Jeju, 13 – 16 May 2013Standards for Shared ICT Dr. Farrokh Khatibi Director of Engineering Qualcomm ATIS and the Smart Grid Document No: GSC17-PLEN-63.

Slides:



Advertisements
Similar presentations
NIST Interoperability Framework for the Smart Grid
Advertisements

Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GTSC-9 Summary Glenn Parsons, GTSC-9 Chair, ISACC Document No: GSC16-CL-04 Source: GTSC-9 Contact:
UCAIug HAN SRS v2.0 Summary August 12, Scope of HAN SRS in the NIST conceptual model.
September 30, 2011 OASIS Open Smart Grid Reference Model: Standards Landscape Analysis.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All The Internet of Things (IoT) aka Machine 2 Machine (M2M) Bilel Jamoussi Chief, Study Groups Department.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Standardization Activities on M2M communications Joachim Koss, ETSI Board Member Document No:
Jeju, 13 – 16 May 2013Standards for Shared ICT Mark Lipford Director, Global Standards and Ecosystem Development Sprint Nextel ATIS Lawful Intercept (LI)
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Brian K. Daly, Director, Core Standards AT&T ATIS’ ICT Accessibility Activity Document No: GSC16-PLEN-67r1.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Gale Lightfoot, Senior Staff Program Manager, Office of the CTO, SPB Cisco ATIS and the Smart Grid.
Standards for Shared ICT Jeju, 13 – 16 May 2013 Gale Lightfoot Senior Staff Program Manager, Office of the CTO, SPB Cisco ATIS Cybersecurity Standards.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Consolidated M2M standards boost the industry Li Li (Thomas) CCSA(Huawei) Document No: GSC16-PLEN-73.
Jeju, 13 – 16 May 2013Standards for Shared ICT HIS – Smart Grid Karen Bartleson, President, IEEE Standards Association Document No: GSC17-PLEN-72 Source:
Smart Grid Standards Bill Moroney President & Chief Executive Utilities Telecom Council.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All IEEE-SA Smart Grid Steve Mills, President, IEEE Standards Association Document No: GSC16-PLEN-47.
DOCUMENT #:GSC15-PLEN-08 FOR:Presentation SOURCE:ISACC AGENDA ITEM:Opening Plenary (4.5) CONTACT(S):Jim MacFie ISACC Activities Since GSC-14 Jim MacFie.
DOCUMENT #: GSC15-GTSC8-02 FOR: Presentation SOURCE: ATIS AGENDA ITEM: GTSC8; 4.1 CONTACT(S): Wayne Zeuch ATIS:
Smart Grid Interoperability Standards George W. Arnold, Eng.Sc.D. National Coordinator for Smart Grid Interoperability National Institute of Standards.
DOCUMENT #:GSC15-PLEN-48 FOR:Presentation SOURCE: ATIS AGENDA ITEM: PLEN 6.10 CONTACT(S): James McEachern
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Document No: GSC16-PLEN-79 Source: TIA Contact: Anil Kripalani GSC Session:
Jeju, 13 – 16 May 2013Standards for Shared ICT CYBERSECURITY-RELATED STANDARDS ACTIVITY IN THE TELECOMMUNICATIONS INDUSTRY ASSOCIATION Eric Barnhart, Fellow.
DOCUMENT #:GSC15-CL-04 FOR:Presentation SOURCE:CCSA AGENDA ITEM:Closing Plenary, 2.3 GTSC-8 Summary Report Duo Liu GTSC-8.
DOCUMENT #:GSC15-PLEN-53 FOR:Presentation SOURCE:ETSI AGENDA ITEM:PLEN 6.11 CONTACT(S):Emmanuel Darmois, Board Member Marylin Arndt, TC M2M chair Smart.
DOCUMENT #: GSC15-GTSC8-06 FOR: Presentation SOURCE: ATIS AGENDA ITEM: GTSC8; 4.2 CONTACT(S): Art Reilly ATIS Cybersecurity.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All SMART GRID ICT: SECURITY, INTEROPERABILITY & NEXT STEPS John O’Neill, Senior Project Manager CSA.
1 Re-energizing America: Establishing Standards for a Nationwide Smart Grid Dean Prochaska National Coordinator for Smart Grid Conformance National Institute.
Geneva, Switzerland, April 2012 Introduction to session 7 - “Advancing e-health standards: Roles and responsibilities of stakeholders” ​ Marco Carugi.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Security activities in ETSI Presenter: Mike Sharpe, ETSI VP ESP (ETSI Standardization Projects) Document.
