retrieval method are required. A failure.
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2015/00007 Date: 22 May 2015 Time: 11:00.
Data Logger for Water Meter Function Continuously counts pulses from pulse output of the water meter (or other meters with pulse output) and periodically.
Resources Group Specialist Transport Pre-tender Event 7 th October :30am -1:30pm Northgate House Conference Centre, Warwick.
TS16949 requirements Subjects –Audit planning –Recertification audit requirements –Auditing Remote supporting functions.
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2014/00009 Date: 26 March 2014 Time: 11:00.
ROAD ACCIDENT FUND NON COMPULSORY BRIEFING SESSION RFP /2013/00021 Date: 22 July 2013 Time: 11:00.
Testing: Chapter 13 "You make it, I’ll break it".
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Security Equipment RAF/2012/00042 Compulsory Briefing Session 15 April 2013 RAF – Centurion - GP.
COMPULSORY BRIEFING SESSION Maturity Assessment and implementation recommendation for ITIL V3, COBIT 5 and KING III Chapter 5 RAF /2015/00016 Date: 04.
FDA Docket No. 2004N-0133 Themes for Renewal of 21 CFR Part 11 Rule & Guidance by Dr. Teri Stokes, GXP International
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2014/00008 Date: 24 March 2014 Time: 11:00.
EU-TURKEY CHAMBER FORUM PROJECT (ETCF) ETCF is funded by the European Union. 1 EU-TURKEY CHAMBER FORUM EU TURKEY CHAMBERS PARTNERSHİP GRANT SCHEME PROCUREMENT.
Power Probe The PSP Power Probe is a three phase data logger, quality of supply monitor, and remote terminal unit for demand-side- management. Historical.
Narrative reporting: good practices. Joint Technical Secretariat Seminar for Beneficiaries February 2012 Narva, Estonia.
The CLI uses a hierarchical structure for the modes. In order from top to bottom, the major modes are: User mode Privileged mode Global Configuration.
SAAMF Roadshow Durban CSIR NML Eddie Tarnow Metrologist: Torque & Automotive 14 June 2006 ISO/TS 16949:2002 certification – Meeting the requirements of.
Design Documentation Clint Kehres, Brian Krouse, Jenn Shafner.
Over View of CENELC Standards for Signalling Applications
ENQUIRY NO. CORP 3140R CLARIFICATION SESSION FOR REQUEST FOR QUOTATION FOR THE DESIGN, MANUFACTURE, TESTING, SUPPLY, DELIVERY AND OFF- LOADING OF ESTIMATED.
Quality Management Supplier Quality Requirements Clarification Meeting Civil work at Dinaledi Sub Station Presentation By: Mothusi Itumeleng 16 July 2014.
Clarification Meeting: Provision of laundry services at the Kendal Contractor’s Village and Wilge Artisan Village 14 August 2015 Tender no: Tender no:
Teleprotection Equipment Clarification Meeting Tejin Gosai PTM&C 24 th April 2015.
3 Million CFL Rollout Technical Clarification 17 June 2015 : Thobela Lelibana Rajay Ramgoolam.
The Provision of Facilities Management Services to Eskom Real Estate (ERE) Corporate & Zone office buildings in Gauteng Clarification Meeting on 26 February.
Kuwait Oil Company Commercial Support Group Supplier Relationship Management Team PRE-QUALIFICATION OF CONTRACTORS AND MANUFACTURERS 2016.
Group Technology HV Plant By: Sakkie van AardeDate: Slide: 1 of 5 Fault Path Indicators CLARIFICATION MEETING Presented by: Sakkie van Aarde.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
QUALITY 10 July 2015 CORP 3268 – DIGITAL TRANSDUCERS.
2016/06/211 Provision of Civil Works at Simmerpan Substation PS(PDP)2015/FM/15 Date : 10 July 2015.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Step 1 in the evaluation process No Returnable Document/ Schedule File AFile BFile C Basic Compliance Tenderer’s tick box √ All mandatory requirements.
LIFE+ Project evaluation and selection Markéta Konečná 9 April 2013.
SAIEE Smart Grid Conference 2016: “Accelerated Environmental Stress Testing (AEST) for Smart Electricity Meters” By Shawn Papi Eskom Research, Testing.
Made in the United States of America DescoEMIT.com EMIT ESD RESULTS AT YOUR FINGERTIPS.
SHE Requirements Clarification Meeting Date:17 November 2014 Compiled: Nompumelelo Kaule.
16 March 2015 RFP GEN3261 Clarification meeting: Tutuka Coal Terminal Handling Service.
Invitation to Tender No The Provision for Polygraph Test Services Period 5 Years CORP 3293.
KUSILE POWER STAION PROJECT PROVISION OF CAR WASH SERVICES ENQUIRY NUMBER : MPP (SC) DATE: 19 SEPTEMBER 2014.
Quality Management Supplier Quality Requirements The Manufacturer, testing at works and supply of various distribution cut- outs for wires business on.
CORP3341 Clarification Meeting Technical Evaluation of Metering Substation panels and modules Enquiry Date: 27 November 2015 Presenter: Henri Groenewald.
Quality Management Supplier Quality Requirements Clarification Meeting Media Monitoring Mothusi Itumeleng.
SOFTWARE TESTING TRAINING TOOLS SUPPORT FOR SOFTWARE TESTING Chapter 6 immaculateres 1.
DIGITAL MULTIMETER DMG
COMPULSORY BRIEFING SESSION Maturity Assessment and implementation recommendation for ITIL V3, COBIT 5 and KING III Chapter 5 RAF /2015/00016 Date:
Tender Briefing Session COR34/2016
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2014/00009
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RFP /2017/00033 Supply and delivery of Corporate Uniform Date: 07 July 2017 Time: 11:00.
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2015/00007
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00031
ESD RESULTS AT YOUR FINGERTIPS
Offsite Storage RAF/2013/00023 Compulsory Briefing Session
ROAD ACCIDENT FUND NON COMPULSORY BRIEFING SESSION RFP /2013/00021
Security Equipment RAF/2012/00042 Compulsory Briefing Session
Enterprise Project Portfolio Management Solution RAF/2014/00012 Compulsory Briefing Session Centurion 31 March 2014.
METER SPECIFICATIONS.
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2015/00007
Passenger Mobility Statistics 21 May 2015
PowerLogic™ offer for the basic metering market
Presentation transcript:

