Entrance/Exit onto West Grand Avenue 1 st Church of the Nazarene is the completed building at the top of the picture.

Slides:



Advertisements
Similar presentations
What's your favorite sport?
Advertisements

12/16/2010 LINC KENTWOOD 52 nd STREET PLANNING 52 nd Street and Kalamazoo Concept #1 Two plazas at intersection of 52 nd and Kalamazoo fronted with curved.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Front view of coach house (photographer facing west) Front view of coach house (facing north-west)Side view of coach house (facing south) Rear view of.
University of Connecticut-Stamford Campus Safety Orientation
How to get from the Nebraska Parking lot to the Mary Graydon Center.
Sports Complex Proposal GARY ROBERTS AND TRAVIS PALMER.
Alliant Energy Field Renovation. September 2005 Work area blocked off Pitching mound is flattened.
Turns Right Angles Angles Angles ©mdhazrin. One Complete Turn 90   1 round clockwise Angles: Angles: Turns & Right angles 90   360  ©mdhazrin.
U-M Construction Forecast; April 2013 U-M Construction Forecast Spring – Fall 2013 As of April 25, 2013 Prepared by AEC Preliminary & Advisory.
PTO Back to School Night Introduction to our new Access Drive “We are committed to making our school and community safer”
Independence Blvd. (Hwy 74 West) Toward downtown Charlotte Prepare to exit right (exit 243) Charlottetowne Ave.
Kelly Bresnowitz Jamey Hogarth Rachel Lacek.  Elizabethtown College has been growing since it opened in  Enrollment increases faster than facility.
Terrace Park School Recess Rules for Safety. Terrace Park Recess Boundaries Stairs and Bridges Gym Commons Sundial Off Limits Big Toy New Toy East Field.
By: Scotty Tubbs. In the final results of the park survey a lot of surprising things were found out. One of the things was that a ton of people would.
Alpha Borough Community Recreation Project Preliminary Design Presented by Group 3 February 28, 2002 From left to right: Pamela Vislocky, Erin O’Brien,
CitywallCitygate St James Boulevard Newcastle Upon Tyne NE1 4JH Tel: +44 (191) By Road There is a pay and display parking facility to the front.
Directions to Camera Point: From the parking lot, head south along the path until the three way intersection by the restrooms. Turn east and there will.
Puerto Rico. 9 lanes Wall measures 8 feet tall, then open up to the roof.
By: Chris Kerlin July 6, 2012 MAA 587.  Three parts  Sports Hall Improvement  Lower Gym Expansion  Swimming Pool Development.
I am a conscientious consumer and can locate health services in my community *King county Aquatic Center Swimming pool *Federal way Community center *Fitness19.
EMPIRE FITNESS CLUB Rodney Bettcher Matt Schwitz Steve Clancy.
Bar joist over kitchen and band room. Setting bar joist over kitchen and electrical/mechanical rooms.
Presented and arranged by: Jason Vila and Sergio Castillo.
F ACILITIES S ERVICES D EPARTMENT M EETING P OSITION R EVIEWS Presented by: Ray Nelson, Carpenter & Dave Gazeley, Heat Plant Operator.
Come on! Let’s take a field trip to the Timberline High School Pool.
Northwest ISD Samuel Beck Elementary School Addition and Renovations, 2012.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Pleasant Grove. The Task What items must be included/addressed in the Master Plan of Pleasant Grove that the County will undertake?
MASTER PLAN FEBRUARY 15,2012.
Adams-14 School District Facilities Master Plan Kearney Middle School Focused Site Evaluation SITE DRAINAGE OBSERVATIONS General – Site drainage was primarily.
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
Lake Chelan Aquatics & Community Center Vision With A View
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
Billy Aubut Family Met wife in High School 2 year old son, Wilson.
This question speaks to primary ownership of the room décor. Will the space be designed for contemporary worship that youth will be allowed to occupy.
Galesburg C USD 205 · PSA–Dewberry · Russell Construction Company · Metzger Johnson IEFM Engineering · Bruner, Cooper & Zuck · Johnson Building Systems.
1 Cathcart Road Planning Drawings CR/1/P/15 Philip Challinor 3 Cathcart Road m Position of photos Photo showug.
Chapter 15 Site Plan Layout. Driveway style and Slope Design Considerations  Minimum lawn slope of 5% for first 10’ (5/8” per foot)  Minimum concrete.
By: KB Geometry 4. Parallel Lines The lines in the road form parallel lines. This picture was taken off of the road that my grandmother lives on.
Recreation CenterRecreation Center The heart of Middletown.
Garage Swimming pool Climbing frame Bike rake Car.
Joint Agreement for Use of Washington Middle School Gymnasium.
Community Center Facts. How much will it cost to build the community center and pool, and how will it be funded? Total estimated cost for the Community.
Football Post Traffic Set UP
The Campus 2.06 Acres or 89,734 sq ft of Land 25,058 sq ft Church Building 4,239 sq ft Sanctuary 497 sq ft Balcony 20,322 sq ft Multipurpose.
Turn right onto Bethany Home Road.
Area (Name MUST be on list)
Area (Name MUST be on list)
Area (Name MUST be on list)
The neighbourhood Click Here To Start
Sherwood Drive Wolfville
Charleston Real Estate Group | 792 Folly Rd. C1 | Charleston, SC 29412
Amazing Natural Light & Great Outdoor Living
 RPS PALMS FLOORS ARE THE BEST HOUSING PLACE IN FARIDABAD. IT IS LOCATED IN SECTOR 88 OF GREATER FARIDABAD AND HAS LUXURIOUS APARTMENTS AND A BEAUTIFUL.
Pictures and cars.
INDOOR BASEBALL / SOFTBALL FACILITY
By: Miss Kelsey.
Changes to Pace Master Campus Plan 1. Pod A Tear down Randall House, build new Lower School building in its place. Add new parking in front. 2.
Extra-Curricular Program Design Athletics/Music/Recreation
Progress Report 11/10/11.
Capital Improvements Completed
Special Valuation Hobson Building 1213 West Railroad Avenue
Side view Top view. Side view Top view To take a compass reading the compass must be level Level the compass with the Bubble level. When its level.
Food Stand and Restrooms
Interstate 35 Building Project Update
Recent Bond Accomplishments
S. M. C. L Foundation & Associates Inc
2600 North mailboxes.
Westview Park Fairground Road U15 Fields N W E Parking S Parking
Presentation transcript:

Entrance/Exit onto West Grand Avenue 1 st Church of the Nazarene is the completed building at the top of the picture

Looking West, Ball Field Parking Lot with Maintenance Building, Concessions Building, and Youth Baseball Restroom For Scale compare to Craig Stephenson’s White Car

Turning further East, Youth Baseball Fields within Retaining Walls with raised slope to Adult Softball Fields, Line Posts being installed in Softball Fields

Turning further east, Adult Softball Fields, with Softball Restroom Building, Retaining Wall toward Drive and raised area, Sidewalks and Line Posts

Waverly Drive Entrance, NE Softball Field, Sidewalks and Drives

Facing Intersection of Waverly and West Grand from Center of Main Parking Lot, Concrete Slab beneath Hardwood Floors for 2.5 Basketball Courts, Conc. Slab beneath Hardwood Floors for 3 Racquetball Courts, Kids Zone Floor Slab & Rock Climbing Wall Footing being formed

Turning further West, Footings for Locker Rooms, Area for Hydrotherapy Pool, Family Swim Pool, and Lap Pool, Concrete Slab over Pool Pump Room, Mechanical/Electrical Rooms