Jeju, 13 – 16 May 2013Standards for Shared ICT TIA TR-50 M2M-Smart Device Communications Dr. Jeffery Smith Chief Innovation and Technology Officer/EVP.
Interoperability Standards and Next Generation Interconnectivity Pankaj Batra Chief (Engineering) CERC.
DOCUMENT #:GSC15-PLEN-65 FOR:Presentation SOURCE: ATIS AGENDA ITEM: PLEN 7 CONTACT(S): James McEachern
DOCUMENT #:GSC15-PLEN-82r2 FOR:Presentation SOURCE:ATIS AGENDA ITEM: PLEN 6.14 CONTACT(S): Andrew White ATIS’
Fostering worldwide interoperabilityGeneva, July 2009 The Home Network: Where Convergence Takes Hold Tim Jeffries, VP Technology and Business Development,
Jeju, 13 – 16 May 2013Standards for Shared ICT Dr. Farrokh Khatibi Director of Engineering Qualcomm ATIS’ ICT Accessibility Activity Document No: GSC17-PLEN-65.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ATIS: Advancing the Next Generation Network Wayne Zeuch, ATIS Document No: GSC16-GTSC9-09 Source:
DOCUMENT #:GSC15-PLEN-52 FOR:Presentation SOURCE:ATIS AGENDA ITEM:PLEN 6.11 CONTACT(S):Maria Estefania ATIS and.
Jeju, 13 – 16 May 2013Standards for Shared ICT Andrew White Principal Consultant Nokia Siemens Networks ATIS’ Cloud Services Activity Document No: GSC17-PLEN-64.
Jeju, 13 – 16 May 2013Standards for Shared ICT Recent Progress of CCSA’s Standardization Activities Hequan WU Chairman of the Council, CCSA Document No:
Jeju, 13 – 16 May 2013Standards for Shared ICT Update of ARIB Activities on IMT Standardization Yoshihide ISHIDA Director, Land Mobile Communications Group,
Jeju, 13 – 16 May 2013Standards for Shared ICT Telecommunications Standards for Smart Grids David Su National Institute of Standards and Technology Document.
Jeju, 13 – 16 May 2013Standards for Shared ICT Smart Grids activities in ETSI Presenter: Adrian Scrase ETSI Chief Technical Officer (CTO) Document No:
Jeju, 13 – 16 May 2013Standards for Shared ICT Thomas Goode General Counsel ATIS Alliance for Telecommunications Industry Solutions (ATIS) Update Document.
Jeju, 13 – 16 May 2013Standards for Shared ICT Stephen Hayes Director of North American Standards Ericsson ATIS Activities on IMT Standards Document No:
Jeju, 13 – 16 May 2013Standards for Shared ICT HIS-Home Networking Karen Bartleson, President, IEEE Standards Association Document No: GSC17-PLEN-70 Source:
Jeju, 13 – 16 May 2013Standards for Shared ICT TTA activities since GSC-16 Keun Hyeob Lee, President of TTA Document No: GSC17-PLEN-39 Source: TTA Contact:
Jeju, 13 – 16 May 2013Standards for Shared ICT TTA M2M Activities & Proposal of revised resolution Peter J. Kim, Principal Specialist, TTA Document No:
Jeju, 13 – 16 May 2013Standards for Shared ICT ATIS Emergency Communications (EC) Standards Development Dr. Farrokh Khatibi Director of Engineering Qualcomm.
DOCUMENT #:GSC15-PLEN-82 FOR:Presentation SOURCE:ATIS AGENDA ITEM: PLEN 6.14 CONTACT(S): Andrew White ATIS’
Jeju, 13 – 16 May 2013Standards for Shared ICT oneM2M Project Presenter: Luis Jorge Romero oneM2M Steering Committee Chairman Document No: GSC17-PLEN-38.
ATIS’ Machine-to-Machine (M2M) Activity
Smart Grid Standard activities in Korea
Consolidated M2M standards boost the industry
ISACC Activities Since GSC-16
ATIS Cybersecurity DOCUMENT #: GSC13-GTSC6-12 FOR: Presentation
ETSI Standardization Activities on M2M communications
Smart Grid Interoperability Standards
HIS Smart Grid – Summary (1)
Glenn Parsons, GTSC-9 Chair, ISACC
Karen Bartleson, President, IEEE Standards Association
ATIS Emergency Communications (EC) Standards Development
Standards for Shared ICT
ATIS Activities on IMT Standards
ATIS Interoperability
ATIS’ Service Oriented Networks (SON) Activity
ISACC Activities Since GSC-16
ETSI Standardization Activities on Smart Grids
TIA TR-50 M2M-Smart Device Communications
Alliance for Telecommunications Industry Solutions (ATIS) Update
Glenn Parsons, GTSC-9 Chair, ISACC
ATIS’ Machine-to-Machine (M2M) Activity
Telecommunications Standards for Smart Grids
Presentation transcript:

Jeju, 13 – 16 May 2013Standards for Shared ICT Dr. Farrokh Khatibi Director of Engineering Qualcomm ATIS and the Smart Grid Document No: GSC17-PLEN-63 Source: ATIS Contact: Farrokh Khatibi GSC Session: PLEN Agenda Item: 6.9

GSC17-PLEN-63 GSC-17, Jeju / Korea Standards for Shared ICT Highlight of Current Activities Under the United States’ Energy Independence and Security Act (EISA) of 2007, the National Institute of Standards and Technology (NIST) was given "primary responsibility to coordinate development of a framework that includes protocols and model standards for information management to achieve interoperability of smart grid devices and systems.” ATIS has been involved in NIST’s Smart Grid Interoperability Panel (SGIP) since 2009 (and has identified several areas of ICT standards involvement in SGIP’s Priority Actions Plans (PAPs)). 2

GSC17-PLEN-63 GSC-17, Jeju / Korea Standards for Shared ICT Highlight of Current Activities ATIS Wireless Technologies and System Committee (WTSC) has developed input to SGIP PAP02 (Wireless Communications for the Smart Grid) on the characteristics of four 3GPP technologies (EDGE, UMTS, HSPA+, and LTE) for inclusion as potential technologies to be used by Smart Grid. WTSC continues to work on evaluating the aforementioned 3GPP technologies against the Smart Grid requirements to assess the suitability of these technologies for meeting the Smart Grid requirements. 3

GSC17-PLEN-63 GSC-17, Jeju / Korea Standards for Shared ICT Highlight of Current Activities ATIS Machine-to-Machine Committee (M2MC) is currently reviewing use cases and requirements for the Smart Grid (SG) with the goal of facilitating input to oneM2M. ATIS’ objective is to ensure the best technical solution that fulfills U.S. requirements, while providing a harmonized and global SG framework. 4

GSC17-PLEN-63 GSC-17, Jeju / Korea Standards for Shared ICT Strategic Direction The ICT sector is uniquely well-positioned to leverage its networks and experience to enable interoperability between the Smart Grid’s intricate, multifaceted architectures and infrastructures; specifically: –Access/Transport/Delivery of Data and Services –Security and Conditional Access –Service Management Many SG flows are currently through the SG Advanced Metering Infrastructure (AMI) Network and Distribution domain –Alternate/Future flows would be through the Home Area Network (HAN) to a Gateway with Energy System Interface (ESI) function embedded, and then into the carrier Access-IP Core to centralized applications, or back to Utility Operations Local applications (e.g., in gateways in the consumer domain) must also be addressed Pursue commonalities that enable converging of platforms. 5

GSC17-PLEN-63 GSC-17, Jeju / Korea Standards for Shared ICT ICT’s Critical Role in SG 6

GSC17-PLEN-63 GSC-17, Jeju / Korea Standards for Shared ICT A Global Approach 7 North America’s Reference Model: ITU’s Reference Model:

GSC17-PLEN-63 GSC-17, Jeju / Korea Standards for Shared ICT Challenges Regulatory considerations that could be regional specific: Consumer Privacy –3 rd party access to usage, billing, and pricing data –Municipal and local requirements to Critical Infrastructure Protection –Cyber-security –Cyber asset management Consumer Pricing Notification –State requirements associated with delivery of price signals and other consumer demand information Net Energy Metering –Settlement rules associated with micro/distributed generation Renewable Energy Generation Mandates Wireless Spectrum Allocation 8

GSC17-PLEN-63 GSC-17, Jeju / Korea Standards for Shared ICT Next Steps/Actions Efforts in the U.S. to enable a Smart Grid are well underway. –These efforts are well populated by the relevant stakeholders including ICT, power/utility companies, and international Standards Development Organizations (SDOs) –Leverage the work done in the U.S. and other regions to enable a global set of standards –Leverage Use Case assessment(s) to precipitate common requirements and specifications with other M2M verticals 9

GSC17-PLEN-63 GSC-17, Jeju / Korea Standards for Shared ICT Proposed Resolution ATIS supports the reaffirmation of the Resolution (GSC-16/29) on Smart Grid. 10