CORP3397 Clarification Meeting Technical Evaluation of Meters Enquiry Date: 5 February 2016 Presenter: Mohamed Omar

2 Meter Enquiry Meter Type 1Three phase programmable, class 0.2S active energy, class 0.5S reactive energy, 1A, 110V transformer operated meters, surface mount, 4 programmable pulse outputs, RS232 & RS485 communication ports 2Three phase programmable, class 0.2S active energy, class 0.5S reactive energy, 1A, 110V transformer operated meters, 19" rack mount, 6 programmable pulse outputs, RS232 & RS485 communication ports 3Three phase programmable, class 0.5S active energy, class 1 reactive energy, 1A, 110V transformer operated meters, 4 programmable pulse outputs, RS232 & RS485 communication ports 4Three phase programmable, class 0.5S active energy, class 1 reactive energy, 5A, 400V transformer operated meters, 4 programmable pulse outputs, RS232 communication port 5Single phase programmable, class 1 active energy, class 2 reactive energy, 100A, 230V whole current meters, 1 programmable pulse output, RS232 communication port 6Three phase programmable, class 1 active energy, class 2 reactive energy, 100A, 400V whole current meters, 1 programmable pulse output, RS232 communication port 7Three phase programmable, class 1 active energy, class 2 reactive energy, 160A whole current meters, 1 programmable pulse output, RS232 communication port 8Single phase single rate, class 1, 100A whole current meters 9Three phase single rate, class 1, 100A, whole current meters

3 Technical evaluation - Meters Technical evaluation will be conducted over three phases per meter type Phase 1: Gatekeeper evaluation, Product A&B Schedules, Risk and Support Duration: 1 month Phase 2: Meter and software evaluation Duration: 4 months Phase 3: Accelerated environmental stress testing (if required) Duration: 4 months NB: No previous evaluations, supply agreements and contracts has any input on this evaluation. Completely independent process

4 Gatekeeper, A&B Schedules and Risk & Support Questionnaire – Excel Sheets The excel files, contains the following sheets that need to be completed: General questionnaire Technical gatekeepers A&B schedule Risk and Support Questionnaire Deviation Schedule (Control of new products and version changes document ) All information must be completed in electronic format in the Excel sheets requested. Excel sheets should also be completed in PDF/Hard copy for audit trail purposes Do not password protect the Excel sheets.

5 Gatekeeper, A&B Schedules and Risk & Support Questionnaire – Excel Sheets Cont Each tender shall pass all Technical Gatekeeper criteria as listed in the relevant excel files under “Gatekeepers” Tenders not meeting any of the Technical Gatekeepers shall be immediately excluded from any further evaluation. Include all relevant supporting documents, references. No documents would be accepted subsequent to the tender close. Suppliers to provide 2 x prototype devices by the 07 April 2016 at 10h00, per item, for which a tender is being submitted. The respective meter software shall also be submitted for evaluation Probes for the configuration of the meter shall also be submitted if the meters are not compatible with the standard Eskom optical probe, type Kocos METES OPO2 Failure to provide above prototypes and software, on the required submission date, shall result in the exclusion from any further evaluation.

6 Technical Scoring Breakdown Cont Technical Evaluation CriteriaWeighting Product A&B Schedules, Risk and Support (phase 1)60 Meter and Software Evaluation (phase 2)40 Total100 Minimum threshold for qualification82% Phase 1 Technical scoring breakdown Phase 1 – Technical Sub-CategoryWeighting Product A&B Schedules60 Risk & Support40 Total100 Minimum threshold for qualification80%

7 Technical Scoring Breakdown Phase 2 Technical scoring breakdown Phase 2 – Technical Sub-CategoryWeighting Meter & Software Evaluation100 Minimum threshold for qualification85%

8 Phase 2 – Meter & Software Evaluation Prototype meters and their respective software shall be functionally evaluated and tested against the requirements of the respective specifications Software Evaluation Security features of the software Tariff implementation through software Miniflex scheme evaluation Remote verification (applicable to programmable meters) MV90 and MVLT compatibility test (applicable to programmable meters) Status alarms and event recordings

9 Phase 2 – Meter & Software Evaluation Cont Meter Evaluation Physical dimensions and attributes i.e. terminal arrangements, dimensions, screws, sealing, communication ports and pulse outputs Compatibility of with the Eskom optical probe, type METES OPO2 Laboratory Test Accuracy testing of meters at defined test points Accuracy testing of meters under harmonic conditions Burdening on CT and VT Short time withstand current Short time withstand voltage

10 Phase 3 – Accelerated Environmental Stress Testing Eskom may choose to subject certain meter types, which have passed phase 1 and phase 2 of the technical evaluation to AEST. Vibration and drop tests Temperature and humidity cycling Supply voltage / load current profile Voltage interruptions Voltage dips Fast transient bursts Electrostatic discharges Lightning impulses Meters that subjected to AEST are required to pass all the above tests without compromising any of the meter functionality

Thank you